---
title: "Online rack UPS 1–10 kVA, 2U, 230 V · IST3-J | AEC"
url: https://www.aecups.com/en/products/ist3-j/
description: "IST3-J 1–10 kVA: online UPS, rack / tower, 2U. Online protection inside the rack. Single-phase online UPS for 19-inch racks, 2U high."
language: en
---

Single-phase UPS · 230 V

# IST3-J Online rack UPS 1–10 kVA, 2U, 230 V

VRLA Online double conversion

The AEC IST3-J is an online double-conversion UPS from 1 to 10 kVA, 2U high in a 19-inch rack, for 230 V supplies. The 1 to 3 kVA ratings also stand as a tower and have a hot-pluggable battery pack.

**PF 1** output power factor

**95.5%** AC/AC efficiency

**3 years** warranty

**RCK · TWR** rack or tower, 1–3 kVA

Datasheet Manuals and catalogues [Contact us](https://www.aecups.com/en/contacts/?interest=Single-phase%20UPS&msg=About%20the%20AEC%20IST3-J%3A%20%0AQuantity%3A%20#form)

[**Try 3D** X-ray view](https://www.aecups.com/assets/models3d/ist3j-3/v79/)

Drag to turn

In 3D

## Look around the IST3-J

Drag it round, swipe on a phone or use the arrow keys. X-ray makes the enclosure see-through, so you can see what sits behind the panels.

[Open full 3D · X-ray](https://www.aecups.com/assets/models3d/ist3j-3/v79/)

Pick a size: the turn and the full 3D view follow it. Rendered from AEC's 3D models; the full 3D view zooms in, opens the unit and names every part.

Efficiency

## How efficient is the AEC IST3-J at your load?

AC/AC efficiency of each operating mode against the load: AEC's measured curves where they exist, elsewhere the typical curve derived from the datasheet figure by AEC's method. The losses and their cost follow the curve at the load you choose: drag along the chart or move the slider.

**90.83** % 100% · Measured (AEC datasheet)

Filled points: measured by AEC (AC/AC technical datasheet). Hollow points: a typical curve, the shape of the most similar measured curve (same technology and size) moved to the range's datasheet efficiency: η(load) = reference curve + (datasheet figure − its highest point), AEC's method. Dashed lines: one figure without a load (ECO, W-ECO). Between points the efficiency is read on a straight line; beyond them, the nearest end. Losses = P × (1/η − 1).

**Load**: —

**Lost as heat**: —

**Energy lost in a year, 24/7**: —

**Its cost in a year at € per kWh**: —

The catalogue's examples use €0.20 per kWh.

#### Where each figure comes from

| Mode | Efficiency | Kind | Models | Source |
| --- | --- | --- | --- | --- |
| Online, double conversion | 30%: 86.14% · 50%: 88.7% · 75%: 90.06% · 100%: 90.83% | Measured (AEC datasheet) | IST3-J 1 kVA | AEC technical datasheet IST3-J 1–3 kVA: AC/AC efficiency |
| ECO | 98.3% | Datasheet figure, load not stated | all | AEC technical datasheet IST3-J 1–3 kVA: AC/AC efficiency |
| Online, double conversion | 30%: 89.36% · 50%: 91.23% · 75%: 92.16% · 100%: 92.56% | Measured (AEC datasheet) | IST3-J 2 kVA | AEC technical datasheet IST3-J 1–3 kVA: AC/AC efficiency |
| Online, double conversion | 30%: 90.84% · 50%: 91.85% · 75%: 93.3% · 100%: 93.1% | Measured (AEC datasheet) | IST3-J 3 kVA | AEC technical datasheet IST3-J 1–3 kVA: AC/AC efficiency |
| Online, double conversion | 30%: 93.04% · 50%: 94.05% · 75%: 95.5% · 100%: 95.3% | Typical curve, derived from the datasheet efficiency of 95.5% (AEC method) | IST3-J 6 kVA · IST3-J 10 kVA | AEC technical datasheet IST3-J 1–3 kVA: AC/AC efficiency |

EMEA 2026 catalogue figures: Online, double conversion up to 95.5%.

The display

## The IST3-J 1–3 kVA display

The real display, drawn by AEC's own simulator: pick a UPS state (normal, battery, bypass) or a main page.

UPS state

IST3-J 1–3 kVA · the real display

### Output voltage

**Main pages**

What is what

## Inside the IST3-J, part by part.

Each number on the picture is named in the list.

### Rear · 1 kVA

1. **Output sockets** 8 × IEC C13: general outlets for the critical loads, programmable outlets for the others.
2. **Input socket** Mains input socket (IEC C14).
3. **Over-current protector** Resettable protector of the mains input.
4. **External battery port** DC input for the optional 2U battery box.
5. **Cooling fan** Leave 300–500 mm free at the rear and sides for the air flow.
6. **EPO connector** The EPO input cuts the output.
7. **RS232 port** For the UPS power management software: monitoring, remote ON / OFF.
8. **Intelligent slot** USB as standard; optional RS485 + dry-contact card or SNMP card.

### Rear · 2–3 kVA

The rear of the 2–3 kVA: IEC sockets, the mains input, the battery port and the communication ports.

1. **Output sockets** 8 × IEC C13 + 1 × IEC C19: general outlets for the critical loads, programmable outlets for the others.
2. **Input socket** Mains input socket (IEC C20).
3. **Over-current protector** Resettable protector of the mains input.
4. **External battery port** DC input for the optional 2U battery box.
5. **Cooling fans** Leave 300–500 mm free at the rear and sides for the air flow.
6. **EPO connector** The EPO input cuts the output.
7. **RS232 port** For the UPS power management software: monitoring, remote ON / OFF.
8. **Intelligent slot** USB as standard; optional RS485 + dry-contact card or SNMP card.

### Rear · 1–3 kVA with battery box

1. **Output sockets** 8 × IEC C13: general outlets for the critical loads, programmable outlets for the others.
2. **Input socket** Mains input socket (IEC C14).
3. **Over-current protector** Resettable protector of the mains input.
4. **External battery port** DC input for the optional 2U battery box.
5. **Cooling fan** Leave 300–500 mm free at the rear and sides for the air flow.
6. **EPO connector** The EPO input cuts the output.
7. **RS232 port** For the UPS power management software: monitoring, remote ON / OFF.
8. **Intelligent slot** USB as standard; optional RS485 + dry-contact card or SNMP card.
9. **Battery input** Two battery ports: to the UPS's DC input and on to the next battery box.
10. **Battery breaker** The battery string's breaker.

### Rear · 6–10 kVA

The rear of the 6–10 kVA: the terminal block for the wiring, two IEC output sockets and the communication ports.

1. **Battery expansion port** DC input for the external battery: 192 V by default, 12 to 20 blocks of 12 V settable.
2. **Surge protection grounding** Ground point of the surge protection.
3. **Input breaker** Mains input breaker of the UPS. Upstream breaker recommended: 50 A (6 kVA), 100 A (10 kVA).
4. **Over-current protector** Resettable protector, 250 V AC 10 A.
5. **Output sockets** IEC output sockets, 10 A max.
6. **Wire terminal** Input and output cables on screw terminals; size the cables by current.
7. **Parallel port** 10 kVA /B model only: two units in parallel.
8. **RS232 port** For the UPS power management software: monitoring, remote ON / OFF.
9. **EPO connector** The EPO input cuts the output.
10. **Intelligent slot** Optional RS485 + dry-contact card or SNMP card.

Overview

## Key facts

**Power range**: 1–10 kVA

**Input / output**: 1/1 · 208 / 220 / 230 / 240 V

**Efficiency**: 95.5% online double conversion · 98.3% ECO

**Battery**: 36 V · 48 V · 72 V · 192 V default (12–20 × 12 V settable)

**Communication**: RS232 + USB · options: RS485 + dry contact, protocol card, SNMP · RS232

**Network card**: SNMP card (optional)

**Warranty**: 3 years

**Dimensions W × D × H**: 438 × 423 × 86 to 438 × 572 × 86 mm

[Applications](https://www.aecups.com/en/applications/): Servers & data centres Telecom systems Finance & stock Networks Railway Postal services

Pictures

## The IST3-J in pictures

The photos and drawings of the EMEA 2026 catalogue: product views, displays, modules and connections. Tap a picture to enlarge it.

Models

## Which IST3-J fits your load?

Every rating has its own page: that model's technical data, ordering codes, batteries and the questions people ask.

[**IST3-J 1 kVA** 1 kVA The IST3-J 1 kVA is a 1 kVA / 1 kW single-phase online double-conversion UPS in a 2U, 19-inch chassis, 438 × 423 mm, with three internal 12 V 9 Ah batteries. **438 × 423 × 86 mm**Size **14 kg**Weight See the model](https://www.aecups.com/en/products/ist3-j/ist3j-1k/) [**IST3-J 2 kVA** 2 kVA The IST3-J 2 kVA is a 2 kVA / 2 kW single-phase online double-conversion UPS, 2U high and 572 mm deep, with four internal 12 V 9 Ah batteries. **438 × 572 × 86 mm**Size **20 kg**Weight See the model](https://www.aecups.com/en/products/ist3-j/ist3j-2k/) [**IST3-J 3 kVA** 3 kVA The IST3-J 3 kVA is a 3 kVA / 3 kW single-phase online double-conversion UPS in 2U, with six internal 12 V 9 Ah batteries. **438 × 572 × 86 mm**Size **26 kg**Weight See the model](https://www.aecups.com/en/products/ist3-j/ist3j-3k/) [**IST3-J 6 kVA** 6 kVA The IST3-J 6 kVA is a 6 kVA / 6 kW single-phase online double-conversion UPS in a 2U chassis of 10.6 kg, a long backup model that runs on an external battery. **438 × 500 × 86 mm**Size **10.6 kg**Weight See the model](https://www.aecups.com/en/products/ist3-j/ist3j-6k/) [**IST3-J 10 kVA** 10 kVA The IST3-J 10 kVA is a 10 kVA / 10 kW single-phase online double-conversion UPS in 2U and 12.2 kg, with an external battery and a /B version for parallel operation. **438 × 500 × 86 mm**Size **12.2 kg**Weight See the model](https://www.aecups.com/en/products/ist3-j/ist3j-10k/)

Datasheet

## Datasheet IST3-J.

Every model side by side: keep only what differs, take it as CSV or print it.

**IST3-J · Technical data**

| Model | 1 kVA | 2 kVA | 3 kVA | 6 kVA (L) | 10 kVA (/B) |
| --- | --- | --- | --- | --- | --- |
| Rating |  |  |  |  |  |
| Power (VA / W) | 1000 / 1000 | 2000 / 2000 | 3000 / 3000 | 6000 / 6000 | 10000 / 10000 |
| Input |  |  |  |  |  |
| Voltage range | 176–295 V > 75% load · 154–176 V 50–75% · 120–154 V < 50% | 176–275 V full load · 80–176 V linear derating |  |  |  |
| Frequency · connection | 50 / 60 Hz ± 10%, self-adapting · single phase, L + N + PE, TN system |  |  |  |  |
| Output |  |  |  |  |  |
| Voltage | 208 / 220 / 230 / 240 V ± 1%, settable | 220 V ± 2% default · 208 / 220 / 230 / 240 V |  |  |  |
| Frequency · waveform · transfer | 50 / 60 Hz ± 0.2% in battery mode · sine wave · 0 ms |  |  |  |  |
| Voltage distortion | THD < 2% (linear load) | THD < 1% linear · < 4% non-linear |  |  |  |
| Power factor | 1.0 (kVA = kW) |  |  |  |  |
| Overload | 105–110% 10 min · 110–130% 1 min · 130–150% 1 s · > 150% 200 ms | 115–130% 10 min · 130–150% 30 s · > 150% 500 ms |  |  |  |
| Output outlets | 8 × C13 (1 kVA) · 8 × C13 + 1 × C19 (2–3 kVA) | 2 × IEC C13 (each ≤ 10 A) + wire terminal |  |  |  |
| Battery |  |  |  |  |  |
| Battery voltage | 36 V | 48 V | 72 V | 192 V default (12–20 × 12 V settable) | 192 V default (12–20 × 12 V settable) |
| Backup · recharge | 3 min full load · < 10 h | external battery, any backup time |  |  |  |
| General |  |  |  |  |  |
| Communication | RS232 + USB · options: RS485 + dry contact, protocol card, SNMP | RS232 · intelligent slot options |  |  |  |
| Protections | battery under-voltage, overload, short circuit, over-temperature, input overvoltage |  |  |  |  |
| Noise | < 50 dB | < 55 dB |  |  |  |
| Environment | −5 … 50 °C (derated 40–50 °C) · 0–95% RH · IP20 · 2000 m | −5 … 40 °C · 0–95% RH · < 1000 m (derate above) |  |  |  |
| Dimensions W × D × H (mm) | 438 × 423 × 86 | 438 × 572 × 86 | 438 × 572 × 86 | 438 × 500 × 86 | 438 × 500 × 86 |
| Weight (kg) | 14 | 20 | 26 | 10.6 | 12.2 |

6 kVA: long backup model only (L). 10 kVA: long backup, /B parallel version. Specifications are subject to change without notice.

#### **Full technical details** 11 sections of the EMEA 2026 catalogue: functions, panel, connections, diagrams and ordering codes

### Why IST3-J

01 **2U · 19-inch rack** 19-inch, 2U: UPS and battery box mount in the same cabinet, with the battery box below the UPS.

02 **RCK · TWR · Rack or tower** 1–3 kVA: the LCD reading is set for rack (default) or tower mounting from the panel.

03 **Hot-plug · Battery packs** On 1–3 kVA the battery packs of the UPS and of the battery box are hot-pluggable, from the front.

04 **Programmable · Outlets that save backup** Optional programmable outlets switch off non-critical loads after a set time on battery, to extend backup.

05 **120 V · The battery stays full** Down to 120 V of mains (1–3 kVA, load below 50%) the battery does not discharge, so it stays at 100%.

06 **1–8 A · Charger to match the battery** 1–3 kVA with the 7 A charging module: charging current 1–8 A (default 1 A).

THE RANGE

## From 1 to 10 kVA, always 2U

Three frames in the same 19-inch, 2U format. On 1–3 kVA the optional battery box has the same footprint as the UPS.

- AEC rack battery cabinets: BBJ, up to 8 × 12 V 9 Ah, 2U, 438 × 413 mm, 6 kg; BBJ2, up to 16 × 12 V 9 Ah, 3U, 438 × 500 mm, 10 kg.
- Several cabinets per UPS for longer backup; for the number of cabinets per UPS, see the ordering codes.
- Rack examples: UPS 1–3 kVA (2U) with two battery boxes (2U each); long backup UPS 6–10 kVA (2U) with two BBJ2 · 16 × 9 Ah (3U each). Heavy units always below the UPS.
- 2U UPS height, 1–10 kVA · 19" rack format, chassis 438 mm · 3 min at full load, 1–3 kVA standard · 192 V battery on 6–10 kVA, 12–20 × 12 V.
- Batteries inside the UPS are 12 V 9 Ah on every 1–3 kVA model (codes IST3J-1-3X9 · IST3J-2-4X9 · IST3J-3-6X9). The optional 1 kVA battery box takes the same 9 Ah blocks: 2 × 3 × 12 V 9 Ah (catalogue p. 29, edition of 31 October 2026).

**From 1 to 10 kVA, always 2U**

| UPS | Battery box: batteries | W × D × H (mm) | kg |
| --- | --- | --- | --- |
| 1 kVA | 2 × (3 × 12 V 9 Ah) | 438 × 420 × 87 | 20 |
| 2 kVA | 2 × (4 × 12 V 9 Ah) | 438 × 570 × 87 | 29 |
| 3 kVA | 2 × (6 × 12 V 9 Ah) | 438 × 570 × 87 | 40 |

HOW IT WORKS

## Online double conversion in two rack units

Active PFC, a half-bridge inverter and a DC/DC boost; on 6–10 kVA the charger is fed from the DC bus.

- Step 1 · Active PFC: with the mains normal, the PFC turns the input into a steady ±360 V DC bus with a high input power factor.
- Step 2 · Half-bridge inverter: the DC/AC inverter rebuilds a steady sine wave for the load while the battery is charged.
- Step 3 · DC/DC boost: with the mains abnormal, the DC/DC raises the battery voltage to the DC bus. The charger is fully isolated on every size.
- Rack (RCK): fix two angle irons on the UPS, push it into the rack and fix it; the battery box mounts the same way, below the UPS. The battery box is heavy: always mount it below the UPS.
- Tower (TWR, 1–3 kVA): fit the support bases, stand the UPS on them, then set TWR on the panel. With a battery box, add two 1U joint bases per box. Default reading: RCK.
- 0 ms transfer time · ±360 V DC bus · ±0.2% output frequency in battery mode · THD < 2% with linear load (1–3 kVA).

BATTERY-FRIENDLY

## More backup where it matters

A wide input window saves the battery for real outages; programmable outlets and a settable charger stretch backup and battery life.

- 1–3 kVA: 176–295 V above 75% load, 154–176 V at 50–75%, 120–154 V below 50%.
- 6–10 kVA: full load from 176 to 275 V, linear derating down to 80 V; 50 / 60 Hz ± 10%, self-adapting.
- Programmable outlets (optional, 1–3 kVA): on mains failure the general outlets keep critical loads on battery, while the programmable outlets for non-critical loads switch off after a time limit of 0–999 min, set from the PC.
- Discharge time limit, 2–3 kVA: no time limit with load below 75%; 6.0 min at 75% load down to 3.0 min at 100%. 75–100% load: T = 18000 / (2 × load % − 100) / 60 (T in minutes). The 1 kVA model has no time limit.
- Charging current 1 A by default; 2–8 A settable only with the 7 A charging module. Recommended: 0.1–0.2 C of the battery capacity.
- Hot-pluggable battery packs: UPS and battery box, 1–3 kVA, replaced from the front panel. Use the same capacity, model and make.

1 · 2 · 3 KVA

## Everything on the rear panel

IEC outlets, IEC inlet, battery port and communication on the back of a 2U chassis.

- Output outlets: IEC C13 (plus one C19 on 2–3 kVA); general outlets for critical loads, programmable outlets (optional) for non-critical loads.
- Input inlet: IEC mains input. Over-current protector: resettable circuit protector on the input.
- External battery port: DC input for the battery box or the external battery.
- Cooling fan: one fan on 1 kVA, two on 2–3 kVA.
- EPO connector: opening the contact closes the output. RS232 port: for UPS power management software.
- Intelligent slot: USB as standard; RS485 + dry contact, protocol transfer card or SNMP card as options.
- Outlets: 1 kVA 8 × IEC 320 C13; 2–3 kVA 8 × IEC 320 C13 + 1 × IEC 320 C19. Load current per 10 A outlet: generally not more than 5 A.
- Programmable outlets: connect non-critical devices to them; a backup time limit of 0–999 minutes (default 999), set from the PC, switches them off on battery or overload, leaving more backup time to critical loads.

6 · 10 KVA

## Long backup power in a 2U chassis

The 6 and 10 kVA models are long backup models: no internal batteries, an external battery string of 192 V by default, and a wire terminal for input and output.

- Rear panel: battery expansion port · surge protection earthing · input breaker · over-current protector · output sockets · wire terminal · parallel port (/B only) · RS232 port · EPO connector · intelligent slot.
- Wide input: full load from 176 to 275 V; from 80 to 176 V the load capacity decreases linearly with the input voltage. 50 / 60 Hz ± 10%, self-adapting.
- Battery set on site: 192 V by default; 12 to 20 batteries of 12 V can be set through communication. Backup time set by the external battery.
- Parallel version: the 10 kVA /B model can be used in parallel through its parallel port.
- Overload 6–10 kVA: 115–130% 10 min, 130–150% 30 s, > 150% 500 ms.
- Output: 220 V ± 2% default, 208 / 220 / 230 / 240 V settable. THD < 1% linear, < 4% non-linear load.
- Recommended upstream input breaker: 50 A (6 kVA), 100 A (10 kVA). Noise < 55 dB · −5 … 40 °C.

PANEL AND SETTINGS

## Set the UPS from its own panel

An LCD and three buttons on the front (1–3 kVA). Settings are scrolled with SELECT and confirmed with ON; without confirmation the page closes after 20 s.

- Display: input / output voltage and frequency, load, temperature, fault code, parameters, mode; icons for mains, bypass, battery and ECO mode, silence (buzzer silenced) and failure. RCK rack reading or TWR tower reading.
- ON: hold 1 s to switch on · in mains mode hold 3 s for a battery test · in battery mode hold 3 s to silence (again 3 s to cancel) · hold 1 s to confirm.
- OFF: hold 1 s to switch off. SELECT: press to scroll voltages, frequencies, battery, temperature, load and faults · hold 5 s for the setting page.
- Fault codes: EPO (long beep) emergency stop, bypass and inverter output closed · BUS (long beep) DC bus voltage fault, inverter output closed · TMP (long beep) over-temperature, check fans and air vents · FAN (every 0.2 s) fan fault, alarm then protection.
- OUT (long beep) output short circuit or load too large · BAT (long beep) battery voltage too low or too high · load bars all flashing (every 0.2 s): overload, reduce the load · battery bars off with frame flashing (every 0.2 s): battery nearly empty.
- Settings from panel and PC: ECO or INV operating mode · output 208–240 V (default 220 V) · programmable outlets 0–999 min, from the PC · 50 / 60 Hz converter mode, from the PC.

OVERLOAD AND PROTECTION

## Absorbs peaks, contains faults

The inverter carries overloads for a set time, and the UPS protects battery, output, input, temperature, fans and DC bus.

- Overload 1–3 kVA: 105–110% 10 min, 110–130% 1 min, 130–150% 1 s, > 150% 200 ms.
- Overload 6–10 kVA: 115–130% 10 min, 130–150% 30 s, > 150% 500 ms.
- Protections: battery under-voltage · output overload and short circuit · input overvoltage · over-temperature · fan blocked or damaged · EPO emergency power off · DC bus voltage fault.
- Alarms: battery low, mains abnormal, UPS fault, overload.
- Battery care: charge for 10 hours before first use; discharge and recharge every 4–6 months (every 2 months in hot areas); in storage, charge and discharge every 3 months; after a discharge, recharge completely within 24 h.
- Output quality 1–3 kVA: 208 / 220 / 230 / 240 V ± 1%, settable; THD < 2% linear load.
- Output quality 6–10 kVA: 220 V ± 2% default, 208 / 220 / 230 / 240 V settable; THD < 1% linear, < 4% non-linear load.
- Do not connect half-wave rectified or inductive loads such as motors or air conditioners.
- 3 min at full load (standard 1–3 kVA) · < 10 h charge recovery (standard models) · 1–8 A charging current with module · 24 h full recharge after a discharge.

CONNECTIVITY

## Monitored from the desk or the network

RS232 and USB with power management software as standard; cards for SNMP, RS485 with dry contacts or protocol transfer in the intelligent slot.

- RS232 · USB (standard): power management software for monitoring of status and electrical data, remote ON / OFF, support for an external SNMP adaptor on RS232. USB on 1–3 kVA.
- Intelligent slot cards (optional): RS485 + dry contact; protocol transfer card (1–3 kVA; RS232 or RS485 on DB9, not both at once; RS485 reserved for lithium battery communication).
- SNMP card (optional): RJ45 network port, COM1 for a temperature and humidity module (RS485), status indicators for running and alarm.
- EPO (standard): the EPO input cuts the output.
- Dry-contact outputs normally closed by default; jumpers CN1–CN3 select NC (pins 1–2, default) or NO (pins 2–3). Input signal below 60 V DC or 42 V AC RMS, below 1.25 A.

**Monitored from the desk or the network**

| Pin | Signal |
| --- | --- |
| 1 · 2 | Mains abnormal: COM · NC/NO |
| 3 · 4 | Battery undervoltage: COM · NC/NO |
| 5 · 6 | UPS failure: COM · NC/NO |
| 7 · 8 | RS485-A · RS485-B |

INSTALLATION

## In the rack or on the floor

Rack mounting with angle irons, tower mounting on support bases. Size the input breaker for the model and keep the air vents free.

- Rack mounting in 4 steps: fit the right plastic panel; fix two angle irons on the UPS; push the UPS into the rack; fix the UPS on the rack, with the battery box below, the same way.
- Clearance of at least 300–500 mm around the UPS and 500 mm on top (1–3 kVA, tower or free-standing).
- −5 … 50 °C on 1–3 kVA, derating 40–50 °C; 6–10 kVA −5 … 40 °C · 0–95% RH non-condensing.
- Altitude ≤ 2000 m on 1–3 kVA; 6–10 kVA < 1000 m · TN system, N-PE below 5 V.
- 1–3 kVA cables for about 5 m; 6–10 kVA: size cables by current. Input breaker 1.5–2 times the maximum input current, without leakage protection.
- Tower: fit the support bases, stand the UPS on them, then set TWR on the panel; add two 1U joint bases per battery box.
- Intelligent slot: cards in 3 steps; remove the standard slot, fit and fix the optional card, connect the communication cable.
- Battery, front replacement: 1–3 kVA hot-pluggable battery packs, replaced after removing the plastic panel and battery plate.
- First start (1–3 kVA): 10 h first charge before use; connect the UPS to the mains, hold ON for 1 s; about 10 s later, if the UPS runs steadily, start the loads.

**In the rack or on the floor**

| Model | AC input max. (A) | AC breaker (A) | DC input max. (A) | DC breaker (A) | AC cable (mm²) | DC cable (mm²) |
| --- | --- | --- | --- | --- | --- | --- |
| 1 kVA | 6 | 10 | 29.1 (rated) | — | 0.75 | 6 |
| 2 kVA | 12 | 20 | 42.6 (rated) | — | 1.5 | 6 |
| 3 kVA | 18 | 32 | 42.6 (rated) | — | 2.5 | 6 |
| 6 kVA | 36 | 50 | 39 | 50 | — | — |
| 10 kVA | 60 | 100 | 65 | 100 | — | — |

### Ordering codes IST3-J

| Code | Description |
| --- | --- |
| `IST3J-1-3X9 · IST3J-2-4X9 · IST3J-3-6X9` | UPS with internal 12 V 9 Ah batteries (3 · 4 · 6) |
| `IST3J-\[kVA\]-\[n\]X9` | 1–3 kVA with internal batteries plus BBJ / BBJ2 rack cabinets, n × 12 V 9 Ah in total |
| `IST3J-6 · IST3J-10` | 6 / 10 kVA, external batteries only |
| `IST3J-6/10-\[n\]X9` | 6 / 10 kVA with 1 to 8 BBJ2 cabinets, 16 to 128 × 12 V 9 Ah |
| `BBJ · BBJ2` | Rack battery cabinet, max. 8 × 12 V 9 Ah (2U) · max. 16 × 12 V 9 Ah (3U) |

Diagrams

## The IST3-J, in diagrams

The path of the power, the ratings, the footprints and the losses, drawn from the figures of the EMEA 2026 catalogue.

### How the power flows

Pick an operating mode: the path the power takes to the load lights up.

**Normal.** Double conversion: the rectifier feeds the DC bus, the inverter rebuilds a clean voltage and the load always runs on the inverter. The battery stays on charge.

### The ratings

Every model in the range, in proportion to its power.

1. IST3J-1 **1 kVA · 1 kW**
2. IST3J-2 **2 kVA · 2 kW**
3. IST3J-3 **3 kVA · 3 kW**
4. IST3J-6 **6 kVA · 6 kW**
5. IST3J-10 **10 kVA · 10 kW**

### Phase configurations

Input / output: three-phase (3) or single-phase (1).

**1/1** 1~ → 1~

Questions

## Questions people ask

#### Can the IST3-J be mounted in a rack and as a tower?

Yes for the 1–3 kVA: every model from 1 to 10 kVA is 19-inch and 2U high, and the 1–3 kVA models can also stand as a tower: the LCD reading is set to RCK (rack, default) or TWR (tower) from the panel. The battery box always mounts below the UPS.

#### What backup time does the IST3-J offer?

The 1–3 kVA standard models give 3 minutes at full load with internal batteries, extended with BBJ (2U, up to 8 × 12 V 9 Ah) or BBJ2 (3U, up to 16 × 12 V 9 Ah) rack cabinets. The 6 and 10 kVA are long backup models with no internal batteries: an external string of 192 V by default (12–20 × 12 V settable) sets the backup time, with 1 to 8 BBJ2 cabinets.

#### What do the programmable outlets do?

On 1–3 kVA, the optional programmable outlets switch off non-critical loads after a time limit of 0–999 minutes on battery, set from the PC (default 999). The general outlets keep the critical loads running, so they get more backup time.

#### Can IST3-J units run in parallel?

Only the 10 kVA /B version can be used in parallel, through its parallel port. The other models work as single units.

#### Can the batteries be replaced without switching off?

Yes, on the 1–3 kVA: the battery packs of the UPS and of the battery box are hot-pluggable and replaced from the front, using the same capacity, model and make. The charging current is 1 A by default, settable to 2–8 A with the 7 A charging module.

#### What are the IST3-J dimensions, weights and outlets?

The 1 kVA measures 438 × 423 × 86 mm (14 kg) with 8 × IEC C13 outlets. The 2–3 kVA measure 438 × 572 × 86 mm (20 / 26 kg) with 8 × C13 + 1 × C19; the 6–10 kVA measure 438 × 500 × 86 mm (10.6 / 12.2 kg) with 2 × C13 and a wire terminal. On 1–3 kVA leave at least 300–500 mm around the UPS and 500 mm on top.

#### Which communication options does the IST3-J have?

RS232 with power management software is standard, plus USB on 1–3 kVA and an EPO input. The intelligent slot takes an optional SNMP card (RJ45 network port and COM1 for a temperature and humidity module), an RS485 and dry-contact card, or a protocol transfer card (1–3 kVA).

[All 20 questions](https://www.aecups.com/en/faq/ist3-j/)

In the same family: [IST3](https://www.aecups.com/en/products/ist3/) [IST8](https://www.aecups.com/en/products/ist8/) [Single-phase UPS](https://www.aecups.com/en/products/single-phase-ups/)

References

## Where is the IST3-J installed?

[All projects](https://www.aecups.com/en/projects/)

[**IST9 and IST3-J rack UPS for a group's server rooms in Germany** Server rooms · Germany](https://www.aecups.com/en/projects/#germany-server-rooms-ist9-ist3j)

Guides

## Guides on the IST3-J

[All guides](https://www.aecups.com/en/blog/)

[**UPS for CCTV and video surveillance systems** A UPS for CCTV keeps cameras, NVR and PoE switches recording through power cuts. How to choose the technology, size it and plan the runtime.](https://www.aecups.com/en/blog/ups-for-cctv/) [**UPS for home: protect devices, router and data** A UPS for home keeps router, PC, NAS and alarm running in a power cut. How to size it, which type to pick and what a 3 kW whole-home UPS involves.](https://www.aecups.com/en/blog/ups-for-home/)

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need for the AEC IST3-J 1–10 kVA: we answer with the model and the batteries that fit. AEC International sells through distributors in about 80 countries and an agency in every Italian region: ask AEC which one serves your area.

[Contact us](https://www.aecups.com/en/contacts/?interest=Single-phase%20UPS&msg=About%20the%20AEC%20IST3-J%3A%20%0AQuantity%3A%20#form) [+39 02 9415 8991](tel:+390294158991)
