title: "Three-phase online UPS 200 kVA, 400 V · IST7-200 | AEC"
url: https://www.aecups.com/en/products/ist7-60-200/ist7-200k/
description: "The IST7-200 is a 200 kVA / 200 kW three-phase online double-conversion UPS, the largest IST7, with two power units."
language: en
---

IST7 60–200 · Three-phase UPS

# IST7-200 Three-phase online UPS 200 kVA, 400 V

VRLA 200 kVA three-phase online UPS, 400 V

The IST7-200 is a 200 kVA / 200 kW three-phase online double-conversion UPS, the largest IST7, with two power units in a 600 × 1000 × 1600 mm cabinet of 296 kg. For data centres, hospitals and industry with 160 to 200 kW per unit, or up to 1.6 MW with eight units in parallel.

**200 kVA / 200 kW** Rating

**600 × 1000 × 1600 mm** W × D × H

**296 kg** Weight

**±216 V** Battery

Technical data [Catalogue (PDF)](https://www.aecups.com/docs/AEC_UPS_Catalogue_EMEA_2026.pdf#page=80) [Contact us](https://www.aecups.com/en/contacts/?interest=Three-phase%20UPS&msg=About%20the%20AEC%20IST7-200%20(IST7%2060%E2%80%93200)%3A%20%0AQuantity%3A%20#form)

[**Try 3D** X-ray view](https://www.aecups.com/assets/models3d/ist7-200/v75/)

Quick answers

## IST7-200: quick answers

**What it is**: The IST7-200 is a 200 kVA / 200 kW three-phase online double-conversion UPS, the largest IST7, with two power units in a 600 × 1000 × 1600 mm cabinet of 296 kg.

**Who it is for**: For data centres, hospitals and industry with 160 to 200 kW per unit, or up to 1.6 MW with eight units in parallel.

**Supply and configuration**: 3 phases + N + PE · 220 / 230 / 240 V L-N · 380 / 400 / 415 V L-L

**Battery and backup**: ±216 V

**Size and weight**: 600 × 1000 × 1600 mm · 296 kg

**Ordering code**: IST7-200

IST7 60–200

## What sets apart the IST7-200

Eight IST7-200 in parallel make 1.6 MW, the ceiling of the range, in capacity or N+X redundant systems; BSC synchronisation links two independent systems for dual-bus loads. Each unit draws up to 558 A from the battery (482 A nominal) on 95 mm² cables, and the catalogue pairs it only with BB8 cabinets, one or two.

Like every IST7 60–200 it reaches 96.5% peak efficiency in double conversion and 99% in ECO, with a PFC rectifier (THDi ≤ 3%) that keeps the upstream transformer and generator lightly stressed. Generator mode limits the charge power while on a genset.

- **Against the IST7-160** (one size down): Rated power 200 kVA / 200 kW against 160 kVA / 160 kW; Weight 296 kg against 294 kg.

Planning data

## IST7-200: currents, breakers, cables, batteries

The rows and columns of the EMEA 2026 catalogue's and AEC manuals' tables that concern the IST7-200.

### Front, rear and footprint

**IST7-200 · Front, rear and footprint**

| Model | W × D × H (mm) | Weight |
| --- | --- | --- |
| IST7-200 | 600 × 1000 × 1600 | 296 kg |

### BB5 to BB8, matched to every IST7

**IST7-200 · BB5 to BB8, matched to every IST7**

| UPS | IST7-200 |
| --- | --- |
| BB5 | — |
| BB6 | — |
| BB7 | — |
| BB8 | 60 / 64 × 80 / 100 Ah |
| 2 × BB8 | 120 / 128 × 80 / 100 Ah |

### Battery connection by UPS model

**IST7-200 · Battery connection by UPS model**

| UPS | IST7-200 |
| --- | --- |
| I nom. (A) | 482 |
| I max. (A) | 558 |
| +/N/− mm² | 95 |
| PE mm² | 70 |

Installation

## Installing the IST7-200: space, heat, cables

Each figure with its source. Heat is the power lost at the peak efficiency stated.

**IST7-200 · installation**

| Item | Figure | Source |
| --- | --- | --- |
| Clearances | front 800 mm, rear 800 mm, left 800 mm, right 800 mm, top 800 mm | AEC IST7 60–200 user manual p.35 §3.2.3 |
| Cable entry | Bottom, through the base | AEC IST7 60–200 user manual |
| Cooling air | 2,420 m³/h | EMEA 2026 catalogue p.157 |
| Heat at full load | 7.25 kW at 200 kW load, 96.5 % efficiency | AEC IST7 60–200 user manual p.87 §A; output PF 1 (EMEA 2026 catalogue) |
| Operating temperature | −5 to 40 °C, best 20–30 °C | AEC IST7 60–200 user manual p.34–35 §3.2.2 |
| Switches and terminals | Mains, bypass, output and maintenance bypass switches behind the lockable front door; terminals behind the front and rear wiring covers. | AEC IST7 60–200 user manual p.13 Fig. 2-2/2-3 (handle on the left edge) |
| Door | One leaf, hinged on the right | AEC IST7 60–200 user manual p.13 Fig. 2-2/2-3 (handle on the left edge) |

Size and floor

## How big it is

600 × 1000 × 1600 mm · 296 kg.

**0.6 m²** footprint

**493 kg/m²** floor load

**1.6 m** height

Floor load = weight ÷ footprint (296 kg).

Efficiency

## How efficient is the AEC IST7-200 at your load?

IST7-200, 200 kW at its rating, online, double conversion (typical curve, AEC's method). Heat to remove on this curve: 25%: 2.14 kW (η 95.9%) · 50%: 3.63 kW (η 96.5%) · 75%: 5.93 kW (η 96.2%) · 100%: 8.55 kW (η 95.9%). At 50% load, 24/7, it loses about 31,772 kWh a year.

**96.5** % 50% · Typical curve, derived from the datasheet efficiency of 96.5% (AEC method)

How the curve is drawn and where each figure comes from: [the IST7 60–200 range page](https://www.aecups.com/en/products/ist7-60-200/#efficiency).

**Load**: —

**Lost as heat**: —

**Energy lost in a year, 24/7**: —

**Its cost in a year at € per kWh**: —

The catalogue's examples use €0.20 per kWh.

#### Where each figure comes from

| Mode | Efficiency | Kind | Models | Source |
| --- | --- | --- | --- | --- |
| Online, double conversion | 25%: 95.9% · 50%: 96.5% · 75%: 96.2% · 100%: 95.9% | Typical curve, derived from the datasheet efficiency of 96.5% (AEC method) | all | AEC datasheet: AC/AC efficiency of the IST6-PM100 100 kW power module (the curve's shape) |
| ECO | 99% | Datasheet figure, load not stated | all |  |

EMEA 2026 catalogue figures: Online, double conversion up to 96.5% · ECO up to 99%.

Drag to turn

In 3D

## Look around the IST7-200

[Open full 3D · X-ray](https://www.aecups.com/assets/models3d/ist7-200/v75/)

Technical data

## Technical data IST7-200

Only this model's values, from the EMEA 2026 catalogue table.

**IST7-200 · Technical data**

|  |  |
| --- | --- |
| General |  |
| Rated power (kVA / kW) | 200 |
| Input |  |
| Connection | 3 phases + N + PE |
| Rated voltage | 220 / 230 / 240 V phase (380 / 400 / 415 V line) |
| Voltage range | 187–280 V phase at full power · 80–186 V with linear derating |
| Frequency · power factor · THDi | 40–70 Hz · ≥ 0.99 · ≤ 3% at full load |
| Bypass synchronisation range | 50 / 60 Hz ± 6 Hz |
| Battery |  |
| Nominal DC voltage (default) | ±216 V |
| String length | 28–48 × 12 V blocks, set on site · VRLA or lithium (BMS card) |
| Max. charge current | 60 A |
| Output |  |
| Voltage · frequency | 220 / 230 / 240 V phase · 50 / 60 Hz (± 0.1 Hz on battery) |
| Power factor · THDv | 1 (settable 0.9) · ≤ 1% linear, ≤ 4% non-linear load |
| Transient · unbalance · phase error | ≤ 5% for 0–100–0% step · 100% unbalanced load · ≤ 1° |
| Transfer time inverter ↔ bypass | < 1 ms synchronised · < 15 ms not synchronised |
| Inverter overload | ≤ 105% continuous · ≤ 110% 60 min · ≤ 125% 10 min · ≤ 150% 1 min (IST7-120: > 125% immediate) |
| Bypass overload | ≤ 130% continuous · ≤ 150% 5 min · ≤ 200% 1 s · ≤ 300% 100 ms |
| System |  |
| Efficiency AC/AC | up to 96.5% double conversion · 99% ECO mode |
| Parallel | Up to 8 units, capacity or N+X · BSC dual-bus synchronisation |
| Communication | RS485 · Modbus RTU · RS232 · 4 IN / 3 OUT dry contacts · EPO · SNMP slot · expansion slot |
| Display | Colour touch screen, 5 status LEDs, ambient light bar, 10,000 events and 10,000 user-log entries |
| Environment | −5 … 40 °C · 0–95% RH · IP20 · < 65 dB at 1 m · forced-air cooling |
| Cable entry | bottom (all models) |
| EMC | [IEC 62040-2](https://webstore.iec.ch/en/publication/33696):2016 · category C3 (not for residential use without additional measures) |
| Dimensions W × D × H | 600 × 1000 × 1600 mm |
| Weight | 296 kg |

**IST7-200 · Models**

| Item | IST7-200 |
| --- | --- |
| Rated power (kVA / kW) | 200 |
| Capacity upgrade | — |
| Power units | 2 |
| Nominal DC voltage (default) | ±216 V |
| Max. charge current | 60 A |
| W × D × H (mm) | 600 × 1000 × 1600 |
| Weight | 296 kg |

Specifications are subject to change without notice.

#### **More technical details** ordering codes

Ordering codes

## Ordering codes IST7-200

**Ordering codes IST7-200**

| Code | Description |
| --- | --- |
| IST7-200 | 200 kVA / 200 kW |
| PAR-IST7-60/200 | Parallel kit |
| IST7-\[kVA\]-\[n\]X\[Ah\] | UPS with battery cabinet, n × 12 V \[Ah\] (e.g. IST7-160-64X100 = IST7-160 + BB8 with 64 × 12 V 100 Ah) |

Questions

## Questions about the IST7-200

#### How many IST7-200 can run in parallel?

Up to eight, for 1.6 MW, with parallel cables in a ring (N units, N cables) and addresses 1–8 set from the display. A parameter match page shows any setting that differs between units and copies it to all.

#### Which batteries suit the IST7-200?

The catalogue lists BB8 with 60 / 64 × 80 / 100 Ah or two BB8 with 120 / 128 × 80 / 100 Ah, the string split at the neutral (+, N, −). Lithium cabinets are available on request with the BMS card.

#### How long does a 200 kVA UPS like the IST7-200 run?

3 to 19 minutes at full load (200 kW), and 8 to 50 minutes at half load, with the AEC battery options in the table: the battery chosen sets the figure. With 60 × 12 V 80 Ah · 2 × 30 (IST7-200-60X80): 4 minutes at 100% and 10 at 50%. For other loads and batteries use the backup-time tool.

#### How big is the AEC IST7-200 and how much does it weigh?

The AEC IST7-200 measures 600 × 1000 × 1600 mm; weight: 296 kg (size from AEC's CAD drawing, weight from the EMEA 2026 catalogue).

#### What is the ordering code of the AEC IST7-200?

In the EMEA 2026 catalogue the AEC IST7-200 is listed as IST7-200; AEC gives the full code, batteries included, from the load and the backup time.

Related models

## The same range: IST7 60–200

[The whole range](https://www.aecups.com/en/products/ist7-60-200/)

[**IST7-60** 60 kVA](https://www.aecups.com/en/products/ist7-60-200/ist7-60k/) [**IST7-80** 80 kVA](https://www.aecups.com/en/products/ist7-60-200/ist7-80k/) [**IST7-100** 100 kVA](https://www.aecups.com/en/products/ist7-60-200/ist7-100k/) [**IST7-120** 120 kVA](https://www.aecups.com/en/products/ist7-60-200/ist7-120k/) [**IST7-160** 160 kVA · smaller rating](https://www.aecups.com/en/products/ist7-60-200/ist7-160k/) **IST7-200** 200 kVA

Batteries and cabinets: [BB8](https://www.aecups.com/en/products/battery-cabinets/bb8/) [OZ Power 12 V 80 Ah](https://www.aecups.com/en/products/oz-power-vrla/oz-12v-80ah/) [OZ Power 12 V 100 Ah](https://www.aecups.com/en/products/oz-power-vrla/oz-12v-100ah/) [L6 Lithium](https://www.aecups.com/en/products/l6-lithium/) Accessories: [SNMP card](https://www.aecups.com/en/products/snmp-card/) [Dry contact card](https://www.aecups.com/en/products/dry-contact-card/)

Shared by the whole range, on the IST7 60–200 page: [the display simulator](https://www.aecups.com/en/products/ist7-60-200/#display) · [how the power flows in each mode](https://www.aecups.com/en/products/ist7-60-200/#diagrams) · [the catalogue's photos and drawings](https://www.aecups.com/en/products/ist7-60-200/#gallery).

Read next: [UPS installation clearances: what to check on site](https://www.aecups.com/en/blog/ups-installation-clearances/) [UPS heat output: BTU, cooling and room temperature](https://www.aecups.com/en/blog/ups-heat-output-cooling/) [L6 lithium battery sizing: modules, cabinets, room](https://www.aecups.com/en/blog/l6-lithium-battery-sizing/)

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need for the AEC IST7-200: we answer with the model and the batteries that fit. AEC International sells through distributors in about 80 countries and an agency in every Italian region: ask AEC which one serves your area.

[Contact us](https://www.aecups.com/en/contacts/?interest=Three-phase%20UPS&msg=About%20the%20AEC%20IST7-200%20(IST7%2060%E2%80%93200)%3A%20%0AQuantity%3A%20#form) [+39 02 9415 8991](tel:+390294158991)