title: "Three-phase UPS 10–40 kVA, 400 V · IST7 | AEC"
url: https://www.aecups.com/en/products/ist7-10-40/
description: "IST7 10–40 kVA: one model for three-phase or single-phase loads, internal or external batteries, a battery voltage set on site and a touch-screen display."
language: en
---

Three-phase UPS · 400 V

# IST7 10–40 Three-phase UPS, 400 V

VRLA Online double conversion

The AEC IST7 10–40 is a three-phase online double-conversion UPS of 10, 20, 30 and 40 kVA for 400 V supplies, in two frames 250 and 300 mm wide. 3/3, 3/1 and 1/1 (up to 20 kVA) configurations, power factor 1, efficiency up to 96% and 99% in ECO mode, and up to 4 units in parallel.

**96%** efficiency, double conversion

**PF 1** output power factor

**176–280 V** full-power input window

**0.4%** failure rate, 10,000 units

Datasheet Manuals and catalogues [Contact us](https://www.aecups.com/en/contacts/?interest=Three-phase%20UPS&msg=About%20the%20AEC%20IST7%2010%E2%80%9340%3A%20%0AQuantity%3A%20#form)

[**Try 3D** X-ray view](https://www.aecups.com/assets/models3d/ist7-20/v107/)

Drag to turn

In 3D

## Look around the IST7 10–40

Drag it round, swipe on a phone or use the arrow keys. X-ray makes the enclosure see-through, so you can see what sits behind the panels.

[Open full 3D · X-ray](https://www.aecups.com/assets/models3d/ist7-20/v107/)

Pick a size: the turn and the full 3D view follow it. Rendered from AEC's 3D models; the full 3D view zooms in, opens the unit and names every part.

Efficiency

## How efficient is the AEC IST7 10–40 at your load?

AC/AC efficiency of each operating mode against the load: AEC's measured curves where they exist, elsewhere the typical curve derived from the datasheet figure by AEC's method. The losses and their cost follow the curve at the load you choose: drag along the chart or move the slider.

**96** % 50% · Typical curve, derived from the datasheet efficiency of 96% (AEC method)

Filled points: measured by AEC (AC/AC technical datasheet). Hollow points: a typical curve, the shape of the most similar measured curve (same technology and size) moved to the range's datasheet efficiency: η(load) = reference curve + (datasheet figure − its highest point), AEC's method. Dashed lines: one figure without a load (ECO, W-ECO). Between points the efficiency is read on a straight line; beyond them, the nearest end. Losses = P × (1/η − 1).

**Load**: —

**Lost as heat**: —

**Energy lost in a year, 24/7**: —

**Its cost in a year at € per kWh**: —

The catalogue's examples use €0.20 per kWh.

#### Where each figure comes from

| Mode | Efficiency | Kind | Models | Source |
| --- | --- | --- | --- | --- |
| Online, double conversion | 25%: 95.4% · 50%: 96% · 75%: 95.7% · 100%: 95.4% | Typical curve, derived from the datasheet efficiency of 96% (AEC method) | all | AEC datasheet: AC/AC efficiency of the IST6-PM100 100 kW power module (the curve's shape) |
| ECO | 99% | Datasheet figure, load not stated | all |  |

EMEA 2026 catalogue figures: Online, double conversion up to 96% · ECO up to 99%.

The display

## The IST7 10–20 kVA display

The real display, drawn by AEC's own simulator: pick a UPS state (normal, battery, bypass) or a main page.

UPS state

IST7 10–20 kVA · the real display

### Normal operation

**Main pages**

**IST7 20 kVA in 3D, the display** The camera moves in to the display. · 0:06

What is what

## Inside the IST7 10–40, part by part.

Each number on the picture is named in the list.

### Rear · 10–20 kVA

Communication, breakers and wiring terminals on the rear panel, from AEC's 3D model of the 20 kVA (user manual, figure 2-4).

1. **Intelligent slot 2** Optional communication card. While slot 2 is in use, the rear RS485 port (green terminal below, to a PC: A to A(+), B to B(−)) cannot be used.
2. **Parallel port** Two redundant RJ45 ports for the optional parallel kit: up to 4 units, CAN link.
3. **Intelligent slot 1** Optional communication card: SNMP card, dry-contact kit or protocol transfer card.
4. **Dry contact 2: EPO and IN.1** The EPO input must stay closed; opening it shuts down inverter and bypass output. IN.1 is one input with six functions, assigned from the display.
5. **Dry contact 1: OUT.1 … OUT.5** Five relay outputs (NO / NC / COM, 277 Vac / 30 Vdc / 10 A), 13 functions assigned from the display.
6. **External battery port** On the S models (internal batteries) it is live: leave its cover on unless an external battery is connected.
7. **Input breaker** The rectifier's mains supply.
8. **Bypass breaker** The static bypass supply.
9. **Battery breaker** Open it before connecting or disconnecting the battery cables.
10. **Output breaker** To the load.
11. **Maintenance breaker** Behind a cover: removing it opens the gate-controlled switch and the UPS transfers to bypass; then the maintenance breaker feeds the load during service.
12. **Wiring terminals** Input, bypass, output and PE; the layout differs slightly between 3/3, 3/1 and 1/1 mode.

### Rear · 30 kVA

The 30–40 kVA cabinet; the 40 kVA rear differs slightly (user manual, figures 2-5 and 2-6).

1. **Parallel port** For the optional parallel kit.
2. **Intelligent slot 1** Optional SNMP card, dry-contact kit or protocol card.
3. **Intelligent slot 2** Optional card; with it in use, the rear RS485 port cannot be used.
4. **Cooling fans** Keep the vents free and 300 mm clear behind.
5. **Input breaker**
6. **Bypass breaker**
7. **Output breaker** The supply to the loads.
8. **Battery breakers 1 and 2** Open them before working on the battery terminals.
9. **Maintenance breaker** Under its cover plate, with the interlock switch.

### Rear · 40 kVA

1. **Dry contact 1: OUT.1 … OUT.5** Five relay outputs (NO / NC / COM, 277 Vac / 30 Vdc / 10 A), 13 functions assigned from the display.
2. **Parallel port** Two redundant RJ45 ports for the optional parallel kit: up to 4 units, CAN link.
3. **Dry contact 2: EPO and IN.1** The EPO input must stay closed; opening it shuts down inverter and bypass output. IN.1 is one input with six functions, assigned from the display.
4. **Input breaker** The rectifier's mains supply.
5. **RS485** To a PC or a supervisory system (A to A(+), B to B(−)); not usable while intelligent slot 2 is in use.
6. **Intelligent slot 1** Optional communication card: SNMP card, dry-contact kit or protocol transfer card.
7. **Intelligent slot 2** Optional communication card. While slot 2 is in use, the rear RS485 port cannot be used.
8. **Bypass breaker** The static bypass supply.
9. **Output breaker** To the load.
10. **Battery breaker** Open it before connecting or disconnecting the battery cables.
11. **Gate-controlled switch** Opens when the maintenance breaker's cover is removed: the UPS transfers to bypass.
12. **Maintenance breaker** Behind a cover: during service it feeds the load while the UPS is isolated.
13. **Wiring terminals** Input, bypass, output and PE; the layout differs slightly between 3/3, 3/1 and 1/1 mode.
14. **External battery port** On the S models (internal batteries) it is live: leave its cover on unless an external battery is connected.
15. **Mode connector** Only to change the input / output mode (3/3, 3/1, 1/1).
16. **PE** Protective earth.

Overview

## Key facts

**Power range**: 10–40 kVA

**Input / output**: 3/3 · 3/1 · 1/1 · L-N 220 / 230 / 240 V · L-L 380 / 400 / 415 V

**Efficiency**: up to 96% · 99% in ECO mode (single UPS)

**Battery**: ± 96 … ± 240 V DC · ± 144 … ± 240 V DC

**Display**: touch screen

**Communication**: RS485 · dry contacts: EPO, 1 input, 5 outputs

**Network card**: SNMP card (optional)

**Parallel**: up to 4 units with the optional parallel kit

**Warranty**: 3 years

**Dimensions W × D × H**: 250 × 806 × 880 · 300 × 842 × 1250 mm

[Applications](https://www.aecups.com/en/applications/): Servers & data centres Telecom systems Finance & stock Networks Railway Postal services

Pictures

## The IST7 10–40 in pictures

The photos and drawings of the EMEA 2026 catalogue: product views, displays, modules and connections. Tap a picture to enlarge it.

Models

## Which IST7 10–40 fits your load?

Every rating has its own page: that model's technical data, ordering codes, batteries and the questions people ask.

[**IST7-10** 10 kVA The IST7-10 is a 10 kVA / 10 kW online double-conversion UPS in the small IST7 frame, 250 mm wide. **250 × 806 × 880 mm**Size **64 / 95 kg**Weight See the model](https://www.aecups.com/en/products/ist7-10-40/ist7-10k/) [**IST7-20** 20 kVA The IST7-20 is a 20 kVA / 20 kW online double-conversion UPS that keeps the small IST7 frame: 250 × 806 × 880 mm. **250 × 806 × 880 mm**Size **64 / 137.6 kg**Weight See the model](https://www.aecups.com/en/products/ist7-10-40/ist7-20k/) [**IST7-30** 30 kVA The IST7-30 is a 30 kVA / 30 kW online double-conversion UPS in the tall IST7 frame, 300 × 842 × 1250 mm. **300 × 842 × 1250 mm**Size **102.5 / 249.7 kg**Weight See the model](https://www.aecups.com/en/products/ist7-10-40/ist7-30k/) [**IST7-40** 40 kVA The IST7-40 is a 40 kVA / 40 kW online double-conversion UPS, the largest of the IST7 10–40 range, in the 300 × 842 × 1250 mm frame. **300 × 842 × 1250 mm**Size **102.5 / 249.7 kg**Weight See the model](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/)

Datasheet

## Datasheet IST7 10–40.

Every model side by side: keep only what differs, take it as CSV or print it.

**IST7 10–40 · Technical data**

| Model | IST7-10 | IST7-20 | IST7-30 | IST7-40 |
| --- | --- | --- | --- | --- |
| General |  |  |  |  |
| Rated power (kVA / kW) | 10 / 10 | 20 / 20 | 30 / 30 | 40 / 40 |
| Input / output configuration | 3/3 · 3/1 · 1/1 | 3/3 · 3/1 |  |  |
| Input |  |  |  |  |
| Connection | 3 + N + PE (settable 1 + N + PE) | 3 + N + PE |  |  |
| Voltage range | 176–280 V at 100% load · 80–176 V with linear derating |  |  |  |
| Frequency range | 39.5–70.5 Hz |  |  |  |
| Bypass synchronisation range · bypass voltage range | 50 / 60 Hz ± 10% (self-adapting) · 10 / 15 / 20% (default 20%) |  |  |  |
| Power factor · THDi | ≥ 0.99 · ≤ 3% resistive full load, ≤ 5% non-linear full load |  |  |  |
| Battery |  |  |  |  |
| Battery voltage (Vdc) | ± 96 … ± 240 | ± 144 … ± 240 | ± 144 … ± 240 | ± 144 … ± 240 |
| Cells (2 V), settable · default | ± 48 … ± 120 · ± 48 | ± 72 … ± 120 · ± 96 | ± 72 … ± 120 · ± 96 | ± 72 … ± 120 · ± 96 |
| Charge current (A) | 1–10 (default 1) | 1–20 (default 2) |  |  |
| Output |  |  |  |  |
| Connection | 3 + N + PE (settable 1 + N + PE) | 3 + N + PE |  |  |
| Voltage | L-N 220 / 230 / 240 V · L-L 380 / 400 / 415 V |  |  |  |
| Frequency | tracks the bypass; with bypass absent or out of range 50 ± 0.1 or 60 ± 0.1 Hz (default 50) |  |  |  |
| Waveform · power factor | sine wave · 1 (settable 0.9) |  |  |  |
| Voltage distortion (resistive / non-linear) | ≤ 2% / ≤ 4% | ≤ 1% / ≤ 4% |  |  |
| Transfer time inverter ↔ bypass | < 1 ms synchronised · < 10 ms not synchronised |  |  |  |
| Inverter overload (PF 1) | < 105% continuous · 105–110% 60 min · 110–130% 10 min · 130–155% 1 min · 155–200% 200 ms · > 200% immediate |  |  |  |
| Bypass overload | < 130% continuous · 130–155% 1 min · > 155% 200 ms |  |  |  |
| System |  |  |  |  |
| System efficiency | up to 96% · 99% in ECO mode (single UPS) |  |  |  |
| Parallel | up to 4 units with the optional parallel kit |  |  |  |
| Display · communication | touch screen · RS485 · dry contacts: EPO, 1 input, 5 outputs · optional cards: SNMP, protocol transfer, dry-contact kit |  |  |  |
| DC start · alarms | battery start fitted · battery low voltage, mains abnormal, UPS fault, output overload |  |  |  |
| Environment | −5 … 40 °C · 0–95% RH non-condensing · IP20 · noise < 55 dB (25 °C) · up to 2000 m |  |  |  |
| Dimensions W × D × H | 250 × 806 × 880 mm | 300 × 842 × 1250 mm |  |  |
| Weight standard / S | 64 / 95 kg | 64 / 137.6 kg | 102.5 / 249.7 kg | 102.5 / 249.7 kg |

20–40 kVA with ±72 … ±90 cells (24–30 blocks): output 75% of rating. S: with internal battery. IST7-40 T (internal transformer): 222 kg. Outer dimensions in mm: 10–20 kVA width 250 (308 with feet), depth 756 (806 overall), height 802 (880 overall); 30–40 kVA width 300 (358 with feet), depth 787 (842 overall), height 1143 (1250 overall). Ratings are kVA = kW at output PF 1; PF 0.9 settable. Battery voltage and capacity set on the screen at commissioning. Specifications are subject to change without notice.

#### **Full technical details** 19 sections of the EMEA 2026 catalogue: functions, panel, connections, diagrams and ordering codes

### Why IST7 10–40

01 **0.4% · Proven in the field** Failure rate of 0.4% over more than 10,000 IST7 units sold by AEC in the last two years.

02 **3/3 · 3/1 · 1/1 · One UPS, three configurations** Three-phase or single-phase output from the same model; 10–20 kVA also single-phase in and out. Set by wiring, jumpers and screen.

03 **±96…240 V · Battery voltage set on site** From 16 (10 kVA) or 24 (20–40 kVA) up to 40 × 12 V blocks per string (20–40 kVA: full power from 32 blocks, 75% with 24–30): the battery is matched to the site and the budget.

04 **S + BB · Internal and external batteries** The same model with internal batteries (S) also takes an external battery cabinet for longer backup time.

05 **96% · Efficiency up to 96%** System efficiency in double conversion with a three-level inverter; up to 99% in ECO mode (single UPS).

06 **Touch · Touch-screen display** Live topology, measurements, settings and records on the display; five status LEDs and key-pair ON / OFF.

OPERATING COST

## What efficiency means at 32 kW

Losses are the energy the UPS turns into heat: you pay for it once at the meter and again in the room cooling.

- Basis: IST7-40 at 80% load (32 kW), 8,760 h/year, € 0.20/kWh, cooling excluded; losses = P × (1/η − 1). Indicative values.
- In ECO mode the load is fed through the bypass while the bypass is within the set range (single UPS only).

**What efficiency means at 32 kW**

| Mode | Losses | Energy lost / year | Cost / year |
| --- | --- | --- | --- |
| Online double conversion · 96% | 1.33 kW | 11,680 kWh | ≈ € 2,340 |
| ECO mode · 99% | 0.32 kW | 2,830 kWh | ≈ € 570 |

THE RANGE

## Two frames, one family

Four ratings in two cabinets. Display, functions and options are the same: power, size and wiring are what change.

- 10–20 kVA: IST7-10 · IST7-20, 250 × 806 × 880 mm, 3/3 · 3/1 · 1/1
- 30–40 kVA: IST7-30 · IST7-40, 300 × 842 × 1250 mm, 3/3 · 3/1
- 20–40 kVA with ±72 … ±90 cells (24–30 blocks): output limited to 75% of rating.
- Identical on both frames: touch-screen display · efficiency up to 96%, ECO 99% · output PF 1 · input 176–280 V at full load · THDi ≤ 3% (≤ 5% non-linear) · up to 4 in parallel · dry contacts: 5 out, IN.1, EPO · RS485 + 2 slots · IP20, < 55 dB, −5 … 40 °C
- 0.4% failure rate · 10,000+ units sold in 2 years · AEC records

**Two frames, one family**

| Difference | IST7-10 · 20 | IST7-30 · 40 |
| --- | --- | --- |
| Ratings · kVA = kW | 10 · 20 | 30 · 40 |
| Input / output | 3/3 · 3/1 · 1/1 | 3/3 · 3/1 |
| Set on site with | wiring, connector jumpers, screen | wiring, jumpers, screen, mode connector |
| Cabinet W × D × H | 250 × 806 × 880 mm | 300 × 842 × 1250 mm |
| Weight standard / S | 64 / 95 kg (10) · 64 / 137.6 kg (20) | 102.5 / 249.7 kg |
| Internal batteries (S), 12 V 9 Ah | 16 – 40 blocks (10) · 36 or 40 (20) | 2 × 36 or 2 × 40 blocks |
| Battery cells, settable | ±48 … ±120 (10) · ±72 … ±120 (20) | ±72 … ±120 |
| Charge current | 1–10 A, default 1 A | 1–20 A, default 2 A |
| Output distortion, resistive load | ≤ 2% | ≤ 1% |
| Max. input current, 3/3 | 19.5 A (10) · 35.5 A (20) | 65.7 A (30) · 81.7 A (40) |
| Max. battery current | 54.8 A | 82.2 A (30) · 109.6 A (40) |
| Feet | castors | castors and levelling feet |

FLEXIBILITY

## Configuration and battery set on site

Configuration, battery voltage and battery location are chosen on site.

- Input / output configuration set through the wiring, the optional connector jumpers, the screen and, on 30–40 kVA, the mode connector.
- 3/3: three-phase in, three-phase out · 3/1: three-phase in, single-phase out · 1/1: single-phase in and out, 10–20 kVA.
- Number of cells set from the display: ±48 … ±120 cells on 10 kVA, ±72 … ±120 on 20–40 kVA, that is ±96 … ±240 Vdc on 10 kVA and ±144 … ±240 Vdc on 20–40 kVA.
- Capacity 1–2000 Ah and charge current are set on the same page.
- 12 V blocks per string (± half on each side of N): 10 kVA full power from 16 to 40; 20–40 kVA 75% from 24, full power from 32 to 40.
- Standard + external cabinet: no internal batteries, one or more external cabinets sized for the backup time needed (e.g. IST7-20-32X40 · IST7-20 + BB5 with 32 × 12 V 40 Ah).
- S model, internal batteries: batteries inside the UPS cabinet, compact, no extra floor space (e.g. IST7-10-32X9 · 32 × 12 V 9 Ah inside).
- S model + external cabinet: internal batteries plus an external cabinet on the same UPS for longer backup time (e.g. IST7-10-150X9 · 30 inside + 120 in BB5).
- Battery strings with the neutral at the midpoint; with ±72 … ±90 cells, 20–40 kVA output is 75% of rating.

ARCHITECTURE

## Online double conversion, no break to the load

Four operating modes: mains, battery, bypass and maintenance bypass.

- Mains mode: the rectifier/PFC converts the mains to a DC bus; the inverter rebuilds a pure sine wave for the load. The charger charges the battery at the same time.
- Battery mode: when the mains is abnormal the rectifier switches to the battery input and boosts the battery voltage onto the DC bus; the inverter output continues without a break.
- Bypass and maintenance: the static switch transfers the load to the bypass on overload or inverter fault. The maintenance bypass supplies the load while the UPS is de-energised.
- 220 · 230 · 240 V output phase voltage set from the screen (380 / 400 / 415 V line); output voltage adjustment −5 … +5 V.
- 50 / 60 Hz output frequency set from the screen; the UPS self-adapts to a 50 or 60 Hz grid.
- 3 + N + PE input and output; settable to 1 + N + PE on 10–20 kVA.
- Rectifier / PFC (AC → DC): input power factor ≥ 0.99, THDi ≤ 3% at resistive full load; full power from 176 to 280 V; in battery mode it boosts the battery voltage onto the DC bus.
- Inverter (DC → AC): three-level inverter, pure sine wave, output PF 1 (settable 0.9); voltage distortion ≤ 1% (30–40 kVA) or ≤ 2% (10–20 kVA) at resistive full load.
- Charger (DC → DC): charges the battery while the mains is normal, equalising and floating charge, 1–10 A (10–20 kVA) or 1–20 A (30–40 kVA) settable.
- Static switch (bypass): transfers the load to the bypass on overload or fault, < 1 ms synchronised, < 10 ms not synchronised; maintenance bypass for service.

DESIGN AND INSTALLATION

## Front, rear and footprint

Rear panel with communication, breakers and wiring terminals; the 30–40 kVA has the same functions in the taller cabinet.

- Rear panel: 1 intelligent slot 2 (optional communication card) · 2 parallel port (optional parallel kit) · 3 intelligent slot 1 (optional communication card) · 4 RS485 · 5 dry contact 2 (EPO and IN.1) · 6 dry contact 1 (OUT.1 … OUT.5)
- 7 input breaker · 8 external battery port · 9 bypass breaker · 10 battery breaker · 11 output breaker · 12 gate-controlled switch (releases when the maintenance breaker cover is removed) · 13 maintenance breaker (behind a cover) · 14 wiring terminals: input, bypass, output, PE
- Installation: IP20, on a flat floor without vibration, gradient < 5°.
- Operating temperature −5 … 40 °C (recommended 20–25 °C), humidity 0–95% non-condensing.
- Noise < 55 dB (25 °C).
- Up to 2000 m; above, derating to [IEC 62040-3](https://webstore.iec.ch/en/publication/60140).
- Free space: 300 mm minimum from the rear panel to the wall or other equipment; 300–500 mm at the rear and sides for ventilation.
- Standard: without internal battery. S: with internal battery. IST7-40 T (internal transformer): 222 kg.

**Front, rear and footprint**

| Model | W × D × H (mm) | Standard | S |
| --- | --- | --- | --- |
| IST7-10 | 250 × 806 × 880 | 64 kg | 95 kg |
| IST7-20 | 250 × 806 × 880 | 64 kg | 137.6 kg |
| IST7-30 | 300 × 842 × 1250 | 102.5 kg | 249.7 kg |
| IST7-40 | 300 × 842 × 1250 | 102.5 kg | 249.7 kg |

TECHNOLOGY

## Three-level inverter, fully digital control

Three-level inverter technology with PFC control: clean output voltage wave and system efficiency up to 96%. The output page shows voltage, current, power, load and frequency live.

- Wide input window: full power from 176 to 280 V input; from 176 V down to 80 V the rated power decreases linearly (scale 0–300 V).
- At low load the battery does not discharge while the mains is above 80 V, so it stays fully charged.
- ≤ 1% output voltage distortion at resistive full load, 30–40 kVA (≤ 2% on 10–20 kVA); ≤ 4% at non-linear full load.
- Input frequency range 39.5–70.5 Hz.
- Transfer inverter ↔ bypass < 1 ms synchronised (< 10 ms not synchronised).
- Inverter overload, output PF 1: 105% continuous · 110% 60 min · 130% 10 min · 155% 1 min · 200% 200 ms · > 200% immediate protection.
- With PF 0.9: < 105% continuous · 115–130% 15 min · 130–155% 1 min · 155–200% 200 ms.
- Bypass overload: 130% continuous · 155% 1 min · > 155% 200 ms.
- Cooling that adapts: fan speed adjusted automatically to the load, extending fan life and reducing noise; Standard and Timing dedusting; the screen can show the operating time of fans and bus capacitors.
- Protections: battery under-voltage, overload and short-circuit, over-temperature, input over-voltage, communication abnormal.

TOUCH SCREEN AND PANEL

## Everything at hand, on one screen

Colour touch screen with live topology, five status LEDs with symbols and key-pair controls: the IST7 is read and set from the front, with two access levels.

- 1 Colour touch screen: live topology, measurements, settings and records.
- 2 Five status LEDs: AC/DC · DC/AC · BYP. · BATT. LOW · OVERLOAD, each with its symbol; green normal, red abnormal.
- 3 ON key pair: press both keys until the beep and the UPS powers on; no accidental switching.
- 4 OFF key pair: press both keys for 3 s and the UPS powers off.
- 5 EPO: emergency power off, the output is cut at once.
- 6 BATT. Start, below the panel: hold 7 s, then ON to start from the battery without mains.
- Live topology: moving lights trace the active power path and an abnormal block turns red; touch bypass, mains, battery or output to open its page.
- Bypass and mains pages: phase voltage, current, frequency · battery page: voltage, current, remaining capacity and time · output page: voltage, current, kW, kVA, load, PF, Hz.
- Information: run info, history record, user log, device info · Settings (administrator): system, battery, battery test, dry contacts, HMI, password, device config, dedust, records.
- Access: user reads parameters; administrator reads and sets them. Every setting shows ✓ saved or ✕ not saved.

Tap a light: green is normal operation, red an abnormal state, as in the catalogue's table.

AC/DC: green, rectifier normal

**Everything at hand, on one screen**

| LED | Green | Red |
| --- | --- | --- |
| AC/DC | rectifier normal | rectifier abnormal |
| DC/AC | inverter normal | inverter abnormal |
| BYP. | bypass output | bypass abnormal |
| BATT. LOW | — | battery low voltage |
| OVERLOAD | — | overload or overload protection |

SMART FUNCTIONS

## Functions that look after the load, the battery and the site

Frequency converter, self-start, bypass disable, test load and impact load mode are set by the administrator on the device configuration pages; dedusting is started as standard, on a timer or cancelled from the dedust page.

- ECO mode, up to 99% (single UPS): the load runs on the bypass while it is within range (voltage 10 / 15%, frequency 5 / 10%) and moves to the inverter when it is not.
- Low mains input, battery kept at 100%: at low load the battery does not discharge while the mains is above 80 V; all power comes from the grid, fewer discharge cycles.
- Smart fan speed follows the load: longer fan life and less noise; dedusting standard or on a timer.
- Grid self-adaption, 50 / 60 Hz: the UPS monitors the grid frequency and adapts to 50 or 60 Hz on its own.
- Frequency converter, 50 ↔ 60 Hz: on / off from the screen, output frequency 50 or 60 Hz.
- Self-start at power on, three choices: “UPS will not turn off”, on or off, chosen in the device configuration.
- Bypass disable, always or on short circuit: the bypass can be disabled, or disabled only when the output is short-circuited.
- Short-circuit time, 10–200 ms: short-circuit duration time set by the administrator.
- Impact load mode, on / off: mode setting in the device configuration pages.
- Test load function, 10–100%: on / off, with the test load rate set from 10 to 100%.
- Component time: operating time of fans and bus capacitors shown on the screen (on / off).
- Battery start without mains: hold BATT. Start for 7 s, then the ON key pair; the UPS starts from the battery.

OPERATION AND RECORDS

## Every state handled, every event recorded

Transfers are automatic, maintenance does not stop the load, and every fault and operation is stored with its time.

- No break, mains → battery: the rectifier moves to the battery input at once.
- < 1 ms inverter ↔ bypass, synchronised (< 10 ms not synchronised).
- Auto: back to mains mode when the mains recovers.
- 5×: same fault more than 5 times in a short time and the UPS stays on bypass.
- ECO mode, up to 99%, single UPS only: while the bypass is within the set range the load is fed through the bypass; when it is not, the load moves to the inverter.
- Maintenance without interruption: built-in maintenance bypass with a gate-controlled switch; the load stays supplied while the UPS is serviced.
- 01 Remove the cover: removing the maintenance breaker cover releases the gate-controlled switch · 02 Inverter off, load on bypass: the UPS turns off the inverter and moves the load to bypass by itself.
- 03 Maintenance breaker on, then input, bypass and output breakers off: no voltage inside the UPS · 04 Back to normal: breakers on, maintenance breaker off when the bypass voltage shows, cover refitted, ON.
- End of backup time: mains lost (battery mode, no break) → alarm (sound and light) → low-voltage point (the UPS stops) → ≈ 1 min (complete shutdown) → mains back (automatic restart). The battery is never left to discharge slowly.
- History record: faults and alarms by time, newest first · user log: operations and setting changes · current fault: active faults, from the fault icon · USB export: history and user log to a USB drive.

PLANNING · THREE-PHASE IN AND OUT 3/3

## Ready for the site, cables and breakers sized

Reference values from the user manual for the electrical design: maximum steady-state currents, recommended breakers and cable sections.

- Maximum steady-state phase currents; breakers rated 250 Vac / 250 Vdc; cable sections for about 5 m at 25 °C. Bypass input as AC input.
- Input breaker: 1.5 to 2 times the maximum input current, for charging and inrush; no leakage protection; double-pole disconnection with feedback recommended.
- Long cables: sections are for about 5 m. Above 20 m increase the section; above 25 mm² use two cables in parallel.
- Battery side: DC breaker rated at least 250 Vdc. External cabinets: one 3P breaker, wiring BATT.+, BATT.− and BATT. N.
- 01 Transport by forklift or pallet truck, centre of gravity on the forks, always upright · 02 Unpack: front plate down as a ramp; two people slide the UPS to the floor.
- 03 Fix: pedestal brackets to the floor, 4 × φ10 holes, M8 expansion bolts · 04 Wire and set: rear terminals; work configuration set on the screen before the bypass breaker is closed.
- 10–20 kVA stand on castors; 30–40 kVA also have levelling feet. Clearance: at least 300 mm behind the rear panel.

**Ready for the site, cables and breakers sized**

| Model | AC input (A) | AC output (A) | Battery (A) | Input · output breaker | Battery breaker | AC cables (mm²) | Battery (mm²) | PE (mm²) |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
| IST7-10 | 19.5 | 15.2 | 54.8 | 32 A 3P | 100 A 3P | 4 | 10 | 4 |
| IST7-20 | 35.5 | 30.3 | 54.8 | 63 A 3P | 100 A 3P | 6 | 10 | 6 |
| IST7-30 | 65.7 | 45.5 | 82.2 | 100 A 3P | 125 A 3P | 16 | 2 × 10 | 16 |
| IST7-40 | 81.7 | 60.6 | 109.6 | 100 A 3P | 175 A 3P | 16 | 2 × 10 | 16 |

PLANNING · SINGLE-PHASE OUTPUT 3/1 AND 1/1

## Single-phase output · 3/1 and 1/1

Single-phase bypass and output carry up to three times the phase current: neutral and output cables are larger.

- Input breaker and input live cable as 3/3.
- 1/1 on 10–20 kVA: input 58.6 A (10) and 106.4 A (20), cables 16 and 25 mm².

**Single-phase output · 3/1 and 1/1**

| Model | AC input (A) (3/1) | Bypass input (A) | AC output (A) | Bypass · output breaker | N, bypass, output (mm²) | PE (mm²) |
| --- | --- | --- | --- | --- | --- | --- |
| IST7-10 | 19.5 | 58.6 | 45.6 | 80 A 1P · 80 A 1P | 16 | 2 × 10 |
| IST7-20 | 35.5 | 106.4 | 90.9 | 100 A 3P · 100 A 3P | 25 | 2 × 10 |
| IST7-30 | 65.7 | 197.1 | 136.4 | 250 A 1P · 200 A 1P | 2 × 25 | 25 |
| IST7-40 | 81.7 | 245.0 | 181.8 | 300 A 1P · 250 A 1P | 2 × 25 | 25 |

PARALLEL SYSTEMS

## Up to four units, redundant or expand

The standard UPS is a single unit. The optional parallel kit is a built-in card for CAN communication between the units: it is installed in the parallel port with the UPS off, then the parallel mode is set from the screen.

- Up to 4 units (ID 1–4) on a common input/bypass and load bus, linked by two RJ45 parallel cables in a ring.
- Two links, one backs up the other: the two RJ45 parallel ports are identical and redundant; the UPS raises an alarm if one of them is not connected.
- N+1 redundancy: the total output is kept within N times the rating of one UPS; a faulty unit can leave or rejoin the system without affecting the load. Above that limit each unit raises an alarm: with two units in redundancy, when each carries more than 50% of its rating.
- Shared battery: units in parallel can share battery groups; each UPS must have the same battery amount and the same battery parameters.
- Same wiring: wiring and phase sequence must be strictly the same on every unit, so the bypass of the system is in phase.
- ECO and parallel: ECO mode is for a single UPS. Start, shutdown and exit of one unit follow the parallel procedures in the manual.

**Up to four units, redundant or expand**

| Item | Settable value |
| --- | --- |
| Parallel mode | Redundant, Single, Expand, BSC |
| Parallel UPS ID | 1–4 |
| Work configuration | 3/3, 3/1 (10–20 kVA also 1/1) |

BATTERIES

## Battery groups, charging and end-of-discharge protection

Positive and negative battery groups with the neutral at the midpoint. Default 10 kVA: ±48 cells; 20–40 kVA: ±96 cells. With ±72 to ±90 cells, 20–40 kVA output is reduced to 75% of the rating.

- 12 V blocks per string (± half on each side of N): 10 kVA full power from 16 to 40; 20–40 kVA 75% from 24, full power from 32 to 40.
- 10 A max. charge current, 10–20 kVA (default 1 A); 20 A max. charge current, 30–40 kVA (default 2 A).
- Equalising and floating charge; battery remaining capacity and time on screen.
- External battery to extend the backup time of S models; required on standard models.
- Battery test: standard test or deep test, started and cancelled from the screen; the page shows test status, battery current, consumed capacity and test time.
- 10 h first charge of internal batteries before use; the UPS can be used meanwhile.
- Every 4–6 months one full discharge and recharge (every 2 months in hot areas).
- Every 3 months a recharge of more than 10 h if the UPS is not used.
- 3–5 years typical battery life, depending on temperature and discharges.
- Battery replacement by authorised personnel only. Batteries of one string must be of the same type, model and manufacturer.

**Battery groups, charging and end-of-discharge protection**

| Battery management setting | Value |
| --- | --- |
| Battery type | Lead-acid |
| Battery capacity | 1–2000 Ah |
| Battery amount (2 V cells) | ±48 … ±120 (10 kVA) · ±72 … ±120 (20–40 kVA) |
| Equalising charge voltage | 2.083–2.417 V/cell |
| Floating charge voltage | 2.083–2.333 V/cell |
| Low-voltage protection | 1.667–1.867 V/cell |
| Test ending voltage | 1.667–1.867 V/cell |
| Temperature compensation | On / off, 0–5.0 mV/°C |
| Charge current | 1–10 A (10–20 kVA) · 1–20 A (30–40 kVA) |

BATTERY CABINETS

## BB5 to BB8, matched to every IST7

Steel cabinets for 12 V VRLA AGM batteries, supplied empty or complete with batteries, fuses and cables. Every configuration has its own AEC wiring diagram.

- BB5: 460 × 800 × 1400 mm, 110 kg empty · BB6: 800 × 800 × 1400 mm, 140 kg empty · BB7: 800 × 800 × 1900 mm, 160 kg empty · BB8: 1400 × 800 × 1900 mm, 250 kg empty.
- UPS for comparison: IST7-10…20 250 × 806 × 880 mm, 64–137.6 kg · IST7-30…40 300 × 842 × 1250 mm, 102.5–249.7 kg.
- Batteries per cabinet × capacity of each 12 V block. One cabinet holds one or more strings with the neutral at the midpoint (e.g. 60 = 2 × 30 blocks). On 20–40 kVA, strings of 24–30 blocks (±72 … ±90 cells) limit the output to 75% of rating; full power from 32 blocks.
- Battery connection: IST7-10 54.8 A, 10 mm², 100 A 3P · IST7-20 54.8 A, 10 mm², 100 A 3P · IST7-30 82.2 A, 2 × 10 mm², 125 A 3P · IST7-40 109.6 A, 2 × 10 mm², 175 A 3P (max. steady-state DC input current, +/N/− cable cross-section for about 5 m, DC breaker 250 Vdc).
- In every cabinet: 3-pole DC switch-disconnector Q1 with DC fuses; RAL 9005, IP20 (IP21–IP44 on request).
- Options: forced ventilation, Q1 auxiliary contact, internal and external cables.
- [IEC/EN 62040-1](https://webstore.iec.ch/en/publication/80573) · [EN IEC 62485-2](https://webstore.iec.ch/en/publication/7091) · CE; wiring diagram, commissioning record and battery log supplied; 3-year warranty on the cabinet.
- Order as one code: IST7-20-32X40 = IST7-20 + BB5 with 32 × 12 V 40 Ah.

**BB5 to BB8, matched to every IST7**

| UPS | BB5 | BB6 | BB7 | BB8 |
| --- | --- | --- | --- | --- |
| IST7-10 · 20 | 30–40 × 24 Ah · 30–38 × 40 Ah | 30–36 × 60 Ah | 30–36 × 80 / 100 Ah | 40 / 60 × 80 / 100 Ah |
| IST7-30 · 40 | 36–40 × 24 Ah · 30–38 × 40 Ah | 30–36 × 60 Ah | 30–36 × 80 / 100 Ah | 40 / 60 × 80 / 100 Ah |

CONNECTIVITY

## Two intelligent slots, RS485, two dry-contact blocks

Rear communication area with two intelligent slots, parallel port, RS485 and two dry-contact blocks; the 30–40 kVA has the same ports at the top of its rear panel.

- 1 intelligent slot 2: optional card · 2 parallel port: two RJ45 (parallel kit) · 3 intelligent slot 1: optional card · 4 RS485 · 5 dry contact 2: EPO and IN.1 · 6 dry contact 1: OUT.1 … OUT.5
- RS485 to PC: A to A(+), B to B(−); the rear RS485 port cannot be used when slot 2 is in use.
- Relay contacts 277 Vac / 30 Vdc / 10 A.
- EPO input must be closed for normal operation; opening it shuts down inverter and bypass output.
- 1 input + EPO · 6 functions: IN.1 assigned from the display, NC or NO, default charge forbidden; functions: charge disabled, external MBB on, external BB status, UPS remote ON/OFF, batt. ground fault, discharge disabled.
- 5 outputs (NO / NC / COM) · 13 functions, each assigned from the display (defaults: mains, bypass, battery, output abnormal, overload): mains abnormal, bypass abnormal, battery abnormal, output abnormal, overload abnormal, general abnormal, normal operation, battery operation, bypass operation, UPS ON/OFF status, battery low, ECO mode, fan fault.
- Options: SNMP card (built-in, protocol configured through the web page) · dry-contact kit (3 outputs: mains, battery, inverter (or bypass) status; 2 inputs: battery temperature, battery breaker (or remote ON/OFF)) · protocol transfer card (RS485 reserved for lithium battery communication, RS485 + RS232 on DB9) · parallel kit (built-in card with parallel cables, CAN communication).

AEC SERVICE

## Survey, installation, commissioning, maintenance

AEC engineers size, install, commission and maintain the IST7. The UPS keeps its own records, and AEC service works from them.

- 24/7 technical assistance by phone and WhatsApp, also on non-working days.
- < 30 min WhatsApp reply to technical and commercial questions.
- 3 years warranty, extendable with a maintenance contract.
- 21+ countries with spare parts in stock across the Allis Electric group.
- 01 Consulting and sizing: feasibility study and design for critical sites; UPS, battery and parallel system sized by the AEC engineering team (IST7: two cabinets, 10 to 40 kVA; 3/3, 3/1; 1/1 on 10–20 kVA).
- 02 Survey and installation: site survey, positioning and cabling of the UPS and the battery cabinets by AEC technicians (IST7: rear terminals; ≥ 300 mm free at the rear).
- 03 Commissioning: commissioning and verification of every value and parameter, access levels and dry-contact functions (IST7: settings protected by administrator login).
- 04 Maintenance: programmes and contracts written for each site, battery checks and replacement, generator tests (IST7: fan and capacitor operating time; battery test from the screen).
- 05 Assistance 24/7: call centre 24 hours a day, 7 days a week, by phone and WhatsApp, with an engineer on site when needed (IST7: history record and user log exported to USB).
- 06 Expansion: new units in parallel and battery extensions, configured by AEC service (IST7: up to 4 units with the parallel kit).
- Contact: service@aecups.com · +39 393 080 5211 · www.aecups.com · Via Nerviano 55, 20045 Lainate (MI), Italy.

ORDERING GUIDE

## One code for the UPS and its batteries

Every IST7 is ordered with one code: the rating, then the number and capacity of the 12 V batteries, inside the UPS or in an AEC battery cabinet.

- Code structure: IST7 (series) -20 (rating, kVA) -36 (number of 12 V blocks) X9 (capacity of each block, Ah).
- Number of 12 V blocks available in each code; strings with the neutral at the midpoint; several strings share a cabinet (e.g. 60 = 2 × 30); ranges in steps of 2 blocks.
- \* With 30-block strings (±90 cells) the output of 20–40 kVA is limited to 75% of rating; full power from 32 blocks. 10 kVA works at full power from 16 blocks.
- Standard (IST7-10 … 40): external batteries only. S (internal 9 Ah): compact, and it still accepts a BB5 for longer backup time. Same cabinet size.
- Sized by AEC: tell us the load and the backup time; AEC chooses the code, the battery cabinet and the cables, and supplies the wiring diagram.
- Options: parallel kit (built-in card with parallel cables, CAN communication, up to 4 units) · SNMP card (network monitoring in an intelligent slot, configured through its web page) · dry-contact kit (3 outputs and 2 inputs in an intelligent slot) · protocol transfer card (RS485 + RS232 on DB9; RS485 reserved for lithium battery communication).

**One code for the UPS and its batteries**

| Battery | Cabinet | IST7-10 | IST7-20 | IST7-30 | IST7-40 |
| --- | --- | --- | --- | --- | --- |
| Internal 9 Ah · S | — | 16 · 24 · 30 · 32 · 36 · 40 | 36 · 40 | 72 · 80 (2 strings) | 72 · 80 (2 strings) |
| Internal 9 Ah + BB5 | BB5 | 150 · 160 | 150\* · 160 | 200 | 200 |
| 24 Ah | BB5 | 30 – 40 | 30\* · 32 – 40 | 36 · 38 · 40 | 36 · 38 · 40 |
| 40 Ah | BB5 | 30 – 38 | 30\* · 32 – 38 | 30\* · 32 – 38 | 30\* · 32 – 38 |
| 60 Ah | BB6 | 30 – 36 | 30\* · 32 – 36 | 30\* · 32 – 36 | 30\* · 32 – 36 |
| 80 Ah · 100 Ah | BB7 | 30 – 36 | 30\* · 32 – 36 | 30\* · 32 – 36 | 30\* · 32 – 36 |
| 80 Ah · 100 Ah | BB8 | 40 · 60 | 40 · 60\* | 40 · 60\* | 40 · 60\* |

### Ordering codes IST7 10–40

| Code | Description |
| --- | --- |
| `IST7-10 · IST7-20 · IST7-30 · IST7-40` | Standard models, external batteries only (e.g. IST7-30: 30 kVA, external batteries). |
| `IST7-20-36X9` | 20 kVA, 36 × 9 Ah inside. |
| `IST7-10-32X9` | 10 kVA S model, 32 × 12 V 9 Ah inside. |
| `IST7-10-150X9` | 10 kVA, 30 × 9 Ah inside + 120 in BB5. |
| `IST7-20-32X40` | IST7-20 + BB5 with 32 × 12 V 40 Ah. |
| `IST7-40-34X60` | 40 kVA + BB6, 34 × 60 Ah. |
| Parallel kit | Option: built-in card with parallel cables, CAN communication, up to 4 units. |
| SNMP card | Option: network monitoring in an intelligent slot, configured through its web page. |
| Dry-contact kit | Option: 3 outputs and 2 inputs in an intelligent slot. |
| Protocol transfer card | Option: RS485 + RS232 on DB9; RS485 reserved for lithium battery communication. |

Diagrams

## The IST7 10–40, in diagrams

The path of the power, the ratings, the footprints and the losses, drawn from the figures of the EMEA 2026 catalogue.

### How the power flows

Pick an operating mode: the path the power takes to the load lights up.

**Normal.** Double conversion: the rectifier feeds the DC bus, the inverter rebuilds a clean voltage and the load always runs on the inverter. The battery stays on charge. Efficiency up to 96% (ECO: single UPS).

### The ratings

Every model in the range, in proportion to its power.

1. IST7-10 **10 kVA · 10 kW**
2. IST7-20 **20 kVA · 20 kW**
3. IST7-30 **30 kVA · 30 kW**
4. IST7-40 **40 kVA · 40 kW**

### Losses per 100 kW of load

Worked out as P × (1/η − 1) at the stated maximum efficiency, with the load steady all year. ECO: single UPS.

1. Double conversion 96% **4.17 kW36,500 kWh/year**
2. ECO 99% **1.01 kW8,850 kWh/year**

### Phase configurations

Input / output: three-phase (3) or single-phase (1). 1/1 on 10–20 kVA only.

**3/3** 3~ → 3~

**3/1** 3~ → 1~

**1/1** 1~ → 1~

**In parallel** Up to 4 units on the same load, for redundancy or for more power.

### Footprints to scale

Front view of the cabinets, all at the same scale, beside a 2 m rule. W × D × H, mm.

- **10–20 kVA (standard / S)** 250 × 806 × 880 mm · 64 / 95 kg (10) · 64 / 137.6 kg (20)
- **30–40 kVA (standard / S)** 300 × 842 × 1,250 mm · 102.5 / 249.7 kg

Questions

## Questions people ask

#### What battery options does the IST7 10–40 kVA have?

Standard models take external batteries only; S models have internal 12 V 9 Ah batteries in the same cabinet size and still accept a BB5 cabinet for longer backup time. External BB5 to BB8 cabinets take 24 to 100 Ah batteries, and AEC chooses the code, cabinet and cables from your load and backup time.

#### How many batteries does the IST7 10–40 kVA need?

The battery voltage is set on site: the 10 kVA runs at full power from 16 to 40 × 12 V blocks per string; the 20–40 kVA at full power from 32 to 40 blocks, and at 75% of rating with 24–30 blocks. Typical battery life is 3–5 years, depending on temperature and discharges.

#### Can the IST7 10–40 kVA supply single-phase loads?

Yes: every model works in 3/3 or 3/1, and the 10–20 kVA models also in 1/1. The configuration is set through the wiring, connector jumpers and the screen (plus the mode connector on 30–40 kVA).

#### Can several IST7 10–40 kVA units run in parallel?

Yes, up to 4 units, with the optional parallel kit (built-in card, CAN communication, two redundant RJ45 ports), in redundant or capacity (expand) mode. In N+1 redundancy a faulty unit can leave or rejoin without affecting the load, and units can share battery groups with the same battery amount and parameters.

#### What are the IST7 10–40 kVA dimensions and weights?

The 10–20 kVA cabinet measures 250 × 806 × 880 mm (64 kg standard; 95 / 137.6 kg S), the 30–40 kVA 300 × 842 × 1250 mm (102.5 kg standard, 249.7 kg S). Leave at least 300 mm from the rear panel to the wall and 300–500 mm at the rear and sides for ventilation.

#### Which communication and monitoring options are available?

Standard: RS485, two intelligent slots, EPO, one programmable input and five programmable relay outputs, and USB export of the records. Options: SNMP card, dry-contact kit, protocol transfer card for lithium battery communication and the parallel kit.

#### How efficient is the IST7 10–40 kVA, and what is the warranty?

System efficiency reaches 96% in double conversion and 99% in ECO mode (single UPS). The warranty is 3 years, extendable with a maintenance contract.

[All 22 questions](https://www.aecups.com/en/faq/ist7-10-40/)

In the same family: [All-in-One](https://www.aecups.com/en/products/all-in-one/) [IST9](https://www.aecups.com/en/products/ist9/) [IST7 60–200](https://www.aecups.com/en/products/ist7-60-200/) [IST7-T](https://www.aecups.com/en/products/ist7-t/) [Three-phase UPS](https://www.aecups.com/en/products/three-phase-ups/)

References

## Where is the IST7 10–40 installed?

[All projects](https://www.aecups.com/en/projects/)

[**Four IST7 20 kW UPS in parallel backing up the lighting circuits of IBM's Italian headquarters** Offices (lighting backup) · Italy](https://www.aecups.com/en/projects/#ibm-italy-ist7-parallel) [**Over 1,000 sets of IST8 lithium and IST7 UPS in ExxonMobil's Italian service stations** Fuel service stations · Italy](https://www.aecups.com/en/projects/#exxonmobil-italy-ist7-ist8) [**1.65 MW of IST7 UPS for regional airports in Saudi Arabia** Airports · Saudi Arabia](https://www.aecups.com/en/projects/#saudi-airports-ist7)

Guides

## Guides on the IST7 10–40

[All guides](https://www.aecups.com/en/blog/)

[**Single- or three-phase UPS: which does your site need?** Single-phase or three-phase UPS? Where the line falls in kVA and amps, what the supply and the loads decide, a 12 kW worked example and a checklist.](https://www.aecups.com/en/blog/single-vs-three-phase-ups/) [**Three-phase UPS: configurations, sizing and installation** A three-phase UPS protects 400 V loads from about 10 kVA up. 3/3 against 3/1, phase balancing, sizing from measured currents, and installation.](https://www.aecups.com/en/blog/three-phase-ups/) [**UPS heat output: BTU, cooling and room temperature** UPS heat output equals its losses: load × (1/efficiency − 1), then × 3.412 for BTU/h. Worked example, battery room temperature, clearances and checklist.](https://www.aecups.com/en/blog/ups-heat-output-cooling/)

Read next: [UPS datasheet explained: every line, with examples](https://www.aecups.com/en/blog/how-to-read-a-ups-datasheet/) [UPS glossary: 87 UPS terms and acronyms explained](https://www.aecups.com/en/blog/ups-glossary/) [UPS sizing: how to work out the power you need](https://www.aecups.com/en/blog/ups-sizing/)

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need for the AEC IST7 10–40 kVA: we answer with the model and the batteries that fit. AEC International sells through distributors in about 80 countries and an agency in every Italian region: ask AEC which one serves your area.

[Contact us](https://www.aecups.com/en/contacts/?interest=Three-phase%20UPS&msg=About%20the%20AEC%20IST7%2010%E2%80%9340%3A%20%0AQuantity%3A%20#form) [+39 02 9415 8991](tel:+390294158991)