title: "Data centre UPS: N+1, 2N, IST6 up to 9.6 MW | AEC"
url: https://www.aecups.com/en/products/data-centre-ups/
description: "AEC data centre UPS by load band, from edge rooms to megawatt blocks at 400 V: IST6 cabinets, modules, N+1."
language: en
---

Data centre UPS · 400 V · N+1, 2N, multi-bus · up to 9.6 MW

# Data centre UPS: from the edge room to 9.6 MW at 400 V

A data centre UPS carries the IT load from the mains failure until the generator holds it, and keeps doing so with one of its parts out for service. AEC answers by load band: the All-in-One and IST9 for edge rooms, IST6-120 and IST7 for server rooms, IST6 with 50 and 100 kVA modules up to 1.2 MVA per cabinet and 8 UPS in parallel.

By load band N+1, 2N, multi-bus [Modular UPS](https://www.aecups.com/en/products/modular-ups/)

By load band

## Which AEC architecture fits which room

One load worked in each band with N+1 and every module at 80% or less with one module out (this example's design choice: set your own limit): the cabinet, the modules installed and each module's share in normal running.

**Which AEC architecture fits which room**

| Band | AEC ranges | Load worked | Cabinet and modules, N+1 | Footprint |
| --- | --- | --- | --- | --- |
| Edge and network rooms | The All-in-One 20 kVA with the lithium in the same 600 × 1000 mm cabinet; IST9 and IST7 from 10 to 40 kVA, 400 V three-phase. | 20 kW | [one All-in-One 20 kVA, an IST9 20 kVA inside](https://www.aecups.com/en/products/all-in-one/) | 0.6 m² |
| Server rooms and small data rooms | IST6-120, 30 kVA modules (4 + 1 redundancy slot); IST7 60–200, up to 8 units in parallel, 1.6 MW. | 90 kW | [IST6-120](https://www.aecups.com/en/products/ist6-120/): 5 × 30 kVA in 5 slots, each at 60% | 0.52 m² |
| Data halls and colocation | IST6 200–500, 50 kVA modules in cabinets of 200 to 500 kVA. | 300 kW | [IST6 200–500, 500 kVA](https://www.aecups.com/en/products/ist6-200-500/): 9 × 50 kVA in 10 slots, each at 67% | 1.04 m² |
| Megawatt blocks | IST6 400–1200, 100 kVA modules up to 1.2 MVA per cabinet; up to 8 UPS in parallel, 9.6 MW. | 3,000 kW | 4 × [IST6 400–1200, 1,000 kVA](https://www.aecups.com/en/products/ist6-400-1200/): 39 × 100 kVA in 40 slots, each at 77% | 4.8 m² |

Footprint: the UPS cabinets only.

Redundancy, counted

## One 800 kW load, three ways

The same critical load on the 100 kVA IST6 400–1200 cabinets, each scheme with every module at 80% or less of what it must carry after a failure. The IST6 data give BSC dual bus and multi-bus with 3 buses: the two architectures for 2N and for three systems sharing the load.

**One 800 kW load, three ways**

| Scheme | Cabinets | Modules in all | Each module, normal running | Cabinets: footprint, weight with modules | Survives |
| --- | --- | --- | --- | --- | --- |
| N+1 in one system | 1 × [IST6 400–1200, 1,200 kVA](https://www.aecups.com/en/products/ist6-400-1200/), 11 modules | 11 | 73% | 1.2 m², 1,256 kg | one power module out or failed |
| 2N: two systems, each for the whole load | 2 × [IST6 400–1200, 1,000 kVA](https://www.aecups.com/en/products/ist6-400-1200/), 10 modules | 20 | 40% | 2.4 m², 2,404 kg | a whole system, its bypass or its feed out (dual-corded loads) |
| Three systems on 3 buses, any two carry the load | 3 × [IST6 400–1200, 500 kVA](https://www.aecups.com/en/products/ist6-400-1200/), 5 modules | 15 | 53% | 2.4 m², 2,112 kg | a whole system out; the other two take its share (dual-corded loads or static transfer switches) |

Weights: the cabinet without modules plus the 54 kg modules, no batteries. Declared IST6 400–1200 efficiency: 97.2% with General modules, 98.1% with PLUS modules, 99.2% in ECO; the data give no part-load figures, so the table estimates none.

EMEA 2026 data

## Every IST6 cabinet, with N+1 and kW per m²

N+1 here is the cabinet with every slot filled and one module held spare. kW per m²: the N+1 power over the cabinet's own footprint; batteries and service space come on top.

**Every IST6 cabinet, with N+1 and kW per m²**

| Cabinet | Modules | N+1, cabinet full | W × D | Footprint | N+1 kW per m² | Weight with modules |
| --- | --- | --- | --- | --- | --- | --- |
| [IST6-120](https://www.aecups.com/en/products/ist6-120/) | 4 × 30 kVA + 1 redundancy slot | 120 kW | 600 × 860 mm | 0.52 m² | **233** | 315 kg |
| [IST6 200–500, 200 kVA](https://www.aecups.com/en/products/ist6-200-500/) | 4 × 50 kVA | 150 kW | 607 × 860 mm | 0.52 m² | **287** | 380 kg |
| [IST6 200–500, 300 kVA](https://www.aecups.com/en/products/ist6-200-500/) | 6 × 50 kVA | 250 kW | 607 × 860 mm | 0.52 m² | **479** | 470 kg |
| [IST6 200–500, 400 kVA](https://www.aecups.com/en/products/ist6-200-500/) | 8 × 50 kVA | 350 kW | 1203 × 864 mm | 1.04 m² | **337** | 771 kg |
| [IST6 200–500, 500 kVA](https://www.aecups.com/en/products/ist6-200-500/) | 10 × 50 kVA | 450 kW | 1203 × 864 mm | 1.04 m² | **433** | 896 kg |
| [IST6 400–1200, 400 kVA](https://www.aecups.com/en/products/ist6-400-1200/) | 4 × 100 kVA | 300 kW | 801 × 1000 mm | 0.8 m² | **375** | 561 kg |
| [IST6 400–1200, 500 kVA](https://www.aecups.com/en/products/ist6-400-1200/) | 5 × 100 kVA | 400 kW | 801 × 1000 mm | 0.8 m² | **499** | 704 kg |
| [IST6 400–1200, 600 kVA](https://www.aecups.com/en/products/ist6-400-1200/) | 6 × 100 kVA | 500 kW | 801 × 1000 mm | 0.8 m² | **624** | 758 kg |
| [IST6 400–1200, 800 kVA](https://www.aecups.com/en/products/ist6-400-1200/) | 8 × 100 kVA | 700 kW | 801 × 1000 mm | 0.8 m² | **874** | 867 kg |
| [IST6 400–1200, 1,000 kVA](https://www.aecups.com/en/products/ist6-400-1200/) | 10 × 100 kVA | 900 kW | 1201 × 1000 mm | 1.2 m² | **749** | 1,202 kg |
| [IST6 400–1200, 1,200 kVA](https://www.aecups.com/en/products/ist6-400-1200/) | 12 × 100 kVA | 1,100 kW | 1201 × 1000 mm | 1.2 m² | **916** | 1,310 kg |

IST6-120: the fifth slot is reserved for a redundant module, so its N+1 is 120 kW. Modules: 30 kVA at 24 kg, 50 kVA at 39 kg (500 × 650 × 130 mm), 100 kVA at 54 kg in 3U; all hot-swappable from the front. IST6 200–500 moves 2,420 m³/h of air (200 kVA) to 6,050 m³/h (500 kVA), front to rear.

Battery

## Minutes, weight and the room

**Lithium.** An L6-50 cabinet holds 58 kWh and gives 14 minutes at its rated 200 kW; it weighs 985 kg on 600 × 850 mm, about 1,931 kg/m² for the structural engineer. It is designed for IST7 and IST6 from 6 to 1,200 kVA, up to 15 cabinets in parallel. **Lead-acid.** IST6 400–1200 runs on a 480 V DC bus with 40 blocks of 12 V as standard (30 to 50); in the 5 MW project each UPS has four cabinets of 40 × 200 Ah.

400 V

## Current and parallel

At 400 V a 1,200 kVA cabinet at full load carries about 1,732 A per phase: size the switchboard and cables for the full cabinet from day one, so added modules need no new cables. Up to 8 UPS in parallel with current imbalance ≤ 5%; IST6-120 and IST7 in parallel with their kit and ring cables.

In service

## Data centres AEC has powered

[5 MW of IST6 modular UPS for a data centre in Italy](https://www.aecups.com/en/projects/#data-centre-italy-ist6-5mw): five UPS of 1 MW, each a 1.2 MW frame with 10 modules of 100 kW, so 2 free slots per frame, and four battery cabinets of 40 × 200 Ah. [1.2 MW of IST6 modular UPS for an Italian bank's data centre](https://www.aecups.com/en/projects/#italian-bank-ist6): four UPS of 300 kW, six 50 kW modules each. [A 1.2 MW containerised UPS with lithium batteries for a Swiss private bank](https://www.aecups.com/en/projects/#swiss-bank-containerised-ups): 12 modules of 100 kW and 60 lithium modules of 50 Ah in an IP55 container. [Data centres in the Middle East](https://www.aecups.com/en/applications/middle-east-data-centres/).

Before the order

## Check it on your own room

[Room fit](https://www.aecups.com/en/tools/room-fit/) places the cabinets and batteries on your floor plan · [the 3D viewers](https://www.aecups.com/en/3d/) open the IST6 1,200 kVA in X-ray · [UPS finder](https://www.aecups.com/en/tools/ups-finder/) · [backup time](https://www.aecups.com/en/tools/backup-time/) · [modular UPS](https://www.aecups.com/en/products/modular-ups/) · [the data centre UPS guide](https://www.aecups.com/en/blog/ups-for-data-centres/) · [N+1 redundancy](https://www.aecups.com/en/blog/ups-redundancy-n-plus-1/)

The ranges

## The data centre ranges

### IST6-120

VRLA

30–120 kVA

Modular online UPS, double conversion, 30–120 kVA

Details

### IST6 200–500

VRLA

200–500 kVA

Modular online UPS, double conversion, 200–500 kVA

Details

### IST6 400–1200

VRLA

400–1,200 kVA

Modular online UPS, double conversion, 400–1,200 kVA

Details

Questions

## Questions people ask

#### What size UPS does a data centre need?

The IT load in kW at full build-out, the redundancy the design asks for, and the minutes to carry it until the generator holds the load. The UPS rating is then the load divided by the share each system may carry: all of it in N+1, all of it on each side of 2N, half of it in each of three shared systems.

#### N+1 or 2N?

N+1 covers a power module: one can fail or be serviced and the load stays on the inverter. It does not cover what the modules share: the cabinet's bypass, output and feed. 2N does, with two complete systems feeding dual-corded loads; it takes about twice the modules.

#### What is multi-bus with 3 buses?

Three UPS systems share the load so that, if one stops, the other two carry its share. For 800 kW: three IST6 400–1200, 500 kVA cabinets with 5 modules each, 15 modules in all against 20 for 2N. The IST6 200–500 and 400–1200 data give BSC dual bus and multi-bus with 3 buses.

#### How far does an IST6 system go?

One IST6 400–1200 cabinet carries up to 1,200 kVA with 12 modules of 100 kVA; up to 8 UPS in parallel reach 9.6 MW.

#### Can a data centre UPS run on lithium?

Yes: the L6 cabinets are designed for IST7 and IST6 from 6 to 1,200 kVA. An L6-50 holds 58 kWh and gives 14 minutes at 200 kW, its rated power.

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need: we answer with the model and the batteries that fit.

[Contact us](https://www.aecups.com/en/contacts/#form) [+39 02 9415 8991](tel:+390294158991)