---
title: "Hot-swappable modular UPS 200–500 kVA, 400 V · IST6 | AEC"
url: https://www.aecups.com/en/products/ist6-200-500/
description: "IST6 200–500 kVA: modular online UPS, double conversion. 50 kVA power modules in cabinets of 200, 300, 400 and 500 kVA."
language: en
---

Modular UPS · 400 V

# IST6 200–500 Hot-swappable modular UPS, 400 V

VRLA Online double conversion

The AEC IST6 200–500 is a modular online double-conversion UPS for 400 V supplies with hot-swappable 50 kVA power modules, in cabinets of 200, 300, 400 and 500 kVA. One extra module gives N+1 redundancy; efficiency up to 98.1%, THDi ≤ 1.5%, and up to eight UPS in parallel.

**50→500** kVA in 50 kVA steps

**N+1** one extra module

**98.1%** efficiency, 50 kVA module

**Hot-swap** modules replaced online

Datasheet Manuals and catalogues [Contact us](https://www.aecups.com/en/contacts/?interest=Modular%20UPS&msg=About%20the%20AEC%20IST6%20200%E2%80%93500%3A%20%0AQuantity%3A%20#form)

[**Try 3D** X-ray view](https://www.aecups.com/assets/models3d/ist6-50m-500/v57/)

Drag to turn

In 3D

## Look around the IST6 200–500

Drag it round, swipe on a phone or use the arrow keys. X-ray makes the enclosure see-through, so you can see what sits behind the panels.

[Open full 3D · X-ray](https://www.aecups.com/assets/models3d/ist6-50m-500/v57/)

Pick a size: the turn and the full 3D view follow it. Rendered from AEC's 3D models; the full 3D view zooms in, opens the unit and names every part.

Hands on

## Open the IST6 200–500 yourself.

Click the unit: the door opens, then a module comes out. Drag to move it by hand. The 3D shows every part.

[Every part in 3D](https://www.aecups.com/assets/models3d/ist6-50m-500/v57/)

Efficiency

## How efficient is the AEC IST6 200–500 at your load?

AC/AC efficiency of each operating mode against the load: AEC's measured curves where they exist, elsewhere the typical curve derived from the datasheet figure by AEC's method. The losses and their cost follow the curve at the load you choose: drag along the chart or move the slider.

**98.1** % 50% · Typical curve, derived from the datasheet efficiency of 98.1% (AEC method)

Filled points: measured by AEC (AC/AC technical datasheet). Hollow points: a typical curve, the shape of the most similar measured curve (same technology and size) moved to the range's datasheet efficiency: η(load) = reference curve + (datasheet figure − its highest point), AEC's method. Dashed lines: one figure without a load (ECO, W-ECO). Between points the efficiency is read on a straight line; beyond them, the nearest end. Losses = P × (1/η − 1). ECO and W-ECO modes are listed without an efficiency figure.

**Load**: —

**Lost as heat**: —

**Energy lost in a year, 24/7**: —

**Its cost in a year at € per kWh**: —

The catalogue's examples use €0.20 per kWh.

#### Where each figure comes from

| Mode | Efficiency | Kind | Models | Source |
| --- | --- | --- | --- | --- |
| Online, double conversion | 25%: 97.5% · 50%: 98.1% · 75%: 97.8% · 100%: 97.5% | Typical curve, derived from the datasheet efficiency of 98.1% (AEC method) | all | AEC datasheet: AC/AC efficiency of the IST6-PM100 100 kW power module (the curve's shape) |
| ECO | 99.2% | Datasheet figure, load not stated | all | AEC datasheet: AC/AC efficiency of the IST6-PM100 100 kW power module (the curve's shape) |

EMEA 2026 catalogue figures: Online, double conversion up to 98.1%.

The display

## The IST6 modular display

The real display, drawn by AEC's own simulator: pick a UPS state (normal, battery, bypass) or a main page.

UPS state

IST6 modular · the real display

### Normal operation

**Main pages**

**IST6 300 kVA in 3D, the display** The camera moves in to the display. · 0:06

What is what

## Inside the IST6 200–500, part by part.

Each number on the picture is named in the list.

### Front, door open · 200–300 kVA

200 / 300 kVA frame, 607 mm wide: the four switches at the top, then the system control box, the bypass module and the power modules, all from the front.

1. **Bypass switch** The static bypass supply.
2. **Maintenance bypass switch** Feeds the load directly while the UPS is serviced.
3. **Mains switch** The rectifier's mains supply.
4. **Output switch** To the load.
5. **Battery cold start** Starts the UPS from the battery when there is no mains and no bypass.
6. **System control box** Five hot-swappable cards: expansion and SNMP positions (optional), control cards 1 and 2, monitoring card. 4 inputs and 3 outputs (7 + 5 with the expansion card), Modbus, RS232, RS485, 2 EPO inputs (NO and NC).
7. **Bypass module** Centralised static bypass, at the top of the module column.
8. **Power modules** 50 kVA in 3U each, replaced with the load running; 6 slots on 300 kVA, 4 on 200 kVA.

### Front, doors open · 400–500 kVA

400 / 500 kVA frame, 1203 mm wide: the four switches and the system control box on the left, the 50 kW power modules on the right.

1. **Output switch**
2. **Maintenance bypass switch**
3. **Bypass switch**
4. **Mains switch**
5. **System control box**
6. **Battery cold start**
7. **Power modules** 50 kVA in 3U each, replaced with the load running.

**IST6 300 kVA in 3D, door open** The door opens on what is inside. · 0:06

Overview

## Key facts

**Power range**: 200–500 kVA

**Input / output**: 3/3 · 380 / 400 / 415 V

**Efficiency**: up to 98.1% · ECO, WECO, source share, redundancy sleep

**Battery**: ±240 V DC nominal (±180 … ±300 V), 30–50 × 12 V blocks, standard 40

**Communication**: Modbus · RS232 · RS485 · 4 inputs / 3 outputs dry contact

**Network card**: SNMP card (optional)

**Parallel**: up to 8 UPS, current imbalance ≤ 5% · BSC dual bus and multi-bus (3 buses)

**Warranty**: 3 years

**Dimensions W × D × H**: 607 × 860 × 2000 · 1203 × 864 × 2000 mm

[Applications](https://www.aecups.com/en/applications/): Data centres Telecom Banking & finance Networks & IT rooms Transport Public buildings

Pictures

## The IST6 200–500 in pictures

The photos and drawings of the EMEA 2026 catalogue: product views, displays, modules and connections. Tap a picture to enlarge it.

Models

## Which IST6 200–500 fits your load?

Every rating has its own page: that model's technical data, ordering codes, batteries and the questions people ask.

[**IST6-200, 4 × 50 kVA** 200 kVA The IST6-200 is a single-column modular online UPS cabinet for up to four 50 kVA power modules: 200 kVA / 200 kW in 607 × 860 × 2000 mm. **607 × 860 × 2000 mm**Size **224 kg without modules**Weight See the model](https://www.aecups.com/en/products/ist6-200-500/ist6-200k-4x50/) [**IST6-300, 6 × 50 kVA** 300 kVA The IST6-300 is a single-column modular online UPS cabinet for up to six 50 kVA power modules: 300 kVA / 300 kW on the 200 kVA's 607 × 860 mm. **607 × 860 × 2000 mm**Size **236 kg without modules**Weight See the model](https://www.aecups.com/en/products/ist6-200-500/ist6-300k-6x50/) [**IST6-400, 8 × 50 kVA** 400 kVA The IST6-400 is a double-column modular online UPS cabinet for up to eight 50 kVA power modules: 400 kVA / 400 kW in 1203 × 864 × 2000 mm. **1203 × 864 × 2000 mm**Size **459 kg without modules**Weight See the model](https://www.aecups.com/en/products/ist6-200-500/ist6-400k-8x50/) [**IST6-500, 10 × 50 kVA** 500 kVA The IST6 500 kVA is the largest cabinet of the 50 kVA platform: ten 50 kVA power modules and a 4.5U bypass module in a 1203 × 864 × 2000 mm double column. **1203 × 864 × 2000 mm**Size **506 kg without modules**Weight See the model](https://www.aecups.com/en/products/ist6-200-500/ist6-500k-10x50/)

Datasheet

## Datasheet IST6 200–500.

Every model side by side: keep only what differs, take it as CSV or print it.

**IST6 200–500 · Technical data**

| Model | 200 kVA | 300 kVA | 400 kVA | 500 kVA |
| --- | --- | --- | --- | --- |
| Cabinet |  |  |  |  |
| Power modules · rating | 4 × 50 kVA | 6 × 50 kVA | 8 × 50 kVA | 10 × 50 kVA |
| Bypass module | 200 kVA · 3U | 300 kVA · 3U | 400 kVA · 3U | 500 kVA · 4.5U |
| Input |  |  |  |  |
| System · voltage | 3Ph+N+PE · 380 / 400 / 415 V; 138–485 V (full power 324–485 V, linear derating below) |  |  |  |
| Frequency · PF · THDi | 40–70 Hz · ≥ 0.99 · ≤ 1.5% at full load |  |  |  |
| Bypass | 304–438 V; synchronisation 50 ± 5 / 60 ± 6 Hz; settable window |  |  |  |
| Battery |  |  |  |  |
| Lead-acid | ±240 V DC nominal (±180 … ±300 V), 30–50 × 12 V blocks, standard 40 |  |  |  |
| Lithium (with BMS card) | ±256 V DC nominal (±192 … ±294.4 V), 120–200 cells, standard 160 |  |  |  |
| Charging current | up to 30 A × number of modules · cold start · shared battery |  |  |  |
| Output |  |  |  |  |
| System · voltage | 3Ph+N+PE (3Ph+PE optional) · 380 / 400 / 415 V ± 1% |  |  |  |
| Power factor · THDv | settable 0.8–1.0 (default 1.0) · ≤ 1% linear, ≤ 4% non-linear |  |  |  |
| Frequency · phase error | tracks the bypass; 50 / 60 ± 0.1 Hz with mains abnormal · ≤ 1° balanced, ≤ 3° unbalanced |  |  |  |
| Transfer | mains ↔ battery 0 ms · bypass ↔ inverter < 1 ms synchronised, < 15 ms |  |  |  |
| Inverter overload (PF 1) | ≤ 105% continuous · 105–110% 60 min · 110–125% 10 min · 125–150% 1 min · > 150% to bypass |  |  |  |
| Bypass overload | ≤ 130% continuous · 130–150% 5 min · 150–200% 1 min · 200–300% 100 ms |  |  |  |
| System |  |  |  |  |
| Efficiency · modes | up to 98.1% · ECO, WECO, source share, redundancy sleep |  |  |  |
| Parallel | up to 8 UPS, current imbalance ≤ 5% · BSC dual bus and multi-bus (3 buses) |  |  |  |
| Communication | Modbus · RS232 · RS485 · 4 inputs / 3 outputs dry contact · options: SNMP, expansion, BMS |  |  |  |
| Environment | 0 … 40 °C · 0–95% RH · ≤ 2000 m (derating to 4000 m) · IP20 · < 70 dB · EMC C3 |  |  |  |
| W × D × H (mm) | 607 × 860 × 2000 | 607 × 860 × 2000 | 1203 × 864 × 2000 | 1203 × 864 × 2000 |
| Weight without power modules | 224 kg | 236 kg | 459 kg | 506 kg |

Power module 500 × 650 × 130 mm, 39 kg. Data from the IST6 200–500 kVA user manual. Specifications are subject to change without notice.

#### **Full technical details** 20 sections of the EMEA 2026 catalogue: functions, panel, connections, diagrams and ordering codes

### Why IST6 200–500

01 **200→500 · Sized to the site** Four cabinets with 4, 6, 8 or 10 power modules of 50 kVA; modules added when the load grows.

02 **98.1% · High efficiency** Up to 98.1% in double conversion, plus ECO and WECO modes and redundancy sleep for spare modules.

03 **≤ 1.5% · Clean for the grid** Input power factor ≥ 0.99 and THDi ≤ 1.5% at full load: smaller upstream cables, transformers and generators.

04 **Hot-swap · Continuity first** Power modules and the five cards of the system control box are hot-swappable; two control cards back each other up.

05 **30–50 · Battery set on site** 30 to 50 blocks of 12 V per string, lead-acid or lithium; charging current up to 30 A per module.

06 **Touch · Easy to run** Touch screen with live power flow, 10,000 events, wave capture of faults and monthly energy records.

OPERATING COST

## What 98.1% means at 240 kW

Every point of efficiency is heat that is not paid for at the meter and in the room cooling.

- 4.65 kW losses at 98.1% efficiency; 40,700 kWh per year; ≈ € 8,100 per year at € 0.20/kWh.
- Each additional point of efficiency at this load saves about 2.5 kW, that is about 22,100 kWh per year.
- IST6 300 kVA at 80% load (240 kW), 8,760 h/year, cooling excluded; losses = P × (1/η − 1). Indicative values.

FEATURE OVERVIEW

## The features, group by group

The IST6 200–500 kVA features, in the catalogue's four groups.

- Reliable: system redundancy (components, modules and UPS); power walk-in, a smooth transfer from battery to the rectifier; short-circuit protection with settable trip time; backfeed protection for upstream maintenance staff; smart charge scheme, single module up to 30 A; wide input 138–485 V, 40–70 Hz; anti-corrosion coating on all PCBs.
- Flexible: lead-acid or lithium batteries; common battery bank in parallel systems; frequency converter 50 ↔ 60 Hz; fan dedusting function; parallel up to 8 UPS, dual and multi-bus.
- Intelligent: W-ECO mode; fault trace with smart wave capture; programmable dry contacts with 10 input and 17 output functions; intelligent redundancy sleep; smart generator mode; live single-line diagram on the touch screen.
- Efficiency and grid: up to 98.1% efficiency in double conversion; ECO and W-ECO modes; input THDi ≤ 1.5%, power factor ≥ 0.99; self-load test without external load banks.
- Power walk-in, short-circuit protection and backfeed protection are advanced protection functions of the 50 kVA power module.
- Up to 98.1% efficiency; input THDi ≤ 1.5%; 30 A charging per module; 8 UPS in parallel.

THE RANGE

## Four cabinets, one 50 kVA module

Single-column cabinets for 200 and 300 kVA, double-column cabinets for 400 and 500 kVA: the same power module, the same display, the same functions.

- 200 · 300 kVA: single column, 607 mm wide; 400 · 500 kVA: double column, 1203 mm wide; height 2000 mm.
- Power module 500 × 650 × 130 mm, 39 kg.
- Codes: IST6-200 cabinet for up to 4 × 50 kVA modules; IST6-300 for up to 6 × 50 kVA; IST6-400 for up to 8 × 50 kVA; IST6-500 for up to 10 × 50 kVA, all without modules; IST6-50-J 50 kVA / 50 kW power module.

**Four cabinets, one 50 kVA module**

| Cabinet | 200 kVA | 300 kVA | 400 kVA | 500 kVA |
| --- | --- | --- | --- | --- |
| Power modules (50 kVA) | 4 | 6 | 8 | 10 |
| Bypass module | 200 kVA · 3U | 300 kVA · 3U | 400 kVA · 3U | 500 kVA · 4.5U |
| W × D × H (mm) | 607 × 860 × 2000 | 607 × 860 × 2000 | 1203 × 864 × 2000 | 1203 × 864 × 2000 |
| Weight without power modules | 224 kg | 236 kg | 459 kg | 506 kg |
| Mains input current | 345 A | 518 A | 690 A | 863 A |
| Cooling air flow (min.) | 2420 m³/h | 3630 m³/h | 4840 m³/h | 6050 m³/h |

MODULES AND HOT-SWAP

## 50 kVA in 3U, replaced with the load running

Rectifier, inverter and DC/DC converter in each 3U power module; the bypass module carries the static switch. Power modules and control cards are hot-swappable.

- 50 kVA power module: 500 × 650 × 130 mm, 39 kg. Bypass module: 3U (200–400 kVA), 4.5U (500 kVA).
- Front: 1 RUN (green), 2 ALARM (yellow), 3 FAULT (red), 4 ready switch (green unlocked, red locked). Rear: 5 communication port, 6 output port, 7 input port (AC input and DC battery).
- Step 1, unlock: ready switch to unlocked, indication green, the module can be removed.
- Step 2, pull out: remove the fixing screws and pull the module out by its handles onto a lift truck; the other modules keep supplying the load.
- Step 3, insert and lock: slide the new module in, fasten the screws and lock; indication red, the module joins the system.
- 2 system control cards backing each other up; 5 hot-swappable control box cards; wait ≥ 15 min before opening a removed module.

INSIDE THE CABINET

## Every module in front, switches in reach

300 kVA and 500 kVA with the door open, next to their structure layouts from the user manual.

- 200 / 300 kVA: 1 bypass switch, 2 maintenance bypass switch, 3 output switch, 4 mains switch, 5 battery cold start button, 6 system control box with five hot-swappable cards, 7 bypass module, 8 power modules 1–6 (200 kVA: 4 module slots).
- Module sequence (200 / 300 kVA), from the top: bypass module, then power modules 1 to 6.
- 400 / 500 kVA: 1 output switch, 2 system control box, 3 maintenance bypass switch, 4 bypass switch, 5 mains switch, 6 SPD (optional), 7 SPD switch (optional), 8 power modules (even above, odd below), 9 bypass module 4.5U, 10 battery cold start button.
- 500 kVA: 10 × 50 kVA power modules; 400 kVA: 8 module slots.

ARCHITECTURE

## Online double conversion in every module

Power flow in each operating mode, as drawn in the user manual: N power modules in parallel and one bypass module.

- Mains mode: each module rectifies the mains and the inverter supplies the load; the battery is charged.
- Battery mode: mains abnormal, the DC/DC converter boosts the battery to the inverters, 0 ms.
- Bypass mode: on overload or fault the bypass module supplies the load.
- Maintenance bypass mode: bypass, mains and output switches open; the load stays on the maintenance bypass for service.
- Two control cards: primary and secondary system control cards, hot-swappable, backing each other up.
- Synchronised modules: CAN communication inside and between cabinets for synchronisation and current sharing.
- Current sharing: load shared equally between power modules within 5%.
- No break: mains ↔ battery transfer time 0 ms; bypass ↔ inverter < 1 ms synchronised.
- Input power factor ≥ 0.99; input THDi ≤ 1.5% at full load; 100% unbalanced load.

SCALE AND SLEEP

## 50 kVA steps, up to 8 UPS in parallel

Add 50 kVA modules or whole UPS as the site grows; set redundancy and redundancy sleep from the screen.

- Step size 50 kVA: one 3U module at a time, in free slots up to the cabinet rating.
- 4 → 10 modules per cabinet: 200, 300, 400 or 500 kVA cabinets.
- × 8 UPS in parallel, with N+X redundancy between UPS.
- N+X, two redundancy levels: basic and redundant modules per cabinet and per parallel system.
- Redundancy sleep (Smart mode › Sleep redundancy): spare modules can be put to sleep at light load, with a sleep cycle period (h) and a sleep safety load capacity (kVA) set on screen; settings also include parallel basic and redundant UPS and basic and redundant modules inside the cabinet.
- Running info shows the parameter match between UPS and the state of both system cards.
- Alarms when module or cabinet redundancy is missing or insufficient.
- Over RS485, one display can show the whole parallel system.
- Modules and further UPS are added and configured by AEC service.

SMART ENERGY

## Modes that save energy and protect the grid

Power flow of each mode as drawn in the user manual.

- ECO mode: with the bypass within the ECO window, the static bypass supplies the load and the inverter is in standby; the rectifier keeps the battery charged. Window ±5 / ±10 / ±15% (default ±15%), ±2 / ±4% (default ±2%).
- WECO mode: grid-tied operation on top of ECO; the inverter compensates the harmonics of the input current, raising the power factor and lowering THDi.
- Mains and battery source share: when the mains is too low to support the load, mains and battery supply the power modules together; when the mains recovers, the UPS returns to mains mode and recharges the battery.
- Generator mode: generator start output and generator-mode input; charging can be prohibited on generator.
- Grid-tied self-load: load test shown live on the home page, with its own alarms (self-load switch, time-out).
- Frequency converter: output state available on the home page.
- Up to 98.1% efficiency; ECO window ±5 … ±15%; WECO harmonic compensation; mains + battery source share.

PERFORMANCE

## Full power from 324 to 485 V

Full power from 324 to 485 V line voltage; below, the load capacity is derated linearly down to 10% at 173 V, and the UPS still runs down to 138 V.

- 40–70 Hz · PF ≥ 0.99 · THDi ≤ 1.5% at full load · TN-S, TN-C, TN-C-S, TT; RCD breakers upstream not recommended.
- Inverter overload (linear load, PF 1): ≤ 105% continuous, 105–110% 60 min, 110–125% 10 min, 125–150% 1 min; above 150% to bypass at once. PF 0.9: 105–110% 60 min, above 110% to bypass; PF 0.8: above 105% to bypass.
- Bypass overload: ≤ 130% continuous, 130–150% 5 min, 150–200% 1 min, 200–300% 100 ms; above 300% immediate protection.
- Backfeed protection: a dry-contact output signals "bypass SCR abnormal" for the backfeed device.
- Option: an output isolation transformer of the same capacity is available.
- Settable bypass window: max. +10 … +25% (default +15%), min. −10 … −30% (default −20%), frequency ±2 … ±20%.
- Input line voltage 138–485 V; THDi ≤ 1.5% at full load; output voltage accuracy ≤ 1%; bypass 300% for 100 ms.

**Full power from 324 to 485 V**

| Output | Value |
| --- | --- |
| Voltage | 380 / 400 / 415 V ± 1% |
| Power factor | settable 0.8–1.0, default 1.0 |
| THDv | ≤ 1% linear · ≤ 4% non-linear |
| Phase error | ≤ 1° balanced · ≤ 3° unbalanced |
| Frequency, mains abnormal | 50 / 60 Hz ± 0.1 Hz |
| Load step 0↔100% | < 5%, recovery ≤ 20 ms |
| DC component | −200 … +200 mV |
| Transfer bypass ↔ inverter | < 1 ms synchronised · < 15 ms |
| System | 3Ph+N+PE · 3Ph+PE optional |

ADVANCED PROTECTION

## Protection that keeps the load and the people safe

Three functions of the 50 kVA power module that protect the grid, the load and the maintenance staff.

- Power walk-in, no step on the mains or the generator: when the mains returns after an outage, the rectifier waits a delay t1, then takes the power over from the battery gradually during t2; a smooth transfer from battery mode to double conversion, with no impact on the input grid or on a generator.
- Short-circuit protection, settable trip time up to 200 ms: on an output short circuit the UPS supplies a high current for a set time, from 20 to 200 ms, so that the breaker of the faulty load trips quickly while the other loads keep running.
- Backfeed protection, safe upstream maintenance: if the static bypass fails, the UPS detects it and a dry-contact output (bypass SCR abnormal) opens the backfeed device on the bypass input, so no voltage returns towards the upstream switchboard. Enabled from the settings.
- t1 + t2 delay and walk-in time; 20–200 ms short-circuit trip time; SCR bypass fault detected; 17 dry-contact output functions.

BATTERIES

## ±240 V lead-acid or ±256 V lithium

Split battery +/N/−, ±240 V DC nominal (40 blocks of 12 V); 30 to 50 blocks accepted, with the output factor below for short strings.

- Charging current max. 30 A per power module (system default 20 A).
- Lithium: ±256 V nominal, 120–200 cells (standard 160), with the BMS card.
- Battery setting: cell voltages for protection, alarm, equalising and floating charge, charging current, test time.
- Charge management: charge limit coefficient in C, temperature compensation, timed and forced equalising charge.
- Battery test: standard or depth test with mains normal, battery floating and load ≥ 15%.
- Common battery: shared battery pack mode available for parallel systems.
- Start from battery: hold the battery cold start button for more than 3 s to start the UPS from the battery.
- Lithium: optional BMS expansion card with charge- and discharge-disable inputs.
- Options: battery temperature kit for charge compensation; battery trip kit (24 V DC) for the DC breaker.
- 30–50 blocks of 12 V per string; ±240 V lead-acid nominal; 0.05–0.5 C charge limit, lead-acid; best battery temperature 20–30 °C.

**±240 V lead-acid or ±256 V lithium**

| 12 V blocks per string (lead-acid) | 30 | 32 | 34 | 36 | 38 | 40 | 42 | 44 | 46 | 48 | 50 |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
| Output factor | 0.75 | 0.8 | 0.8 | 0.9 | 0.9 | 1 | 1 | 1 | 1 | 1 | 1 |

OPERATOR PANEL

## Touch screen, five LEDs and a light bar

A colour touch screen, five status LEDs, two-key ON / OFF commands and a status light bar.

- Colour touch screen: live power flow, measurements, settings and records.
- Five status LEDs (AC/DC, DC/AC, bypass, battery, load): green when normal or active, red when abnormal.
- ON keys: press both keys for 3 s to power on, no accidental switching; OFF keys: press both keys for 3 s to power off.
- Status light bar, four states: blue, normal operation; blue flashing, battery mode; yellow, abnormal with UPS still running; red, abnormal with UPS stopped. Alarms also light the yellow or red ambient lamp.
- Screen settings: date and time, backlight time, language, brightness.

Tap a light: green is normal operation, red an abnormal state, as in the catalogue's table.

AC/DC: green, Rectifier normal

**Touch screen, five LEDs and a light bar**

| LED | Green | Red |
| --- | --- | --- |
| AC/DC | Rectifier normal | Rectifier abnormal |
| DC/AC | Inverter normal | Inverter abnormal |
| Bypass | Bypass output | Bypass abnormal |
| Battery | Battery output | Battery low voltage |
| Load | Output normal | Output overload |

TOUCH SCREEN

## Touch a block, read its measurements

The home page draws the UPS as it runs: yellow dots trace the active power path, abnormal blocks turn red, and the bottom line shows output voltage and frequency. Touch a block (bypass, mains, battery, rectifier, inverter, output) to open its page.

- Bypass info: phase and line voltage, current and frequency of the bypass input.
- Mains info: phase and line voltage, current and frequency of the mains.
- Battery info: voltage, charge and discharge current, remaining capacity and time, temperature, state.
- Inverter info: output voltage, current, power and load of each module.
- Information menu: running info, history, user log, smart record, device info, wave capture, energy info.
- Settings menu: cabinet, battery, battery test, output, smart mode, dry contact, screen, password, communication, records.
- Running info: UPS info, parameter match between UPS, UPS status, system cards 1 and 2.
- Output info: voltage, current, active, reactive and apparent power, load, PF and frequency.
- 10,000 records in the history, newest first; 6 live info pages (mains, bypass, rectifier, inverter, battery, output); live single-line diagram with the active power path; 3 s two-key ON / OFF commands.

RECORDS

## 10,000 events and monthly energy records

10,000 records in the history, newest first. When the record is full, the earliest entry is overwritten.

- Input and output energy (MWh) recorded month by month (energy info).
- User log: user operations listed with date and time.
- Current fault: active faults, time-stamped, from the alarm icon of the menu bar.
- Smart record: maintenance actions such as part replacements.
- Smart wave capture: when a fault occurs, the UPS stores the voltage and current waveforms of the event, listed with date and time.
- Record manage: save or clear history, user log, smart record and wave capture. Battery test screen.

OPERATION

## Every operating state, shown live

Real screens of the IST6 200–500 kVA: the yellow dotted line traces the active power path.

- Inverter output: mains → rectifier → inverter → load, battery charging.
- Battery: mains abnormal, the battery feeds the inverters, 0 ms.
- Bypass: load on the bypass module, e.g. on overload or fault.
- Maintenance bypass: load on the maintenance bypass for service.
- Grid-tied self-load: load test at commissioning, shown live on the home page.
- Frequency converter: output frequency independent of the input.
- ECO: load on the static bypass within the ECO window. WECO: the bypass supplies the load, the inverter compensates harmonics.
- Transfers: mains ↔ battery 0 ms; inverter ↔ bypass < 1 ms synchronised, < 15 ms not synchronised; 3 s two-key ON / OFF commands.
- Start from battery: hold the battery cold start button for more than 3 s to start the UPS from the battery.
- After a long outage: after battery under-voltage protection, the UPS restarts and recharges the battery when the mains returns.
- Two-key ON / OFF: press both ON or both OFF keys for 3 s; no accidental switching.

CONNECTIVITY

## 4 + 3 dry contacts, 7 + 5 with the expansion card

System control box: all five cards are hot-swappable. 1 expansion card position (optional), 2 system control card 1, 3 SNMP card position (optional), 4 system control card 2, 5 system monitoring card.

- 4 inputs (NO) with 10 functions: battery abnormal, battery earthing abnormal, battery switch off, bypass switch off, generator mode, SPD abnormal, maintenance bypass open, mains switch off, environment smoke abnormal, lamp belt switch off.
- 3 outputs (NO / NC, 30 V DC / 2 A) with 17 functions: inverter mode, bypass mode, battery mode, battery trip, battery under-voltage alarm, battery under-voltage protection, output overload, UPS abnormal, bypass abnormal, mains abnormal, start generator, ECO mode, inverter abnormal, UPS ON, fan abnormal, UPS alarm, bypass SCR abnormal.
- 4 + 3 inputs + outputs as standard; 7 + 5 with the expansion card; Modbus, RS232 · RS485 · SNMP; 2 EPO inputs (NO and NC).

PARALLEL AND MULTI-BUS

## Up to eight UPS, up to three buses

System layouts from the user manual.

- Parallel system, up to 8 UPS: mains, bypass and AC outputs of the UPS connected in parallel; the control modules keep all UPS synchronised and share the load (imbalance ≤ 5%).
- BSC dual-bus system: two independent UPS systems synchronised by the bus sync controller; an STS supplies single-input loads.
- Multi-bus: three buses.
- Parallel ring: PARALLEL ports of the system control cards in a ring; N UPS need N cables. A 7 m cable is supplied with each UPS.
- Output of each UPS within ± 2 V and ± 0.1 Hz of the system setting.
- Parallel mode, parallel address and BSC address set on the screen.
- EPO linkage: one EPO stops the whole system, or only its UPS (set by AEC service).
- Shared battery pack and parallel ECO available.

INSTALLATION AND SERVICE

## Site conditions and service

0–40 °C, 0–95% RH non-condensing, up to 2000 m, vertical inclination ≤ 5°, good ventilation.

- Clearances: A front ≥ 800, B rear ≥ 500, C top ≥ 500 mm.
- Airflow front to rear: 2420 m³/h (200 kVA) to 6050 m³/h (500 kVA).
- Handling: forklift from the short side, or two forklifts from the front.
- Currents in A, cables in mm² (copper, 90 °C). Breakers valid for short-circuit current below 65 kA. TN-S, TN-C, TN-C-S, TT; RCD breakers not recommended. M12 expansion bolts (by customer); tilt ≤ 15°.
- Sizing: modules, redundancy, battery and parallel system sized by AEC engineers.
- Commissioning: start-up, settings, dry contacts and parallel addresses.
- Maintenance: monthly, quarterly and yearly checks; air filter cleaned or replaced.
- Expansion: power modules added in free slots; further UPS with the parallel kit.
- 24/7 AEC technical assistance by phone and WhatsApp; < 30 min WhatsApp reply to technical and commercial questions; 3 years warranty, extendable with a maintenance contract; 21+ countries with spare parts across the Allis Electric group.
- AEC service: service@aecups.com · +39 393 080 5211 · www.aecups.com

**Site conditions and service**

| Line | 200 kVA | 300 kVA | 400 kVA | 500 kVA |
| --- | --- | --- | --- | --- |
| Mains input | 345 A · 2×(4×120) | 518 A · 2×(4×185) | 690 A · 2×(4×185) | 863 A · 2×(4×240) |
| Bypass / output | 303 A · 2×(4×120) | 455 A · 2×(4×185) | 606 A · 2×(4×185) | 758 A · 2×(4×240) |
| Battery (40 blocks) | 434 A · 2×(3×120) | 651 A · 2×(3×185) | 868 A · 3×(3×185) | 1085 A · 3×(3×240) |
| Mains breaker | 400 A 3P | 630 A 3P | 800 A 3P | 1000 A 3P |

### Ordering codes IST6 200–500

| Code | Description |
| --- | --- |
| `IST6-200` | Modular cabinet, max. 4 × 50 kVA power modules, without modules |
| `IST6-300` | Modular cabinet, max. 6 × 50 kVA power modules, without modules |
| `IST6-400` | Modular cabinet, max. 8 × 50 kVA power modules, without modules |
| `IST6-500` | Modular cabinet, max. 10 × 50 kVA power modules, without modules |
| `IST6-50-J` | 50 kVA / 50 kW power module |
| `PAR - IST6` | Parallel kit |

Diagrams

## The IST6 200–500, in diagrams

The path of the power, the ratings, the footprints and the losses, drawn from the figures of the EMEA 2026 catalogue.

### How the power flows

Pick an operating mode: the path the power takes to the load lights up.

**Normal.** Double conversion: the rectifier feeds the DC bus, the inverter rebuilds a clean voltage and the load always runs on the inverter. The battery stays on charge. Efficiency up to 98.1% (double conversion, up to; ECO and WECO modes stated without a figure).

### The ratings

Every model in the range, in proportion to its power. Each notch is one 50 kVA module.

1. IST6-200 **200 kVA · 200 kW**
2. IST6-300 **300 kVA · 300 kW**
3. IST6-400 **400 kVA · 400 kW**
4. 500 kVA **500 kVA · 500 kW**

### Modules and redundancy

Move the slider: the modules the load needs light up, and the spare slot holds the N+1 redundancy. Each slot takes one 50 kVA module.

modules working · redundant · free slot

### Phase configurations

Input / output: three-phase (3) or single-phase (1).

**3/3** 3~ → 3~

**In parallel** Up to 8 units on the same load, for redundancy or for more power.

### Footprints to scale

Front view of the cabinets, all at the same scale, beside a 2 m rule. W × D × H, mm.

- **200 kVA cabinet, single column, without power modules** 607 × 860 × 2,000 mm · 224 kg
- **300 kVA cabinet, single column, without power modules** 607 × 860 × 2,000 mm · 236 kg
- **400 kVA cabinet, double column, without power modules** 1,203 × 864 × 2,000 mm · 459 kg
- **500 kVA cabinet, double column, without power modules** 1,203 × 864 × 2,000 mm · 506 kg

Questions

## Questions people ask

#### Which IST6 cabinet sizes are available from 200 to 500 kVA?

Four cabinets with 4, 6, 8 or 10 power modules of 50 kVA. The 200 and 300 kVA are in a single column of 607 × 860 × 2000 mm (224 / 236 kg without modules), 400 and 500 kVA in a double column of 1203 × 864 × 2000 mm (459 / 506 kg). Each 3U power module weighs 39 kg.

#### How efficient is it, and what does THDi ≤ 1.5% mean in practice?

Efficiency reaches 98.1% in double conversion, with ECO and W-ECO modes and redundancy sleep. Input power factor of 0.99 or above and THDi ≤ 1.5% at full load allow smaller upstream cables, transformers and generators.

#### How many UPS can be connected in parallel?

Up to eight UPS, with N+X redundancy between UPS and load sharing within 5%. BSC dual-bus and three-bus layouts are supported, and a 7 m parallel cable is supplied with each UPS.

#### How many batteries does the IST6 200–500 kVA need?

The lead-acid nominal is ±240 V DC with 40 × 12 V blocks; 30 to 50 blocks are accepted, with an output factor of 0.75 at 30 blocks, 0.8 at 32–34, 0.9 at 36–38 and 1 from 40. Lithium runs at ±256 V nominal with 120–200 cells (standard 160) and the BMS card; charging current is up to 30 A per module.

#### Can modules be replaced with the load running?

Yes: the power modules and the five cards of the system control box are hot-swappable, and two control cards back each other up. A module is unlocked, pulled out and replaced while the others keep supplying the load; wait at least 15 minutes before opening a removed module.

#### What installation clearances and cooling does it need?

Leave at least 800 mm at the front, 500 mm at the rear and 500 mm on top, with front-to-rear airflow of 2420 m³/h (200 kVA) up to 6050 m³/h (500 kVA). It works at 0 … 40 °C up to 2000 m on TN-S, TN-C, TN-C-S or TT systems; upstream RCD breakers are not recommended.

#### Which communication options are available?

Modbus, RS232, RS485, two EPO inputs and 4 dry-contact inputs / 3 outputs with programmable functions are standard. Options: SNMP card (Ethernet, SNMP or Modbus), dry-contact expansion to 7 + 5 and a BMS card for lithium batteries.

[All 18 questions](https://www.aecups.com/en/faq/ist6-200-500/)

In the same family: [IST6-120](https://www.aecups.com/en/products/ist6-120/) [IST6 400–1200](https://www.aecups.com/en/products/ist6-400-1200/) [Modular UPS](https://www.aecups.com/en/products/modular-ups/)

References

## Where is the IST6 200–500 installed?

[All projects](https://www.aecups.com/en/projects/)

[**1.2 MW of IST6 modular UPS for an Italian bank's data centre** Banking data centre · Italy (Milan)](https://www.aecups.com/en/projects/#italian-bank-ist6) [**2 MW of IST7, IST6 and IST8 UPS across Saudi Aramco's sites** Oil and gas · Saudi Arabia](https://www.aecups.com/en/projects/#aramco-ist7-ist6-ist8)

Guides

## Guides on the IST6 200–500

[All guides](https://www.aecups.com/en/blog/)

[**Modular UPS: how to grow power module by module** A modular UPS builds power from hot-swappable modules in one cabinet: how it grows with the load, against a conventional UPS, with IST6 examples.](https://www.aecups.com/en/blog/modular-ups/) [**UPS redundancy: N+1 or 2N, and how much a site needs** UPS redundancy explained: what N, N+1, N+X and 2N mean, parallel vs modular UPS, a worked 90 kW example, a comparison table and a checklist.](https://www.aecups.com/en/blog/ups-redundancy-n-plus-1/) [**UPS for data centres: how to choose and plan** A data centre UPS should be online double conversion, sized on measured IT load plus growth. Worked example, rack and modular options, N+1/2N, batteries.](https://www.aecups.com/en/blog/ups-for-data-centres/)

Read next: [Isolation transformer UPS: when you need one](https://www.aecups.com/en/blog/isolation-transformer-ups/) [UPS vs generator: how they differ and work together](https://www.aecups.com/en/blog/ups-and-generator/)

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need for the AEC IST6 200–500 kVA: we answer with the model and the batteries that fit. AEC International sells through distributors in about 80 countries and an agency in every Italian region: ask AEC which one serves your area.

[Contact us](https://www.aecups.com/en/contacts/?interest=Modular%20UPS&msg=About%20the%20AEC%20IST6%20200%E2%80%93500%3A%20%0AQuantity%3A%20#form) [+39 02 9415 8991](tel:+390294158991)
