# Modular UPS: how to grow power module by module

A modular UPS is a cabinet that holds several identical power modules, each a complete online double-conversion UPS, which share the load between them. You start with the modules today's load needs, add more as the load grows, and fit one extra module for N+1 redundancy.

Reviewed by **[Bruno Grosso](https://www.aecups.com/en/about/#bruno-grosso)** and **[Eng. CP Cheng](https://www.aecups.com/en/about/#cp-cheng)**, with an associate project engineer, AEC Engineering

Faulty modules are swapped with the load running, so a modular UPS system suits data centres, server rooms and other sites that grow and cannot stop.

**In brief**

- Power grows **in steps**: 30, 50 or 100 kVA per module on the AEC IST6 ranges, from 30 kVA to 1.2 MW per cabinet.
- One module more than the load needs gives **N+1 redundancy** without a second complete UPS.
- **Hot-swappable** modules are replaced with the load running, which shortens repair time.
- A conventional UPS can be the simpler choice for a **stable load** that will not grow.

## What is a modular UPS?

A traditional, or monolithic, UPS is one unit with a fixed rating. A modular UPS splits the power electronics into several power modules that slide into one cabinet. Each module contains its own rectifier, inverter and battery converter, so each one is a complete online double-conversion UPS.

The modules work in parallel and share the load equally under digital control. On the IST6 30–120 kVA, for example, there is no master and no slave module: any power module can be added or removed while the others carry on. A separate bypass module carries the static bypass for the whole cabinet, and a manual maintenance bypass switch keeps the load supplied during service.

In larger data centres a modular UPS is almost always a three-phase machine: 400 V in, 400 V out, with each module feeding all three phases. Our guide to the [three-phase UPS](https://www.aecups.com/en/blog/three-phase-ups/) explains the supply side.

## Modular UPS vs conventional UPS

Both types protect the load in the same way. The difference is in how they grow, how they handle a fault and how they are serviced.

**Modular and conventional online UPS compared**

| Aspect | Modular UPS | Conventional UPS |
| --- | --- | --- |
| Growth | Add modules in the same cabinet, up to its rating | Add a second unit in parallel, or replace the UPS |
| N+1 redundancy | One extra module in the same cabinet | One extra complete UPS |
| Fault on the power electronics | The faulty module isolates itself; the others carry the load | The load moves to bypass, or to the other unit if there is one |
| Repair | Swap a module with the load running | Usually repaired on site, often on maintenance bypass |
| Light load | Spare modules can sleep, so the others work nearer their best efficiency | The whole unit runs at low load |
| Best fit | Growing or critical loads, from tens of kW to MW | Stable loads, smaller sites, simpler installations |

## The benefits of a modular UPS system

### Pay as you grow

You buy the power you need today and add modules later in the same cabinet, with no new floor space. This avoids running a large UPS at a low load for years, which wastes energy.

### Redundancy in one cabinet

With one module more than the load needs (N+1), the system keeps supplying the load if a module fails. The IST6 ranges also allow N+X at two levels: spare modules inside each cabinet, and spare cabinets or UPS in a parallel system. Our guide to [UPS redundancy, N+1 and 2N](https://www.aecups.com/en/blog/ups-redundancy-n-plus-1/) covers the options in depth, including when 2N is worth it.

### Service without shutdown

Hot-swappable modules are removed and inserted with the load running. On the IST6, a faulty power module is isolated automatically and the others carry the load, with reduced redundancy until it is replaced. The repair time shrinks to the time it takes to swap a module. On the 200–500 and 400–1200 kVA cabinets, the five cards of the system control box are hot-swappable too.

### Efficiency at real loads

Data centre loads are often well below the UPS rating. Redundancy sleep, set from the screen, rests spare modules at light load, so the working modules run closer to their best efficiency. An alarm warns if the load rises above the safety level set for sleep.

## How to size a modular UPS

Sizing a modular UPS means choosing two things: the number of modules for the load (N), and the cabinet that leaves room to grow. Work from the measured load in kW. As a rule of thumb, keep each configuration at roughly 80% or less of its N capacity. With a unity output power factor, as on the IST6 modules, kVA equals kW; our [kVA vs kW guide](https://www.aecups.com/en/blog/kva-vs-kw/) explains the conversion otherwise.

### Worked example: a 30 kVA modular UPS that grows

A server room draws 40 kW today. The owner expects 70 kW within four years and wants N+1 throughout. The [IST6 30–120 kVA](https://www.aecups.com/en/products/ist6-120/) uses 30 kVA / 30 kW modules.

1. Today, N: 40 kW ÷ 30 kW = 1.33, so **2 modules** (60 kW). Load on N: 40 ÷ 60 = 67%.
2. Today, N+1: 2 + 1 = **3 modules**, 90 kVA installed.
3. Year four, N: 70 kW ÷ 30 kW = 2.33, so **3 modules** (90 kW). Load on N: 70 ÷ 90 = 78%.
4. Year four, N+1: 3 + 1 = **4 modules**, 120 kVA installed.
5. Cabinet check: the IST6-120 takes four power modules plus a fifth in the redundancy slot, so there is still room for N+1 at the full 120 kVA.

The site grows from 90 to 120 kVA installed by adding one 2U module, with no new cabinet and no shutdown. Modules and further cabinets are added and configured by AEC service.

### Larger example: 600 kW with 100 kVA modules

For a 600 kW data hall on the [IST6 400–1200 kVA](https://www.aecups.com/en/products/ist6-400-1200/), N is 6 × 100 kVA modules and N+1 is 7. An 800 kVA cabinet holds 8 modules, so one slot stays free for growth, and the single-column cabinet is 801 mm wide.

## The AEC IST6 modular ranges

AEC's modular UPS family, IST6, covers three cabinet sizes. All are online double conversion with hot-swappable power modules and two system control cards (main and secondary) that back each other up.

**IST6 modular UPS ranges (figures from the AEC range pages)**

| Range | Power module | Cabinet | Key figures |
| --- | --- | --- | --- |
| [IST6 30–120 kVA](https://www.aecups.com/en/products/ist6-120/) | 30 kVA, 2U | 30 to 120 kVA in 30 kVA steps | Fifth slot for N+1; 97% in double conversion, up to 99% in ECO mode |
| [IST6 200–500 kVA](https://www.aecups.com/en/products/ist6-200-500/) | 50 kVA, 3U | 200, 300, 400 and 500 kVA (4 to 10 modules) | Up to 98.1% efficiency, THDi ≤ 1.5%, up to 8 UPS in parallel |
| [IST6 400–1200 kVA](https://www.aecups.com/en/products/ist6-400-1200/) | 100 kVA, 3U | 400 kVA to 1.2 MW (4 to 12 modules) | Up to 98.1% with PLUS modules, 99.2% in ECO; 1.2 MW in 1.2 m² |

On the IST6 30–120 kVA, the cabinet holds four power modules plus a redundancy slot, a centralised bypass module and a 7-inch colour touch screen. Beyond 120 kVA, several cabinets work in parallel with the parallel kit and can share a common battery.

The IST6 200–500 kVA reaches an input THDi of 1.5% or less at full load, which eases the load on upstream transformers and generators. Up to eight UPS run in parallel, including dual-bus layouts.

The IST6 400–1200 kVA puts 100 kW in each 3U module, for 1.2 MW in 1.2 m² of floor and up to 9.6 MW with eight UPS in parallel. It runs without derating up to 40 °C and offers an energy storage mode for peak cutting and valley filling.

## Batteries for modular systems

A modular UPS pairs well with a modular battery. The [L6 lithium system](https://www.aecups.com/en/products/l6-lithium/) uses hot-swappable lithium iron phosphate (LFP) modules in cabinets that grow from one module to fifteen cabinets in parallel, for AEC UPS from 6 to 1200 kVA. Old and new modules work together, so battery capacity can grow in stages like the UPS.

For lead-acid, AEC supplies [battery cabinets](https://www.aecups.com/en/products/battery-cabinets/) with [OZ Power](https://www.aecups.com/en/products/oz-power-vrla/) AGM batteries. The battery string is set on site. On the IST6 30–120 kVA it takes ±14 to ±23 blocks of 12 V, and charging current reaches up to 10 A per power module. On the IST6 200–500 kVA a string takes 30 to 50 blocks of 12 V, with up to 30 A of charging current per module. Lithium batteries connect through the optional BMS expansion card.

The [VRLA vs lithium guide](https://www.aecups.com/en/blog/ups-batteries-vrla-vs-lithium/) compares the two technologies, and the [backup time calculator](https://www.aecups.com/en/tools/backup-time/) gives a first estimate of the battery you need.

## Is a modular UPS right for your site?

A modular UPS makes most sense when:

- the load will grow, but you do not know exactly when or by how much;
- you need N+1 redundancy without the space of two full UPS;
- downtime for repairs is not acceptable;
- the site is a data centre, a server room, a telecoms node or a critical public building.

For a stable load of 10 to 200 kVA, a conventional online UPS such as the [IST7 10–40 kVA](https://www.aecups.com/en/products/ist7-10-40/) or the [IST7 60–200 kVA](https://www.aecups.com/en/products/ist7-60-200/) can be the simpler choice. Several units can still run in parallel for redundancy. Our [data centre UPS guide](https://www.aecups.com/en/blog/ups-for-data-centres/) sets the modular UPS in the context of the whole power chain.

### Checklist before you order

- Measured load in kW today, and the expected load in three to five years.
- Module size that matches your growth steps: 30, 50 or 100 kVA.
- Cabinet with enough free slots for growth and N+1.
- Redundancy level, and whether you also need cabinets in parallel.
- Battery type, backup time and battery room temperature.
- Monitoring: Modbus, RS232 and RS485 are standard on the IST6; SNMP is an option.

## Common mistakes with modular UPS

- **Filling the cabinet on day one.** Buying every module at the start throws away the main advantage of modularity.
- **Choosing a cabinet with no room left.** If the planned load plus N+1 already fills the cabinet, growth will need a second one.
- **Forgetting the battery.** Adding modules raises the power, but backup time falls unless the battery grows too.
- **Ignoring the single points.** Modules are redundant, but the input cabling, battery and distribution still need a plan.

Send us the load and your growth plan and we will propose a configuration. Start with the [UPS finder](https://www.aecups.com/en/tools/ups-finder/) or [contact AEC](https://www.aecups.com/en/contacts/#form).

Questions

## Questions people ask

#### What is a modular UPS?

A modular UPS is a cabinet holding several identical power modules, each a complete online double-conversion UPS. The modules share the load, and you add modules as the load grows. One extra module gives N+1 redundancy in the same cabinet.

#### Can I add modules without switching off the load?

Yes, on the IST6: power modules are hot-swappable, inserted and removed with the load running. Modules and further cabinets are added and configured by AEC service.

#### What is a 30 kVA modular UPS?

It usually means a modular system built from 30 kVA power modules. The AEC IST6 30–120 kVA starts with one 30 kVA / 30 kW module and grows to 120 kVA in the same cabinet, with a fifth slot for a redundant module.

#### Is a modular UPS less efficient at low load?

Not necessarily. Functions such as redundancy sleep rest spare modules at light load, so the working modules run closer to their best efficiency. Always compare efficiency at your real load.

#### When is a conventional UPS a better choice than a modular one?

When the load is stable and will not grow, a conventional online UPS is often simpler. For loads from 10 to 200 kVA, ranges such as the IST7 can still run several units in parallel for redundancy.

Products

## Products in this guide

[All products](https://www.aecups.com/en/products/)

### IST6-120

VRLA

30–120 kVA

Modular online UPS, double conversion, 30–120 kVA

Details

### IST6 200–500

VRLA

200–500 kVA

Modular online UPS, double conversion, 200–500 kVA

Details

### IST6 400–1200

VRLA

400–1200 kVA

Modular online UPS, double conversion, 400–1200 kVA

Details

Blog

## Keep reading

[All articles](https://www.aecups.com/en/blog/)

[**UPS redundancy: N+1 or 2N, and how much a site needs** UPS redundancy explained: what N, N+1, N+X and 2N mean, parallel vs modular UPS, a worked 90 kW example, a comparison table and a checklist.](https://www.aecups.com/en/blog/ups-redundancy-n-plus-1/) [**Single- or three-phase UPS: which does your site need?** Single-phase or three-phase UPS? Where the line falls in kVA and amps, what the supply and the loads decide, a 12 kW worked example and a checklist.](https://www.aecups.com/en/blog/single-vs-three-phase-ups/) [**How to choose a UPS: type, runtime, phases and service** How to choose a UPS once its size is known: online or line-interactive, runtime and shutdown, single- or three-phase, rack or tower, and service.](https://www.aecups.com/en/blog/how-to-choose-a-ups/)

## Talk to an AEC engineer