# CPSS to EN 50171: what it asks and how to size one

A CPSS (central power supply system) is a battery-backed system that keeps a building's safety equipment working when the normal supply fails, above all emergency escape lighting. [EN 50171](https://mycatalogo.ceinorme.it/cei/item/0000018393?sso=y) is the European standard for these systems, and AEC builds two ranges to it: the tower CPSS from 1 to 10 kVA and the three-phase CPSS from 10 to 200 kVA.

Reviewed by **[Bruno Grosso](https://www.aecups.com/en/about/#bruno-grosso)** and **[Eng. CP Cheng](https://www.aecups.com/en/about/#cp-cheng)**, with an associate project engineer, AEC Engineering

The standard sets requirements for how a CPSS is built, charged, monitored and tested, so that safety loads have power for the time the fire strategy requires.

**In brief**

- A CPSS supplies safety loads such as emergency lighting, smoke extraction and safety signalling from one central battery.
- EN 50171 covers central power supply systems permanently connected to low-voltage AC supplies that use batteries as the alternative source.
- The standard deals with autonomy, battery life, recharge, overload capability, monitoring and the enclosure. The required duration comes from national rules and the fire safety design.
- The battery must be sized for the full duration at the end of its life, not when it is new.
- AEC offers two EN 50171 ranges: the tower [CPSS 1–10 kVA](https://www.aecups.com/en/products/cpss-1-10/) and the three-phase [CPSS 10–200 kVA](https://www.aecups.com/en/products/cpss-10-200/).

## What is a CPSS (central power supply system)?

Power cuts often happen exactly when safety matters most: during a fire, a storm or a fault in the building's own installation. In those moments people must be able to see the escape routes, and safety systems must keep working. A central power supply system is the equipment that makes this possible.

A CPSS has three main parts. A **charger** keeps the battery full while the mains is present. A **battery** stores the energy for the emergency. An **inverter** converts the battery's direct current (DC) into the alternating current (AC) that the luminaires and other safety loads use. A control unit watches the mains, the battery and the outputs, and reports faults.

On the outside a CPSS can look like a UPS (uninterruptible power supply), and the two share many components. The difference is the job: a UPS protects equipment and data, while a CPSS protects people. Our guide on [UPS vs CPSS](https://www.aecups.com/en/blog/ups-vs-cpss/) explains this in detail.

## What does a CPSS supply?

A CPSS supplies the safety systems of a building. Typical loads are:

- emergency escape lighting and illuminated exit signs;
- circuits of automatic fire-fighting systems;
- smoke extraction equipment;
- paging and safety signalling systems;
- carbon monoxide detection and alarm systems.

Shopping centres, hospitals, museums, schools, hotels and large workplaces all rely on these systems.

### Central system or self-contained luminaires?

Emergency lighting can be supplied in two ways. With **self-contained** luminaires, every fitting has its own small battery. With a **central system**, all luminaires are supplied from one CPSS through dedicated circuits.

**Central CPSS compared with self-contained emergency luminaires**

| Aspect | Central system (CPSS) | Self-contained luminaires |
| --- | --- | --- |
| Where the battery is | One battery in a controlled technical room | One small battery in every fitting |
| Testing | From one point, with central status and alarms | Fitting by fitting, unless an addressable test system is added |
| Battery environment | Temperature can be kept under control | Batteries sit in ceilings and corridors, often warm |
| Wiring | Dedicated safety circuits from the CPSS to each luminaire | Normal lighting circuits; no central safety wiring |
| Typical fit | Medium and large buildings, many luminaires, other safety loads | Small buildings with few fittings |

A central system makes maintenance simpler, because there is one battery to look after instead of hundreds. Its weak point is the wiring: the circuits between the CPSS and the luminaires must survive a fire long enough to do their job.

## What does the EN 50171 standard cover?

EN 50171, "Central power supply systems", specifies the general requirements for central power supply systems for safety equipment. It applies to systems permanently connected to low-voltage AC supplies that use batteries as the alternative source. In Italy it is published as CEI EN 50171.

The standard does not choose the duration or the luminaires for you. Those come from the building's fire safety design, national rules and the emergency lighting standards (EN 1838 for the lighting itself, [EN 50172](https://www.evs.ee/en/evs-en-50172-2024) for emergency escape lighting systems). EN 50171 covers the supply that feeds them. In general terms it deals with:

- **Autonomy:** the system must supply the rated safety load for the required duration.
- **Battery:** batteries suited to standby duty, with a long design life.
- **Recharge:** after a discharge, the charger must restore the battery within a defined time, so the building is protected again quickly.
- **Inverter and overload:** the output must cope with the inrush and overload that safety loads can cause.
- **Monitoring:** the state of the mains, battery, charger and outputs must be supervised, with faults clearly signalled.
- **Enclosure and installation:** mechanical strength, resistance to heat and fire, and an installation that protects the system in an emergency.
- **Configurations and tests:** the possible system configurations, marking, documentation and tests.

The exact values and clauses depend on the edition in force and on national additions. Always check the current text, and national rules, with the system designer before you fix the specification.

### Fire-resistant installation

A CPSS is only as good as the path from the battery to the luminaire. Installation rules for safety services, such as IEC 60364-5-56 and national wiring rules, together with the fire strategy, normally require the CPSS to sit in a protected room or fire compartment. Safety circuits are usually wired with fire-resistant cable, kept separate from other circuits. Agree these points early.

## How long must a CPSS run, and how is it sized?

The required duration of emergency lighting is set by national rules and by the fire safety design of the building. Durations of 1 or 3 hours are common. The battery must deliver that duration at the end of its service life, which is why a CPSS battery is usually larger than a UPS battery for the same load.

Sizing has two parts: the power of the CPSS and the energy of the battery. Power ratings are given in kVA and kW; our guide on [kVA vs kW](https://www.aecups.com/en/blog/kva-vs-kw/) explains the difference.

### Worked example: emergency lighting for an office building

An office building has 120 LED emergency luminaires of 8 W each and 20 exit signs of 4 W each. The fire safety design asks for 1 hour of autonomy.

1. **Total load:** 120 × 8 W = 960 W; 20 × 4 W = 80 W; total 960 + 80 = 1,040 W.
2. **Margin for future circuits:** add 20%. 1,040 W × 1.2 = 1,248 W.
3. **Choose the CPSS:** the CPSS3-1K delivers 800 W, too little. The CPSS3-2K delivers 1,600 W (2 kVA at a 0.8 output power factor), so it covers 1,248 W with room to spare.
4. **Energy at the load:** 1,248 W × 1 h = 1,248 Wh.
5. **Conversion losses:** assume, for illustration only, a 90% conversion efficiency from battery to output. 1,248 ÷ 0.9 ≈ 1,387 Wh. Use the figure for your actual model.
6. **End of life:** battery capacity falls with age, so add an ageing factor; 1.25 is a common choice. 1,387 × 1.25 ≈ 1,734 Wh.
7. **Battery capacity:** the CPSS3-2K uses a 72 V DC battery. 1,734 Wh ÷ 72 V ≈ 24 Ah. Choose the next standard battery size, and correct for room temperature and discharge rate with the battery data.

If the same building needed 3 hours, steps 4 to 7 would triple: about 72 Ah. That is why the duration is the first figure to confirm. For more on runtime maths, see our guide on [UPS backup time](https://www.aecups.com/en/blog/ups-backup-time/). Treat this as a first estimate; the final battery choice should also confirm that the charger can recharge it within the required time.

For a VRLA battery, the [battery runtime calculator](https://www.aecups.com/en/tools/battery-runtime/) reads the block's discharge table for your load and room, new and at the end of its life.

## AEC CPSS ranges to EN 50171

AEC's EMEA catalogue has two central power supply ranges, both designed to meet the requirements of EN 50171, with a structure compliant with CEI EN 62040, the UPS standard series.

**AEC CPSS ranges at a glance (from the AEC series data)**

| Feature | CPSS 1–10 | CPSS 10–200 |
| --- | --- | --- |
| Format | Tower, fully digital, high-frequency conversion | Static CPSS with 3-level inverter |
| Models | 1, 2, 3, 6 and 10 kVA | 10, 20, 30, 40, 60, 80, 100, 120, 160 and 200 kVA |
| Output power | 800 W to 8,000 W (output power factor 0.8) | 8 kW to 160 kW (output power factor 0.8) |
| Output voltage | 208 / 220 / 230 / 240 V, set from the display | L-N 220 / 230 / 240 V; L-L 380 / 400 / 415 V |
| Overload | Constant up to 120% | Constant up to 120% |
| Battery life (expected) | 10–12 years | 10–12 years |
| Recharge time | Under 12 hours | Under 12 hours |
| Monitoring | LCD with status and alarms; RS232, EPO and USB as standard; SNMP and RS485 + dry-contact card optional | Fully configurable from the on-site display; waveform capture (black box); self-cleaning function |

The [CPSS 1–10 kVA](https://www.aecups.com/en/products/cpss-1-10/) suits smaller buildings or a single fire compartment, where the emergency lighting load is a few kilowatts. Its LCD shows input and output values, load level, battery charge and temperature, with alarms for low battery, abnormal input, overload and faults.

The [CPSS 10–200 kVA](https://www.aecups.com/en/products/cpss-10-200/) covers larger sites. It comes on two platforms: 10–40 kVA, with 3:3, 3:1 or 1:1 phase configurations, and 60–200 kVA, a three-phase 3-4 wire + PE unit with external batteries as standard.

## How to choose a CPSS: checklist

- **Duration:** confirm the autonomy required by the fire safety design and national rules.
- **Loads:** list every luminaire and safety device with its power, and check for inrush current.
- **Phases:** decide whether the safety circuits are single-phase or three-phase.
- **Margin:** leave room for circuits added later.
- **Battery:** size it at end of life, at the real room temperature, and check the recharge time with the battery actually fitted.
- **Room:** a protected room with space, ventilation and temperature control for the battery.
- **Wiring:** fire-resistant safety circuits, routed and separated as the installation rules require.
- **Monitoring:** local display and alarms, and remote signalling to the building management or fire panel if needed.
- **Documentation:** the declaration to EN 50171, the test plan and the logbook.

## Common mistakes

- **Using a standard UPS for safety lighting.** Where EN 50171 applies, the supply must be a CPSS that meets it.
- **Sizing the battery when new.** A battery that just meets the duration on day one will fall short in a few years.
- **Confusing kVA and W.** A 2 kVA CPSS with a 0.8 power factor delivers 1,600 W, not 2,000 W.
- **Ignoring the room temperature.** Heat shortens battery life a lot, so a warm room eats into the design margin.
- **Forgetting the wiring.** A healthy CPSS is useless if the circuits to the luminaires fail early in a fire.
- **Skipping the tests.** Without regular discharge tests, a weak battery stays hidden until the real emergency.

## Installation, testing and maintenance

Like any battery system, a CPSS needs regular maintenance. Short functional tests at regular intervals, and a full-duration test at least once a year, are typical; the schedule comes from national rules and the emergency lighting standards. Record every test in the logbook.

Keep the battery room clean, ventilated and at a stable temperature. Check alarms and remote signals, and replace batteries before their capacity drops below what the duration requires. Our guide on [battery maintenance](https://www.aecups.com/en/blog/ups-battery-maintenance/) covers the routine checks, which apply to CPSS batteries too.

If the building also has a standby generator, plan for the CPSS to cover the safety loads on its own for the required duration, unless national rules state otherwise. See [UPS and generator](https://www.aecups.com/en/blog/ups-and-generator/) for how battery systems and generators work together. For help defining the requirements of a safety supply project, [contact AEC's technical team](https://www.aecups.com/en/contacts/#form).

Questions

## Questions people ask

#### What does CPSS stand for?

CPSS stands for central power supply system. It supplies safety equipment such as emergency lighting and smoke extraction from a central battery when the normal supply fails.

#### What is EN 50171?

EN 50171 is the European standard for central power supply systems for safety equipment. It applies to systems permanently connected to low-voltage AC supplies that use batteries as the alternative source. It covers topics such as autonomy, battery, recharge, monitoring, enclosure and tests.

#### How long must emergency lighting run on a CPSS?

Usually 1 or 3 hours: the duration is set by national rules and the fire safety design of the building, not by the CPSS itself. The battery must deliver that duration at the end of its life.

#### How do I size a CPSS?

Add up the power of all safety loads, add a margin for future circuits and pick a CPSS whose output in watts covers the total. Then size the battery for the required duration, including conversion losses and an ageing factor for end of life.

#### Which AEC products comply with EN 50171?

AEC offers the tower CPSS 1–10 kVA and the CPSS 10–200 kVA, both designed to meet the requirements of EN 50171, with a structure compliant with CEI EN 62040. Both hold a constant 120% overload and recharge the battery in under 12 hours.

Products

## Products in this guide

[All products](https://www.aecups.com/en/products/)

### CPSS 1–10

VRLA

1–10 kVA

Central power supply system to EN 50171, tower, 1–10 kVA

Details

### CPSS 10–200

VRLA

10–200 kVA

Central power supply system to EN 50171, 10–200 kVA

Details

Blog

## Keep reading

[All articles](https://www.aecups.com/en/blog/)

[**UPS vs CPSS: which one does a building need?** A UPS keeps equipment running; a CPSS keeps safety systems such as emergency lighting on. How they differ and when a building needs both.](https://www.aecups.com/en/blog/ups-vs-cpss/) [**How to choose a UPS: type, runtime, phases and service** How to choose a UPS once its size is known: online or line-interactive, runtime and shutdown, single- or three-phase, rack or tower, and service.](https://www.aecups.com/en/blog/how-to-choose-a-ups/) [**UPS installation clearances: what to check on site** Clearances, operating gangways, door widths, floor load, cable entry and airflow for every AEC EMEA UPS and battery cabinet, before the delivery.](https://www.aecups.com/en/blog/ups-installation-clearances/)

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need: we answer with the model and the batteries that fit.

[Contact us](https://www.aecups.com/en/contacts/#form) [+39 02 9415 8991](tel:+390294158991)