---
title: "Central power supply system (CPSS), EN 50171 | AEC"
url: https://www.aecups.com/en/products/cpss-en-50171/
description: "AEC CPSS3 (1–10 kVA) and CPSS7 (10–200 kVA) central power supplies designed to EN 50171: operating modes, autonomy, recharge."
language: en
---

[EN 50171](https://mycatalogo.ceinorme.it/cei/item/0000018393?sso=y) · 1 to 200 kVA

# Central power supply system (CPSS) to EN 50171, 1–200 kVA

A central power supply system (CPSS) feeds a building's emergency lighting and other safety services from one battery when the mains fails. AEC offers two ranges designed to meet EN 50171: the single-phase CPSS3 from 1 to 10 kVA and the three-phase CPSS7 from 10 to 200 kVA, online double conversion, with a 120% constant overload and recharge in under 12 hours.

The models [Contact us](https://www.aecups.com/en/contacts/#form)

**0 ms** transfer: mode without interruption (the standard allows up to 0.5 s in changeover mode)

**120%** constant inverter overload for the whole rated operating time (EN 50171, 6.6.3)

**80% in 12 h** minimum recharge the standard asks (6.3.3); AEC: under 12 h from low battery

**1 h · 3 h** typical operating times: at least 1 h for escape routes (EN 1838), 3 h where the building stays occupied

EN 50171

## Without interruption or with changeover, maintained and non-maintained

EN 50171 (clause 4.1) defines two operating modes. In the **changeover mode** the loads move to the battery when the mains fails, with a response time of no more than 0.5 s. In the **mode without interruption** the supply is permanent and there is no response time.

AEC's CPSS are online double-conversion systems and work in the mode without interruption: the safety loads are always on the inverter and, when the mains fails, the battery takes over in 0 ms. That is why ECO mode stays off.

Emergency lighting has **maintained** luminaires, lit with the mains present too (maintained loads), and **non-maintained** ones, lit only when the mains fails. An online CPSS feeds both from the same output; the designer gives the split between them, which the battery sizing needs.

Models

## The CPSS3 and CPSS7 models

Data from Appendix A of AEC's CPSS user manuals; power in kW at power factor 0.8.

**AEC CPSS3 and CPSS7: rating, frame, size, weight and charge current**

| Model | kVA | kW | Frame | W × D × H (mm) | Weight (kg) | Max. charge current |
| --- | --- | --- | --- | --- | --- | --- |
| [CPSS3-1K](https://www.aecups.com/en/products/cpss-1-10/) | 1 | 0.8 | tower, IST3 1 kVA frame | 145 × 357 × 226 | 4.5 | 1–4 A |
| [CPSS3-2K](https://www.aecups.com/en/products/cpss-1-10/) | 2 | 1.6 | tower, IST3 2–3 kVA frame | 190 × 397 × 330 | 8.5 | 1–4 A |
| [CPSS3-3K](https://www.aecups.com/en/products/cpss-1-10/) | 3 | 2.4 | tower, IST3 2–3 kVA frame | 190 × 397 × 330 | 9.2 | 1–4 A |
| [CPSS3-6K](https://www.aecups.com/en/products/cpss-1-10/) | 6 | 4.8 | tower, IST3 6–10 kVA long-backup frame | 190 × 429 × 337 | 10.9 | 1–8 A |
| [CPSS3-10K](https://www.aecups.com/en/products/cpss-1-10/) | 10 | 8 | tower, IST3 6–10 kVA long-backup frame | 190 × 429 × 337 | 12.5 | 1–8 A |
| [CPSS7-10](https://www.aecups.com/en/products/cpss-10-200/) | 10 | 8 | tower, IST7 10–20 kVA frame | 250 × 806 × 880 | 64 | 1–10 A |
| [CPSS7-20](https://www.aecups.com/en/products/cpss-10-200/) | 20 | 16 | tower, IST7 10–20 kVA frame | 250 × 806 × 880 | 64 | 1–10 A |
| [CPSS7-30](https://www.aecups.com/en/products/cpss-10-200/) | 30 | 24 | tower, IST7 30–40 kVA frame | 300 × 842 × 1250 | 102.5 | 1–20 A |
| [CPSS7-40](https://www.aecups.com/en/products/cpss-10-200/) | 40 | 32 | tower, IST7 30–40 kVA frame | 300 × 842 × 1250 | 102.5 | 1–20 A |
| [CPSS7-60](https://www.aecups.com/en/products/cpss-10-200/) | 60 | 48 | cabinet, IST7 60–120 kVA frame | 400 × 960 × 1193 | 153 | 30 A |
| [CPSS7-80](https://www.aecups.com/en/products/cpss-10-200/) | 80 | 64 | cabinet, IST7 60–120 kVA frame | 400 × 960 × 1193 | 163 | 30 A |
| [CPSS7-100](https://www.aecups.com/en/products/cpss-10-200/) | 100 | 80 | cabinet, IST7 60–120 kVA frame | 400 × 960 × 1193 | 165 | 30 A |
| [CPSS7-120](https://www.aecups.com/en/products/cpss-10-200/) | 120 | 96 | cabinet, IST7 60–120 kVA frame | 400 × 960 × 1193 | 167 | 30 A |
| [CPSS7-160](https://www.aecups.com/en/products/cpss-10-200/) | 160 | 128 | cabinet, IST7 160–200 kVA frame | 600 × 1000 × 1600 | 294 | 60 A |
| [CPSS7-200](https://www.aecups.com/en/products/cpss-10-200/) | 200 | 160 | cabinet, IST7 160–200 kVA frame | 600 × 1000 × 1600 | 296 | 60 A |

Weights without batteries: CPSS3 as the long-backup unit (the unit with internal batteries weighs more, see the CPSS 1–10 page); CPSS7 10–40 without internal batteries. The CPSS7 weights are those of the AEC IST7 of the same rating, the same cabinet. Every figure of each range is on its own page.

### CPSS 1–10

VRLA

1–10 kVA

Central power supply system to EN 50171, tower, 1–10 kVA

Details

### CPSS 10–200

VRLA

10–200 kVA

Central power supply system to EN 50171, 10–200 kVA

Details

Battery and recharge

## 1 h or 3 h of operation, 80% recharge in 12 h

The fire-safety design of the building and the national rules set the rated operating time: EN 1838 asks at least 1 h for escape-route lighting, and 3 h is common where the building stays occupied. The battery is sized for that time at end of life, with the load profile and the split between maintained and non-maintained loads.

EN 50171 then asks for a charger that brings a discharged battery back to at least 80% of the rated operating time in 12 h (6.3.3) and an inverter that carries 120% of the load continuously for the whole operating time (6.6.3). AEC's CPSS recharge in under 12 h with the battery sized to the charger and hold 120% as a constant overload.

The [guide to EN 50171 central power supplies](https://www.aecups.com/en/blog/cpss-en-50171/) works through a sizing example; [UPS vs CPSS](https://www.aecups.com/en/blog/ups-vs-cpss/) explains when you need one or the other.

Downloads

## CPSS user manuals (EN 50171)

**CPSS7 10–40 kVA · user manual (EN 50171)** User manual · English · PDF · 91 pages · 6.8 MB

**CPSS7 60–200 kVA · user manual (EN 50171)** User manual · English · PDF · 95 pages · 6.9 MB

**CPSS3 1–10 kVA · user manual (EN 50171)** User manual · English · PDF · 41 pages · 2.7 MB

Questions

## Questions people ask

#### What is a central power supply system (CPSS)?

A central supply for safety services: from its battery it feeds emergency escape lighting and safety signs, the circuits of fire-extinguishing installations, emergency paging and smoke extraction when the normal supply fails. EN 50171 sets its requirements.

#### What is the difference between a CPSS and a UPS?

A UPS protects critical loads such as servers and processes; a CPSS is dedicated to safety services and must not carry general loads. AEC's CPSS are built on the online IST3 and IST7 platforms, with overload, recharge and indications set for EN 50171. The guide on UPS and CPSS goes into the detail.

#### How long must a CPSS run on battery?

The fire-safety design and the national rules set it, not the CPSS: EN 1838 asks at least 1 h for escape-route lighting, and 3 h is common where the building stays occupied after the mains fails. AEC sizes the battery for that time at end of life.

#### How fast does the battery recharge?

EN 50171 (6.3.3) asks a recharge to at least 80% of the rated operating time in 12 hours. AEC's CPSS recharge from low battery in under 12 hours with the battery sized to the charger: up to 4–8 A on CPSS3, 10–20 A on CPSS7 10–40 and 30–60 A on CPSS7 60–200.

#### What are maintained and non-maintained emergency lights?

Maintained luminaires are lit with the mains present as well (maintained loads); non-maintained ones light only when the mains fails. An AEC CPSS works in the mode without interruption and feeds both: the designer gives the split between maintained and non-maintained loads.

#### Are AEC CPSS certified to EN 50171?

No certificate is published on this site. AEC's CPSS are designed to meet the requirements of EN 50171, and the user manual's own chapter lists clause by clause what the standard asks, what the CPSS provides and what falls to the designer and the installer. The designer verifies the safety installation with the commissioning tests.

Guides

## Guides: Central power supply (CPSS)

[All guides](https://www.aecups.com/en/blog/)

[**CPSS to EN 50171: what it asks and how to size one** A CPSS is a central battery system that powers emergency lighting and safety loads. What EN 50171 covers, how to size a CPSS and a worked example.](https://www.aecups.com/en/blog/cpss-en-50171/) [**UPS vs CPSS: which one does a building need?** A UPS keeps equipment running; a CPSS keeps safety systems such as emergency lighting on. How they differ and when a building needs both.](https://www.aecups.com/en/blog/ups-vs-cpss/) [**UPS for hospitals and healthcare facilities** A UPS for hospitals keeps medical and IT loads running with no break until the generator starts. Medical locations, redundancy and sizing.](https://www.aecups.com/en/blog/ups-for-hospitals/)

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need: we answer with the model and the batteries that fit.

[Contact us](https://www.aecups.com/en/contacts/#form) [+39 02 9415 8991](tel:+390294158991)
