Example designs

# UPS example designs: office, hospital, data centre.

A small and a medium office, a hospital and a 2N data centre: each with the UPS room to scale and the single-line diagram, at 230 or 400 V, with the AEC equipment at the EMEA 2026 catalogue's size.

Small office Medium office Hospital Data centre

Illustrations, not customer installations, and not for construction: AEC equipment is drawn from the EMEA 2026 catalogue's sizes and weights, everything else is by others and drawn for scale only. Ratings are nominal; the project's designer designs every job, and our engineers size the AEC part of it.

Example design 1 of 4

## Small office, 230 V

A 200 m² office: the network rack on a 3 kVA IST3-J (2U), the reception desk on a 1 kVA IST3 tower.

Drag to pan · scroll or pinch to zoom · tap equipment

Equipment

Tap a piece of equipment on the plan or the single-line diagram: it lights on both sheets.

**Supply**: 230 V single-phase

**UPS-1**: IST3-J 3 kVA, 2U, in the network rack

**UPS-2**: IST3 1 kVA tower at the reception

**Floor**: 18 × 11 m

AEC equipment in the design

- [AEC IST3-J 3 kVA](https://www.aecups.com/en/products/ist3-j/ist3j-3k/) 3 kVA
- [AEC IST3-1](https://www.aecups.com/en/products/ist3/ist3-1k/) 1 kVA

**CAD files and bill of materials**

DWG, SVG and the bill of materials with ordering codes: an AEC engineer sends them with the project.

Backup time

### How long it holds: small office

The design's set-up in bold (IST3J-3-6X9), the same UPS's other batteries behind it: move the load, type it in kW or slide along the chart. AEC's minutes, new batteries.

50 %

IST3-J 3 kVA, 6 × 12 V 9 Ah, internal IST3-J 3 kVA, 12 × 12 V 9 Ah, BBJ IST3-J 3 kVA, 18 × 12 V 9 Ah, 2 × BBJ IST3-J 3 kVA, 24 × 12 V 9 Ah, 3 × BBJ IST3-J 3 kVA, 30 × 12 V 9 Ah, 4 × BBJ2

At 50 % of the rating

IST3-J 3 kVA

[**This design 6 × 12 V 9 Ah, internal **8 min**](https://www.aecups.com/en/products/ist3-j/ist3j-3k/) [**12 × 12 V 9 Ah, BBJ **24 min**](https://www.aecups.com/en/products/ist3-j/ist3j-3k/) [**18 × 12 V 9 Ah, 2 × BBJ **41 min**](https://www.aecups.com/en/products/ist3-j/ist3j-3k/) [**24 × 12 V 9 Ah, 3 × BBJ **56 min**](https://www.aecups.com/en/products/ist3-j/ist3j-3k/) [**30 × 12 V 9 Ah, 4 × BBJ2 **78 min**](https://www.aecups.com/en/products/ist3-j/ist3j-3k/)

#### Table: every set-up at 30, 50, 70 and 100 % load

| Set-up | 30% load | 50% load | 70% load | 100% load |
| --- | --- | --- | --- | --- |
| [IST3-J 3 kVA, 6 × 12 V 9 Ah, internal](https://www.aecups.com/en/products/ist3-j/ist3j-3k/) IST3J-3-6X9 | 18 min\* | 8 min | 4 min | 2 min |
| [IST3-J 3 kVA, 12 × 12 V 9 Ah, BBJ](https://www.aecups.com/en/products/ist3-j/ist3j-3k/) IST3J-3-12X9 | 47 min\* | 24 min | 14 min | 8 min |
| [IST3-J 3 kVA, 18 × 12 V 9 Ah, 2 × BBJ](https://www.aecups.com/en/products/ist3-j/ist3j-3k/) IST3J-3-18X9 | 78 min\* | 41 min | 26 min | 15 min |
| [IST3-J 3 kVA, 24 × 12 V 9 Ah, 3 × BBJ](https://www.aecups.com/en/products/ist3-j/ist3j-3k/) IST3J-3-24X9 | 113 min\* | 56 min | 38 min | 24 min |
| [IST3-J 3 kVA, 30 × 12 V 9 Ah, 4 × BBJ2](https://www.aecups.com/en/products/ist3-j/ist3j-3k/) IST3J-3-30X9 | 155 min\* | 78 min | 50 min | 30 min |

\* calculated with AEC's method (1.70 V/cell, 96 %), scaled to AEC's published 50 % figure; the rest published by AEC (EMEA portal).

Example design 2 of 4

## Medium office, 400 V

An office over several floors: an IST7-40 S with its internal batteries in the electrical room, a UPS board for the server room and the critical desks.

Drag to pan · scroll or pinch to zoom · tap equipment

Equipment

Tap a piece of equipment on the plan or the single-line diagram: it lights on both sheets.

**Supply**: 400 V three-phase, 3-ph + N

**UPS-1**: IST7-40 S, 40 kVA, internal batteries

**Room**: 5 × 4 m

AEC equipment in the design

- [AEC IST7-40](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) 40 kVA

**CAD files and bill of materials**

DWG, SVG and the bill of materials with ordering codes: an AEC engineer sends them with the project.

Backup time

### How long it holds: medium office

The design's set-up in bold (IST7-40-80X9), the same UPS's other batteries behind it: move the load, type it in kW or slide along the chart. AEC's minutes, new batteries.

50 %

IST7-40, 80 × 12 V 9 Ah, internal IST7-40, 72 × 12 V 9 Ah, internal IST7-40, 36 × 12 V 24 Ah, BB5 IST7-40, 38 × 12 V 24 Ah, BB5 IST7-40, 40 × 12 V 24 Ah, BB5 IST7-40, 30 × 12 V 40 Ah, BB5 IST7-40, 32 × 12 V 40 Ah, BB5 IST7-40, 144 × 12 V 9 Ah, BB4

At 50 % of the rating

IST7-40

[**This design 80 × 12 V 9 Ah, internal **8 min**](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) [**72 × 12 V 9 Ah, internal **6 min**](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) [**36 × 12 V 24 Ah, BB5 **10 min**](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) [**38 × 12 V 24 Ah, BB5 **11 min**](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) [**40 × 12 V 24 Ah, BB5 **12 min**](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) [**30 × 12 V 40 Ah, BB5 **16 min**](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) [**32 × 12 V 40 Ah, BB5 **18 min**](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) [**144 × 12 V 9 Ah, BB4 **21 min**](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/)

#### Table: every set-up at 30, 50, 70 and 100 % load

| Set-up | 30% load | 50% load | 70% load | 100% load |
| --- | --- | --- | --- | --- |
| [IST7-40, 80 × 12 V 9 Ah, internal](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) IST7-40-80X9 | 18 min\* | 8 min | 4 min | 2 min |
| [IST7-40, 72 × 12 V 9 Ah, internal](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) IST7-40-72X9 | 15 min\* | 6 min | 3 min | 2 min |
| [IST7-40, 36 × 12 V 24 Ah, BB5](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) IST7-40-36X24 | 22 min\* | 10 min | 5 min | 3 min |
| [IST7-40, 38 × 12 V 24 Ah, BB5](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) IST7-40-38X24 | 24 min\* | 11 min | 5 min | 3 min |
| [IST7-40, 40 × 12 V 24 Ah, BB5](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) IST7-40-40X24 | 25 min\* | 12 min | 5 min | 3 min |
| [IST7-40, 30 × 12 V 40 Ah, BB5](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) IST7-40-30X40 | 34 min\* | 16 min | 9 min | 4 min |
| [IST7-40, 32 × 12 V 40 Ah, BB5](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) IST7-40-32X40 | 39 min\* | 18 min | 10 min | 5 min |
| [IST7-40, 144 × 12 V 9 Ah, BB4](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/) IST7-40-144X9 | 41 min\* | 21 min | 12 min | 6 min |

\* calculated with AEC's method (1.70 V/cell, 96 %), scaled to AEC's published 50 % figure; the rest published by AEC (EMEA portal).

Example design 3 of 4

## Hospital critical loads, 400 V

The UPS board of a surgical block: an IST6-120 with four 30 kVA modules, 90 kVA N+1, one BB7 battery cabinet with 40 × 100 Ah blocks, after the mains / generator changeover.

Drag to pan · scroll or pinch to zoom · tap equipment

Equipment

Tap a piece of equipment on the plan or the single-line diagram: it lights on both sheets.

**Supply**: 400 V from the MV/LV transformer and the generator

**UPS-1**: IST6-120, 4 × 30 kVA, 90 kVA N+1

**Batteries**: BB7, 40 × 12 V 100 Ah VRLA

**Room**: 8 × 5.5 m

AEC equipment in the design

- [AEC IST6-120, 4 × 30 kVA](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) 120 kVA
- [AEC BB7](https://www.aecups.com/en/products/battery-cabinets/bb7/) 60 · 80 · 100 Ah

**CAD files and bill of materials**

DWG, SVG and the bill of materials with ordering codes: an AEC engineer sends them with the project.

Backup time

### How long it holds: hospital

The design's set-up in bold (IST6-120-40X100), the same UPS's other batteries behind it: move the load, type it in kW or slide along the chart. AEC's minutes, new batteries.

75 %

IST6-120, 4 × 30 kVA, 40 × 12 V 100 Ah, BB7 IST6-120, 4 × 30 kVA, 36 × 12 V 80 Ah, BB7 IST6-120, 4 × 30 kVA, 30 × 12 V 100 Ah, BB7 IST6-120, 4 × 30 kVA, 40 × 12 V 80 Ah, BB7 IST6-120, 4 × 30 kVA, 34 × 12 V 100 Ah, BB7 IST6-120, 4 × 30 kVA, 36 × 12 V 100 Ah, BB7 IST6-120, 4 × 30 kVA, 60 × 12 V 80 Ah, BB8 IST6-120, 4 × 30 kVA, 64 × 12 V 80 Ah, BB8

At 50 % of the rating

IST6-120, 4 × 30 kVA

[**This design 40 × 12 V 100 Ah, BB7 **20 min**](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) [**36 × 12 V 80 Ah, BB7 **10 min**](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) [**30 × 12 V 100 Ah, BB7 **11 min**](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) [**40 × 12 V 80 Ah, BB7 **12 min**](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) [**34 × 12 V 100 Ah, BB7 **14 min**](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) [**36 × 12 V 100 Ah, BB7 **16 min**](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) [**60 × 12 V 80 Ah, BB8 **25 min**](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) [**64 × 12 V 80 Ah, BB8 **27 min**](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/)

#### Table: every set-up at 30, 50, 70 and 100 % load

| Set-up | 30% load | 50% load | 70% load | 100% load |
| --- | --- | --- | --- | --- |
| [IST6-120, 4 × 30 kVA, 40 × 12 V 100 Ah, BB7](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) IST6-120-40X100 | 42 min\* | 20 min | 10 min | 7 min |
| [IST6-120, 4 × 30 kVA, 36 × 12 V 80 Ah, BB7](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) IST6-120-36X80 | 25 min\* | 10 min | 7 min | 4 min |
| [IST6-120, 4 × 30 kVA, 30 × 12 V 100 Ah, BB7](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) IST6-120-30X100 | 27 min\* | 11 min | 7 min | 4 min |
| [IST6-120, 4 × 30 kVA, 40 × 12 V 80 Ah, BB7](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) IST6-120-40X80 | 28 min\* | 12 min | 8 min | 4 min |
| [IST6-120, 4 × 30 kVA, 34 × 12 V 100 Ah, BB7](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) IST6-120-34X100 | 31 min\* | 14 min | 8 min | 5 min |
| [IST6-120, 4 × 30 kVA, 36 × 12 V 100 Ah, BB7](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) IST6-120-36X100 | 35 min\* | 16 min | 9 min | 5 min |
| [IST6-120, 4 × 30 kVA, 60 × 12 V 80 Ah, BB8](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) IST6-120-60X80 | 51 min\* | 25 min | 14 min | 8 min |
| [IST6-120, 4 × 30 kVA, 64 × 12 V 80 Ah, BB8](https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/) IST6-120-64X80 | 54 min\* | 27 min | 16 min | 9 min |

\* calculated with AEC's method (1.70 V/cell, 96 %), scaled to AEC's published 50 % figure; the rest published by AEC (EMEA portal).

Example design 4 of 4

## Data centre 2N, 400 V

Two separate UPS rooms, A and B: in each an IST6 600 kVA with six 100 kVA modules and L6 lithium cabinets, each one for the whole IT load.

Drag to pan · scroll or pinch to zoom · tap equipment

Equipment

Tap a piece of equipment on the plan or the single-line diagram: it lights on both sheets.

**Topology**: 2N, sides A and B

**UPS**: 2 × IST6-600H, 6 × 100 kVA

**Batteries**: 8 × L6-50 lithium, 4 a side

**Rooms**: 2 × 8.5 × 7.5 m

AEC equipment in the design

- [AEC IST6-600H, 6 × 100 kVA](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) 600 kVA
- [AEC L6-50](https://www.aecups.com/en/products/l6-lithium/l6-50/) 50 Ah

**CAD files and bill of materials**

DWG, SVG and the bill of materials with ordering codes: an AEC engineer sends them with the project.

Backup time

### How long it holds: data centre

The design's set-up in bold (IST6-600-L6-80X50), the same UPS's other batteries behind it: move the load, type it in kW or slide along the chart. AEC's minutes, new batteries.

50 %

IST6-600H, 6 × 100 kVA, 4 × L6, 80 × 50 Ah lithium IST6-600H, 6 × 100 kVA, 3 × L6, 60 × 50 Ah lithium IST6-600H, 6 × 100 kVA, 5 × L6, 100 × 50 Ah lithium IST6-600H, 6 × 100 kVA, 6 × L6, 120 × 50 Ah lithium IST6-600H, 6 × 100 kVA, 7 × L6, 140 × 50 Ah lithium IST6-600H, 6 × 100 kVA, 8 × L6, 160 × 50 Ah lithium IST6-600H, 6 × 100 kVA, 9 × L6, 180 × 50 Ah lithium IST6-600H, 6 × 100 kVA, 10 × L6, 200 × 50 Ah lithium

At 50 % of the rating

IST6-600H, 6 × 100 kVA

[**This design 4 × L6, 80 × 50 Ah lithium **41 min**](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) [**3 × L6, 60 × 50 Ah lithium **31 min**](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) [**5 × L6, 100 × 50 Ah lithium **52 min**](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) [**6 × L6, 120 × 50 Ah lithium **62 min**](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) [**7 × L6, 140 × 50 Ah lithium **73 min**](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) [**8 × L6, 160 × 50 Ah lithium **83 min**](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) [**9 × L6, 180 × 50 Ah lithium **93 min**](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) [**10 × L6, 200 × 50 Ah lithium **104 min**](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/)

#### Table: every set-up at 30, 50, 70 and 100 % load

| Set-up | 30% load | 50% load | 70% load | 100% load |
| --- | --- | --- | --- | --- |
| [IST6-600H, 6 × 100 kVA, 4 × L6, 80 × 50 Ah lithium](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) IST6-600-L6-80X50 | — | 41 min | 30 min | 21 min |
| [IST6-600H, 6 × 100 kVA, 3 × L6, 60 × 50 Ah lithium](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) IST6-600-L6-60X50 | — | 31 min | 22 min | 16 min |
| [IST6-600H, 6 × 100 kVA, 5 × L6, 100 × 50 Ah lithium](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) IST6-600-L6-100X50 | — | 52 min | 37 min | 26 min |
| [IST6-600H, 6 × 100 kVA, 6 × L6, 120 × 50 Ah lithium](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) IST6-600-L6-120X50 | — | 62 min | 44 min | 31 min |
| [IST6-600H, 6 × 100 kVA, 7 × L6, 140 × 50 Ah lithium](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) IST6-600-L6-140X50 | — | 73 min | 52 min | 36 min |
| [IST6-600H, 6 × 100 kVA, 8 × L6, 160 × 50 Ah lithium](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) IST6-600-L6-160X50 | — | 83 min | 59 min | 41 min |
| [IST6-600H, 6 × 100 kVA, 9 × L6, 180 × 50 Ah lithium](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) IST6-600-L6-180X50 | — | 93 min | 67 min | 47 min |
| [IST6-600H, 6 × 100 kVA, 10 × L6, 200 × 50 Ah lithium](https://www.aecups.com/en/products/ist6-400-1200/ist6-600k-6x100/) IST6-600-L6-200X50 | — | 104 min | 74 min | 52 min |

How to read them

## The sheets, like a design set.

Each application has the two sheets an electrical design starts from.

**E-101 · Plan** The UPS room to scale with dimensions in millimetres, doors and the 700 mm operating gangway of [HD 60364-7-729](https://webstore.iec.ch/en/publication/1907) in front of the equipment; AEC equipment hatched in red at its catalogue footprint, the front marked heavy.

**E-601 · Single-line diagram** From the supply and the generator to the load: transformers, breakers, changeover switches, busbars, and the UPS with its rectifier, inverter, battery and static bypass, inside the red dashed line.

**Schedule and notes** The equipment schedule with model, rating, size and weight; keynotes on the plan, notes on the single-line diagram; the title block with sheet number and revision.

**Your project** Send us the plan and the single-line diagram: our engineers return the AEC equipment, its batteries and its footprint for your drawings.

Questions

## What people ask

#### Can these drawings be used for a project?

No: they are examples, not real sites and not for construction. AEC equipment is drawn at the EMEA 2026 catalogue's sizes and weights; everything else is by others, drawn to scale. The project's designer designs; AEC's engineers size the AEC part.

#### Can I have the CAD files?

Yes, with your project: send us the plan and the single-line diagram, and an AEC engineer returns the AEC equipment, its batteries and its footprint in DWG.

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need: we answer with the model and the batteries that fit.

[Contact us](https://www.aecups.com/en/contacts/#form) [+39 02 9415 8991](tel:+390294158991)

More about AEC: [About AEC](https://www.aecups.com/en/about/) [Company](https://www.aecups.com/en/company/) [Why AEC](https://www.aecups.com/en/why-aec/) [Warranty](https://www.aecups.com/en/warranty/) [UPS in 3D](https://www.aecups.com/en/3d/) [Applications](https://www.aecups.com/en/applications/) [Middle East data centres](https://www.aecups.com/en/applications/middle-east-data-centres/) [AEC EMEA](https://www.aecups.com/en/aec-emea/) [AEC in brief](https://www.aecups.com/en/aec-in-brief/)