---
title: "Modular UPS 120 kVA · IST6-120 4 × 30 kVA | AEC"
url: https://www.aecups.com/en/products/ist6-120/ist6-120k-4x30/
description: "The IST6-120 with four 30 kVA power modules is the full 120 kVA / 120 kW modular online UPS, with a fifth slot for an N+1 module."
language: en
---

IST6-120 · Modular UPS

# IST6-120, 4 × 30 kVA Modular UPS, 30 kVA modules

VRLA 120 kVA modular online UPS, 30 kVA modules

The IST6-120 with four 30 kVA power modules is the full 120 kVA / 120 kW modular online UPS, with a fifth slot for an N+1 module. For data centres and critical buildings of 90 to 120 kW per cabinet, alone or with more cabinets in parallel.

**120 kVA / 120 kW** Rating

**600 × 860 × 2000 mm** W × D × H

**195 kg + 4 × 24 kg modules** Weight

Technical data [Catalogue (PDF)](https://www.aecups.com/docs/AEC_UPS_Catalogue_EMEA_2026.pdf#page=108) [Contact us](https://www.aecups.com/en/contacts/?interest=Modular%20UPS&msg=About%20the%20AEC%20IST6-120%2C%204%20%C3%97%2030%20kVA%20(IST6-120)%3A%20%0AQuantity%3A%20#form)

[**Try 3D** X-ray view](https://www.aecups.com/assets/models3d/ist6-120/v69/)

Quick answers

## IST6-120, 4 × 30 kVA: quick answers

**What it is**: The IST6-120 with four 30 kVA power modules is the full 120 kVA / 120 kW modular online UPS, with a fifth slot for an N+1 module.

**Who it is for**: For data centres and critical buildings of 90 to 120 kW per cabinet, alone or with more cabinets in parallel.

**Supply and configuration**: 3 ph + N + PE · 220 / 230 / 240 V L-N · 220 / 230 / 240 V L-N · 380 / 400 / 415 V L-L

**Size and weight**: 600 × 860 × 2000 mm · 195 kg + 4 × 24 kg modules

**Ordering code**: IST6-120 + 4 × IST6-30-J (+1 in the redundancy slot)

IST6-120

## What sets apart the IST6-120, 4 × 30 kVA

At 120 kVA all four power slots are used and the fifth, the redundancy slot, takes the N+1 module. The catalogue's cable table is for this rating: mains input 213 A on 4 × 120 mm², bypass and output 182 A on 4 × 95 mm², battery (±16 blocks) 330 A nominal and 377 A maximum on 3 × 95 mm². Charging reaches 40 A.

The catalogue's operating-cost example uses this cabinet at 80% load, 96 kW: 2.97 kW of losses and about 26,010 kWh a year at 97%, against 0.97 kW and 8,490 kWh in ECO mode at 99%. Beyond 120 kVA, cabinets work in parallel with ring cables, one display can monitor the whole system and a common battery can be shared.

Planning data

## IST6-120, 4 × 30 kVA: currents, breakers, cables, batteries

The rows and columns of the EMEA 2026 catalogue's and AEC manuals' tables that concern the IST6-120, 4 × 30 kVA.

### Power added one 30 kVA module at a time

**IST6-120, 4 × 30 kVA · Power added one 30 kVA module at a time**

| Load up to | Modules (N) | Modules for N+1 |
| --- | --- | --- |
| 120 kVA | 4 | 4 + redundancy slot |

Installation

## Installing the IST6-120, 4 × 30 kVA: space, heat, cables

Each figure with its source. Heat is the power lost at the peak efficiency stated.

**IST6-120, 4 × 30 kVA · installation**

| Item | Figure | Source |
| --- | --- | --- |
| Clearances | front 800 mm, rear 800 mm, top 500 mm; left and right: not given | IST6 user manual Fig. 3-2 p.44 |
| Cable entry | Bottom (standard); Top, with the top wiring accessory (cables up to 120 mm²) | IST6 user manual Fig. 3-2 p.44 |
| Heat at full load | 3.71 kW at 120 kW load, 97 % efficiency | EMEA 2026 catalogue p.109, 122; output PF 1 (EMEA 2026 catalogue) |
| Operating temperature | −5 to 40 °C | IST6 30–120 user manual |
| Switches and terminals | Mains, SPD and output switches (796 mm up) and bypass and maintenance bypass (549 mm up) inside the front door. | IST6 user manual Fig. 2-3 p.13, Fig. 3-2 p.44 |
| Door | One leaf, hinged on the right | IST6 user manual Fig. 2-3 p.13, Fig. 3-2 p.44 |
| Module withdrawal | 700 mm in front of the cabinet to withdraw a module | IST6 user manual Fig. 2-6 p.15; EMEA 2026 catalogue p.125–126 |

Size and floor

## How big it is

600 × 860 × 2000 mm · 195 kg + 4 × 24 kg modules.

**0.52 m²** footprint

**564 kg/m²** floor load

**2 m** height

Floor load = weight ÷ footprint: cabinet and modules, 195 + 4 × 24 = 291 kg.

Efficiency

## How efficient is the AEC IST6-120, 4 × 30 kVA at your load?

IST6-120, 4 × 30 kVA, 120 kW at its rating, online, double conversion (typical curve, AEC's method). Heat to remove on this curve: 25%: 1.12 kW (η 96.4%) · 50%: 1.86 kW (η 97%) · 75%: 3.07 kW (η 96.7%) · 100%: 4.48 kW (η 96.4%). At 50% load, 24/7, it loses about 16,256 kWh a year.

**97** % 50% · Typical curve, derived from the datasheet efficiency of 97% (AEC method)

How the curve is drawn and where each figure comes from: [the IST6-120 range page](https://www.aecups.com/en/products/ist6-120/#efficiency).

**Load**: —

**Lost as heat**: —

**Energy lost in a year, 24/7**: —

**Its cost in a year at € per kWh**: —

The catalogue's examples use €0.20 per kWh.

#### Where each figure comes from

| Mode | Efficiency | Kind | Models | Source |
| --- | --- | --- | --- | --- |
| Online, double conversion | 25%: 96.4% · 50%: 97% · 75%: 96.7% · 100%: 96.4% | Typical curve, derived from the datasheet efficiency of 97% (AEC method) | all | AEC datasheet: AC/AC efficiency of the IST6-PM100 100 kW power module (the curve's shape) |
| ECO | 99% | Datasheet figure, load not stated | all |  |

EMEA 2026 catalogue figures: Online, double conversion up to 97% · ECO up to 99%.

Drag to turn

In 3D

## Look around the IST6-120, 4 × 30 kVA

[Open full 3D · X-ray](https://www.aecups.com/assets/models3d/ist6-120/v69/)

Technical data

## Technical data IST6-120, 4 × 30 kVA

Only this model's values, from the EMEA 2026 catalogue table.

**IST6-120, 4 × 30 kVA · Technical data**

|  |  |
| --- | --- |
| General |  |
| Model | IST6-120 with IST6-30-J power modules |
| Rated power | 30 to 120 kVA / kW in 30 kVA steps (1–4 modules) + 1 redundancy slot |
| Topology | online double conversion, modular, hot-swap power modules, removable bypass module |
| Input |  |
| Connection · voltage | 3 ph + N + PE · 220 / 230 / 240 V L-N |
| Voltage range | 176–280 V full power · 80–176 V derated (linear load) |
| Frequency · power factor · THDi | 40–70 Hz · ≥ 0.99 · ≤ 2% resistive, ≤ 3% non-linear full load |
| Bypass | 220 / 230 / 240 V L-N; synchronisation 50 / 60 Hz ± 6 Hz |
| Battery |  |
| Voltage · blocks | ±168 … ±276 V DC · ±14 … ±23 × 12 V (default ±16; below ±16 load 80%) |
| Charging current | 10 A × number of modules (max.) |
| Functions | cold start · standard / deep test · common battery · lithium with BMS card |
| Output |  |
| Connection · voltage | 3 ph + N + PE · 220 / 230 / 240 V L-N, 380 / 400 / 415 V L-L |
| Power factor · THDv | 1 · ≤ 1% linear, ≤ 4% non-linear |
| Frequency · phase error | tracks the bypass; 50 / 60 Hz ± 0.2% without mains · ≤ 1° (balanced load) |
| Transfer · dynamic response | 0 ms synchronised, < 15 ms not synchronised · < 5% for 0↔100% step |
| Inverter overload (PF 1) | ≤ 105% continuous · 106–110% 60 min · 111–125% 10 min · 126–150% 1 min · > 151% to bypass |
| Bypass overload | < 130% continuous · 131–150% 5 min · 151–200% 1 s · 201–300% 100 ms |
| Unbalanced load | 100% |
| System |  |
| Efficiency | 97% double conversion · up to 99% ECO |
| Display · records | 7" colour touch screen · 10,000 events · 5 LEDs · status light bar |
| Communication | Modbus · RS232 · RS485 · 4 dry-contact inputs, 3 outputs · options: SNMP, dry-contact expansion, BMS card |
| Parallel | with parallel kit, ring cables; BSC dual bus |
| Environment | −5 … 40 °C · 0–95% RH · ≤ 2000 m · IP20 · < 65 dB · EMC class C3 |
| Dimensions W × D × H | 600 × 860 × 2000 mm · cable entry bottom (top with accessory) |
| Weight | cabinet without power modules 195 kg · power module 24 kg · bypass module 17 kg |

**IST6-120, 4 × 30 kVA · Models**

| Item | IST6-120, 4 × 30 kVA |
| --- | --- |
| Modules (N) | 4 |
| Modules for N+1 | 4 + redundancy slot |

Data from the IST6 120 kVA user manual. Specifications are subject to change without notice.

#### **More technical details** how it works, range tables, ordering codes

Diagrams

## How the power flows: AEC IST6-120, 4 × 30 kVA

Pick an operating mode: the path the power takes to the load lights up.

**Normal.** Double conversion: the rectifier feeds the DC bus, the inverter rebuilds a clean voltage and the load always runs on the inverter. The battery stays on charge. Efficiency up to 97%.

### Modules and redundancy

Move the slider: the modules the load needs light up, and the spare slot holds the N+1 redundancy. Each slot takes one 30 kVA module.

modules working · redundant · free slot

Planning data

## IST6-120 range tables

### Quick to install, supported for years

Footprint 600 × 860 mm, height 2000 mm; four Ø14 mm holes to floor or U-steel base.

**IST6-120, 4 × 30 kVA · Quick to install, supported for years**

| Line | Current | Cable |
| --- | --- | --- |
| Mains input | 213 A | 1 × (4 × 120) mm² |
| Bypass input | 182 A | 1 × (4 × 95) mm² |
| Output | 182 A | 1 × (4 × 95) mm² |
| Battery (±16 blocks) | 330 A nom. · 377 A max. | 1 × (3 × 95) mm² |

Ordering codes

## Ordering codes IST6-120, 4 × 30 kVA

**Ordering codes IST6-120, 4 × 30 kVA**

| Code | Description |
| --- | --- |
| IST6-120 | Modular cabinet, max. 4 × 30 kVA power modules, supplied without modules |
| IST6-30-J | 30 kVA / 30 kW power module |
| PAR - IST6 | Parallel kit |

Questions

## Questions about the IST6-120, 4 × 30 kVA

#### What cables does a full IST6-120 need?

From the user manual: mains input 213 A, 1 × (4 × 120) mm²; bypass input and output 182 A, 1 × (4 × 95) mm²; battery at ±16 blocks 330 A nominal, 377 A maximum, 1 × (3 × 95) mm². Size on site to local rules and cable length.

#### Can a 120 kVA IST6 be redundant in one cabinet?

Yes: four modules carry 120 kVA and a fifth module goes in the dedicated redundancy slot (N+1). Two system control cards and a centralised, removable bypass module complete the redundancy.

#### How long does a 120 kVA UPS like the IST6-120, 4 × 30 kVA run?

3 to 221 minutes at full load (120 kW), and 9 to 442 minutes at half load, with the AEC battery options in the table: the battery chosen sets the figure. With 34 × 12 V 80 Ah (IST6-120-34X80): 3 minutes at 100% and 9 at 50%. For other loads and batteries use the backup-time tool.

#### How big is the AEC IST6-120, 4 × 30 kVA and how much does it weigh?

The AEC IST6-120, 4 × 30 kVA measures 600 × 860 × 2000 mm; weight: 195 kg + 4 × 24 kg modules (EMEA 2026 catalogue).

Related models

## The same range: IST6-120

[The whole range](https://www.aecups.com/en/products/ist6-120/)

[**IST6-120, 1 × 30 kVA** 30 kVA](https://www.aecups.com/en/products/ist6-120/ist6-30k-1x30/) [**IST6-120, 2 × 30 kVA** 60 kVA](https://www.aecups.com/en/products/ist6-120/ist6-60k-2x30/) [**IST6-120, 3 × 30 kVA** 90 kVA · smaller rating](https://www.aecups.com/en/products/ist6-120/ist6-90k-3x30/) **IST6-120, 4 × 30 kVA** 120 kVA

Batteries and cabinets: [L6 Lithium](https://www.aecups.com/en/products/l6-lithium/) Accessories: [SNMP card](https://www.aecups.com/en/products/snmp-card/) [Dry contact card](https://www.aecups.com/en/products/dry-contact-card/)

Shared by the whole range, on the IST6-120 page: [the display simulator](https://www.aecups.com/en/products/ist6-120/#display) · [the catalogue's photos and drawings](https://www.aecups.com/en/products/ist6-120/#gallery).

Read next: [Modular UPS: how to grow power module by module](https://www.aecups.com/en/blog/modular-ups/) [UPS redundancy: N+1 or 2N, and how much a site needs](https://www.aecups.com/en/blog/ups-redundancy-n-plus-1/) [UPS for data centres: how to choose and plan](https://www.aecups.com/en/blog/ups-for-data-centres/)

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need for the AEC IST6-120, 4 × 30 kVA: we answer with the model and the batteries that fit. AEC International sells through distributors in about 80 countries and an agency in every Italian region: ask AEC which one serves your area.

[Contact us](https://www.aecups.com/en/contacts/?interest=Modular%20UPS&msg=About%20the%20AEC%20IST6-120%2C%204%20%C3%97%2030%20kVA%20(IST6-120)%3A%20%0AQuantity%3A%20#form) [+39 02 9415 8991](tel:+390294158991)
