# IST9 Three-phase rack UPS 10–40 kVA, 3U, 400 V

VRLA Online double conversion

The AEC IST9 is a three-phase online double-conversion UPS of 10 to 40 kVA in a 19-inch chassis 3U high, for 400 V supplies, also as a tower. 3/3 or 3/1 configuration, 1/1 up to 20 kVA; output power factor 1, efficiency up to 96% and 99% in ECO mode, and a touch screen that turns with the unit.

**1.0** output power factor

**≤ 3%** input THDi

**3U** one height, five ratings

Datasheet Manuals and catalogues [Contact us](https://www.aecups.com/en/contacts/?interest=Three-phase%20UPS&msg=About%20the%20AEC%20IST9%3A%20%0AQuantity%3A%20#form)

[**Try 3D** X-ray view](https://www.aecups.com/assets/models3d/ist9-20/v59/)

Drag to turn

In 3D

## Look around the IST9

Drag it round, swipe on a phone or use the arrow keys. X-ray makes the enclosure see-through, so you can see what sits behind the panels.

[Open full 3D · X-ray](https://www.aecups.com/assets/models3d/ist9-20/v59/)

Pick a size: the turn and the full 3D view follow it. Rendered from AEC's 3D models; the full 3D view zooms in, opens the unit and names every part.

Efficiency

## How efficient is the AEC IST9 at your load?

AC/AC efficiency of each operating mode against the load: AEC's measured curves where they exist, elsewhere the typical curve derived from the datasheet figure by AEC's method. The losses and their cost follow the curve at the load you choose: drag along the chart or move the slider.

**96** % 50% · Typical curve, derived from the datasheet efficiency of 96% (AEC method)

Filled points: measured by AEC (AC/AC technical datasheet). Hollow points: a typical curve, the shape of the most similar measured curve (same technology and size) moved to the range's datasheet efficiency: η(load) = reference curve + (datasheet figure − its highest point), AEC's method. Dashed lines: one figure without a load (ECO, W-ECO). Between points the efficiency is read on a straight line; beyond them, the nearest end. Losses = P × (1/η − 1).

**Load**: —

**Lost as heat**: —

**Energy lost in a year, 24/7**: —

**Its cost in a year at € per kWh**: —

The catalogue's examples use €0.20 per kWh.

#### Where each figure comes from

| Mode | Efficiency | Kind | Models | Source |
| --- | --- | --- | --- | --- |
| Double conversion, high-voltage mode | 25%: 95.4% · 50%: 96% · 75%: 95.7% · 100%: 95.4% | Typical curve, derived from the datasheet efficiency of 96% (AEC method) | all | AEC datasheet: AC/AC efficiency of the IST6-PM100 100 kW power module (the curve's shape) |
| Double conversion, low-voltage mode | 25%: 93.4% · 50%: 94% · 75%: 93.7% · 100%: 93.4% | Typical curve, derived from the datasheet efficiency of 94% (AEC method) | IST9 10 kVA · IST9 20 kVA · IST9 40 kVA | AEC datasheet: AC/AC efficiency of the IST6-PM100 100 kW power module (the curve's shape) |
| ECO | 99% | Datasheet figure, load not stated | all |  |

EMEA 2026 catalogue figures: Double conversion, high-voltage mode up to 96% · Double conversion, low-voltage mode up to 94% · ECO up to 99%.

Touch screen

## The IST9 touch screen.

Landscape in the rack, portrait in the tower: the display rotates automatically, or is set by hand. Seven languages, Italian included.

TOUCH SCREEN

### A touch screen that turns with the UPS

Touch screen on the home page, the four indicators and the ON / OFF button under it (rack version)

Power flow

Real-time monitor

History

User login

- Front panel: touch screen (working status and settings); mains inverter indicator (green in mains mode); bypass indicator (green when the output is on bypass); battery inverter indicator (green in battery mode); fault indicator (red on UPS fault).
- ON / OFF button: hold 3 s to switch on or off; hold 5–10 s for a battery cold start.
- Home page: live single-line diagram; the active energy path is drawn in yellow, abnormal mains, bypass, battery or output turn red.
- Real-time monitor: run, mains, bypass, output and battery information.
- History: up to 1,000 records, newest first.
- Login: user and service passwords for different settings (2 levels).
- Project management: system, battery, communication, dry contact, calibration, smart management.
- Readings: mains and bypass voltage, current, frequency; output voltage, current, active and apparent power, load, power factor, frequency; battery group voltages, charge / discharge current, status, remaining capacity and backup time; running status of rectifier, inverter, ECO, fans, temperatures, parallel ID.
- Languages: English, Italian, Spanish, French, Portuguese, Russian, Chinese.
- Display: landscape, portrait or automatic; backlight 10–300 s, brightness 1–100; date, time and passwords.

What is what

## Inside the IST9, part by part.

Each number is named in the list under its picture: the front and the rear, side by side.

### Front

The touch screen turns with the UPS: portrait in the tower, landscape in the rack.

1. **Touch screen** Working status and settings. The home page draws the single-line diagram live: the active energy path in yellow, abnormal mains, bypass, battery or output in red.
2. **Mains inverter indicator** Green in mains mode.
3. **Bypass indicator** Green when the output is on bypass.
4. **ON / OFF button** Hold 3 s to switch the UPS on or off; hold 5–10 s for a battery cold start.
5. **Battery inverter indicator** Green in battery mode.
6. **Fault indicator** Red on a UPS fault.

### Rear · 10–20 kVA

Option slots closed by their covers until a card is fitted.

1. **Wiring terminals** Under the terminal box's hood; the layout differs slightly between 3/3 and 3/1 mode.
2. **RS232** To a PC, for the monitoring software.
3. **Intelligent slot** Optional SNMP card, RS485 + dry-contact card or protocol transfer card.
4. **EPO and input dry contact** EPO and IN.1 must stay short-circuited for the UPS to work (4-pin terminal supplied).
5. **SNMP (optional)** Second slot for the optional SNMP card.
6. **Parallel port (optional)** For the optional parallel kit.

### Rear · 30–40 kVA

Terminals, communication ports and option slots are all on the rear of the 3U chassis.

1. **Wiring terminals** Under the terminal box's hood; the layout differs slightly between 3/3 and 3/1 mode.
2. **RS232** To a PC, for the monitoring software.
3. **Intelligent slot** Optional SNMP card, RS485 + dry-contact card or protocol transfer card.
4. **EPO and input dry contact** EPO and IN.1 must stay short-circuited for the UPS to work (4-pin terminal supplied).
5. **SNMP (optional)** Second slot for the optional SNMP card.
6. **Parallel port (optional)** For the optional parallel kit.
7. **PE** Protective earth terminal of the 30-40 kVA chassis.

Overview

## Key facts

**Power range**: 10–40 kVA

**Input / output**: 3/3 · 3/1 · 1/1 · 220 / 230 / 240 V L-N · 380 / 400 / 415 V L-L

**Efficiency**: up to 96% (high-voltage mode) · 94% (low-voltage mode) · 99% ECO

**Display**: touch screen

**Communication**: RS232

**Network card**: SNMP card (optional)

**Warranty**: 3 years

**Dimensions W × D × H**: 438 × 535 × 130 · 438 × 720 × 130 mm

[Applications](https://www.aecups.com/en/applications/): Servers & data centres Telecom systems Finance & stock Networks Railway Postal services

Pictures

## The IST9 in pictures

The photos and drawings of the EMEA 2026 catalogue: product views, displays, modules and connections. Tap a picture to enlarge it.

Models

## Which IST9 fits your load?

Every rating has its own page: that model's technical data, ordering codes, batteries and the questions people ask.

[**IST9 10 kVA** 10 kVA The IST9 10 kVA is a 10 kVA / 10 kW online double-conversion UPS in a 19-inch, 3U chassis, 535 mm deep, that works 3/3, 3/1 or 1/1. **438 × 535 × 130 mm (3U)**Size **18.4 kg**Weight See the model](https://www.aecups.com/en/products/ist9/ist9-10k/) [**IST9 15 kVA** 15 kVA The IST9 15 kVA is a 15 kVA / 15 kW online double-conversion UPS in the 3U chassis of the 10 and 20 kVA, 18.4 kg, for 3/3, 3/1 or 1/1. **438 × 535 × 130 mm (3U)**Size **18.4 kg**Weight See the model](https://www.aecups.com/en/products/ist9/ist9-15k/) [**IST9 20 kVA** 20 kVA The IST9 20 kVA is a 20 kVA / 20 kW online double-conversion UPS in 3U and 18.4 kg, ordered with a power distribution box and maintenance breaker. **438 × 535 × 130 mm (3U)**Size **18.4 kg**Weight See the model](https://www.aecups.com/en/products/ist9/ist9-20k/) [**IST9 30 kVA** 30 kVA The IST9 30 kVA is a 30 kVA / 30 kW online double-conversion UPS in a 3U chassis 720 mm deep, for 3/3 or 3/1. **438 × 720 × 130 mm (3U)**Size **34.1 kg**Weight See the model](https://www.aecups.com/en/products/ist9/ist9-30k/) [**IST9 40 kVA** 40 kVA The IST9 40 kVA is a 40 kVA / 40 kW online double-conversion UPS in 3U, the most powerful 19-inch AEC UPS, for 3/3 or 3/1. **438 × 720 × 130 mm (3U)**Size **34.2 kg**Weight See the model](https://www.aecups.com/en/products/ist9/ist9-40k/)

Datasheet

## Datasheet IST9.

Every model side by side: keep only what differs, take it as CSV or print it.

**IST9 · Technical data**

| Model | IST9 10 kVA | IST9 15 kVA | IST9 20 kVA | IST9 30 kVA | IST9 40 kVA |
| --- | --- | --- | --- | --- | --- |
| General |  |  |  |  |  |
| Rated power (kVA / kW, high-voltage mode) | 10 / 10 | 15 / 15 | 20 / 20 | 30 / 30 | 40 / 40 |
| Rated power (kVA / kW, low-voltage mode) | 10 / 10 | not published | 10 / 10 | — | 20 / 20 |
| Configuration | 3/3 · 3/1 · 1/1 | 3/3 · 3/1 |  |  |  |
| Input |  |  |  |  |  |
| Connection | 3W + N + PE (settable 1W + N + PE) | 3W + N + PE |  |  |  |
| Voltage range (phase) | high-voltage mode 176–280 V full load, 80–176 V linear derating · low-voltage mode 90–155 V full load, 70–90 V derating |  |  |  |  |
| Frequency · power factor · THDi | 40–70 Hz · ≥ 0.99 · ≤ 3% resistive, ≤ 5% non-linear full load |  |  |  |  |
| Bypass | 50 / 60 Hz ± 10% · voltage ± 20% |  |  |  |  |
| Battery |  |  |  |  |  |
| Voltage | high-voltage mode ± 96 … ± 240 V DC (± 48 … ± 120 cells of 2 V, default ± 96) · low-voltage mode ± 96 … ± 120 V (± 48 … ± 60 cells, default ± 60) |  |  |  |  |
| Full-load derating by cells | — | ± 48 … ± 90 cells: 100 × 0.0625 × N / 6 % |  |  |  |
| Charging current | 1–10 A (default 4 A) | 1–20 A (default 15 A) |  |  |  |
| Output |  |  |  |  |  |
| Voltage | 220 / 230 / 240 V L-N, 380 / 400 / 415 V L-L (low-voltage mode 110 / 115 / 120 V); 3W + N + PE, settable 1W + N + PE |  |  |  |  |
| Frequency | tracks the bypass; 50 ± 0.1 or 60 ± 0.1 Hz in battery mode |  |  |  |  |
| Waveform · distortion · power factor | sine wave · ≤ 2% resistive full load · 1.0 |  |  |  |  |
| Transfer inverter ↔ bypass | < 1 ms synchronised · < 10 ms not synchronised |  |  |  |  |
| Inverter overload | ≤ 105% continuous · 105–110% 60 min · 110–130% 10 min · 130–155% 1 min · > 155% 200 ms · > 200% immediate |  |  |  |  |
| Bypass overload | < 130% continuous · 130–155% 1 min · > 155% 200 ms |  |  |  |  |
| System |  |  |  |  |  |
| Efficiency | up to 96% (high-voltage mode) · 94% (low-voltage mode) · 99% ECO |  |  |  |  |
| Display · cold start | touch screen · battery cold start fitted |  |  |  |  |
| Communication | RS232 · options: SNMP, RS485 + dry contact, protocol card for the approved lithium system, parallel card |  |  |  |  |
| Noise (20–25 °C) | ≤ 50 dB half load · ≤ 55 dB 75% and full load | ≤ 55 dB half load · ≤ 58 dB 75% · ≤ 60 dB full load |  |  |  |
| Environment | −5 … 40 °C · 0–95% RH non-condensing · ≤ 2000 m |  |  |  |  |
| Dimensions (W × D × H) | 438 × 535 × 130 mm (3U) | 438 × 720 × 130 mm (3U) |  |  |  |
| Weight | 18.4 kg | 18.4 kg | 18.4 kg | 34.1 kg | 34.2 kg |

— not stated in the user manual. Specifications are subject to change without notice.

#### **Full technical details** 12 sections of the EMEA 2026 catalogue: functions, panel, connections, diagrams and ordering codes

### Why IST9

01 **3/3 · 3/1 · 1/1 · Three configurations** Three-phase or single-phase output: 3/3 or 3/1 on every size, 1/1 on 10–20 kVA. Set with connector jumpers and on the touch screen.

02 **96% · Double-conversion efficiency** Three-level inverter and PFC: up to 96% in double conversion, 99% in ECO mode.

03 **PF 1 · kVA = kW** Output power factor 1.0; input power factor ≥ 0.99, THDi ≤ 3% at resistive full load.

04 **Rack · tower · Two ways to install** 3U in a 19-inch cabinet or upright on its base: the touch screen turns automatically.

05 **±96…±240 V · Battery voltage set on site** High-voltage mode: ±48 to ±120 cells of 2 V (default ±96); lead-acid or the approved lithium system.

06 **Self-maintenance · Fans, dust, reminders** Fan speed follows the load, dedust cycles, reminders for capacitors, fans, batteries and filter.

OPERATING COST

## What efficiency means at 20 kW

Losses are energy turned into heat: paid once at the meter and again in the room cooling.

- Online double conversion at 96%: 0.83 kW lost, 7,300 kWh per year, ≈ € 1,460 per year.
- ECO mode at 99%: 0.20 kW lost, 1,770 kWh per year, ≈ € 350 per year.
- Assumptions: 20 kW load, 24/7, € 0.20/kWh. Losses = P × (1/η − 1). ECO is for single units, with the bypass within its range. Indicative values.

**What efficiency means at 20 kW**

| Mode | Losses | Energy lost / year | Cost / year |
| --- | --- | --- | --- |
| Online double conversion · 96% | 0.83 kW | 7,300 kWh | ≈ € 1,460 |
| ECO mode · 99% | 0.20 kW | 1,770 kWh | ≈ € 350 |

FLEXIBILITY

## Three-phase or single-phase, set on the terminals

10–20 kVA work in 3/3, 3/1 or 1/1 mode; 30–40 kVA in 3/3 or 3/1 mode. The mode is set with connector jumpers on the rear terminals and on the touch screen.

- 3/3 mode: three in, three out (10–40 kVA).
- 3/1 mode: three in, one out (10–40 kVA).
- 1/1 mode: one in, one out (10–20 kVA only).
- Connector jumpers, 10–20 kVA: four jumper types (types 1–2 two-pin, 3–4 three-pin) for 3/3, 3/1 or 1/1 mode.
- Connector jumpers, 30–40 kVA: one 3-pin jumper type, used only in 3/1 mode; it short-circuits the three-phase bypass input and the three-phase output terminals.
- Set on the screen: work mode on the System management page. Output 3W + N + PE, settable to 1W + N + PE; input 3W + N + PE (on 10–20 kVA settable to 1W + N + PE).
- High-voltage mode: 220 / 230 / 240 V phase voltage (380 / 400 / 415 V line), default 220 V.
- Low-voltage mode: 110 / 115 / 120 V (190 / 200 / 208 V line), default 120 V; 20 kVA delivers 10 kVA, 40 kVA delivers 20 kVA.
- 50 / 60 Hz: the UPS monitors the grid frequency and self-adapts.
- ±5 V output voltage fine adjustment.

HOW IT WORKS

## Online double conversion, five operating modes

Rectifier / PFC, inverter, charger and bypass static switch. Inputs: mains, bypass and battery; outputs: inverter, bypass and maintenance bypass (with the distribution module). On battery, the rectifier / PFC boosts the battery voltage onto the DC bus.

- Normal mode: rectifier and inverter supply the load; the charger charges the battery.
- Battery mode: with the mains abnormal, the rectifier switches to the battery input and boosts it onto the DC bus.
- Bypass mode: with the bypass in range, the load is fed from the bypass when the UPS is off (if enabled) or on a fault.
- ECO mode: single UPS; the bypass feeds the load while it is normal, at 99% efficiency.
- Maintenance bypass: with the distribution module, the load stays supplied while the UPS is serviced.
- Auto restart: after a complete outage the UPS shuts down about 1 min after the battery low-voltage point, then restarts by itself in normal mode when the mains returns.
- Transfer inverter ↔ bypass: < 1 ms synchronised, < 10 ms not synchronised.

REAR PANEL

## Same front and width, two chassis depths

Every IST9 is 438 mm wide and 130 mm (3U) high: 535 mm deep for 10–20 kVA, 720 mm deep for 30–40 kVA. Terminals, communication ports and option slots are on the rear.

- 10–20 kVA: 438 × 535 × 130 mm, 18.4 kg.
- 30–40 kVA: 438 × 720 × 130 mm, 34.1 / 34.2 kg.
- Wiring terminals: bypass, AC output, AC input, battery.
- RS232 port, standard.
- Intelligent slot: SNMP, RS485 + dry contact or lithium protocol card.
- EPO and input dry contact IN.1 (default: maintenance bypass detection).
- SNMP and parallel port, optional; PE terminal on 30–40 kVA.
- Terminal layout differs slightly between 3/3 and 3/1 mode.

INSTALLATION

## Rack or tower, with its own modules

UPS, distribution module and battery box all fit a 19-inch cabinet. Rack: distribution module above the UPS, battery box below it. Tower: modules side by side on joint bases.

- Rack-mounted, 3U, with 3U handles; tower on a support base, with the screen reading upright.
- Distribution module (optional): input, bypass and output breakers and the maintenance bypass breaker behind a front panel. Removing the protection plate signals the UPS to transfer to bypass before the maintenance breaker is closed.
- Battery box (optional): always mounted below the UPS in the rack. A DC battery switch is required between battery and UPS.
- Backfeed protection: from the distribution module with backfeed contactor, or from a backfeed protection contactor between distribution box and UPS, rated above the UPS operating current and labelled for backfeed risk.
- 438 × 130 mm (W × H, 3U); depth 535 / 720 mm.
- Weight 18.4 kg (10–20 kVA) · 34.2 kg (40 kVA).
- Altitude ≤ 2000 m; operating temperature −5 … 40 °C.

SMART FUNCTIONS

## Inrush loads, generators, fixed frequency, site tests

Functions set on the touch screen for inrush loads, generators, fixed-frequency outputs and site testing, plus self-maintenance of fans and dust.

- Impact load mode: for outputs with inrush loads such as transformers; prevents the excitation current from damaging the UPS. Enabled on the screen before the load is started.
- Generator mode: when enabled, battery charging is disabled (for operation from a generator).
- Frequency converter: output frequency fixed at 50 or 60 Hz, independent of the input; bypass not used.
- Test load: self-aging function, test load rate settable 10–110%.
- Phase sequence calibration: when enabled, a wrong input phase sequence is tolerated; the output runs normally without derating and the alarm is still reported.
- Short-circuit time: inverter protection time on output short circuit, settable 10–200 ms.
- Fan speed follows the load: longer fan life, less noise.
- Standard dedust (load below 50%): fans at full speed for 2.5 s every 2.5 s, for 1 min.
- Timed dedust: the same cycle for N minutes (1–60).
- Regular dedust: 200 s at full speed every 1–720 h.
- Optional air filter fitted in the right panel; fans reached by removing the right panel.
- Auto-start at power-on: on, off or non-off. Bypass on or off when the UPS is off, or forced.
- Smart management reminders: electrolytic capacitor use time 1–84 months; fan use time 1–84 months; battery replacement 1–120 months; dust filter cleaning 1–12 months.

BATTERY AND OVERLOAD

## A battery chosen for the site, an inverter that holds

Battery string in high-voltage mode: ±48 to ±120 cells of 2 V (default ±96), i.e. ±96 V to ±240 V DC (±192 V at the default).

- Charging current 1–10 A (10–20 kVA, default 4 A) · 1–20 A (30–40 kVA, default 15 A).
- Battery capacity setting 7–999 Ah.
- 30–40 kVA, ±48 to ±90 cells: full-load point derated to 100 × 0.0625 × N / 6 % (N = cells).
- Lead-acid or lithium: battery type set on the screen; lead-acid, or the approved lithium battery system via the RS485 protocol card.
- Battery tests: standard (10 s on battery), deep (to the low-voltage alarm) or regular (set time, 1–255 min).
- Charge control: average and float charge voltage per cell, temperature compensation 0–5 mV/°C, forced charge, battery resting.
- Inverter overload: 105% continuous · 110% 60 min · 130% 10 min · 155% 1 min · 200% 200 ms; > 200% immediate protection.
- Bypass overload: < 130% continuous · 155% 1 min · > 155% 200 ms.
- Input window, high-voltage mode: full load from 176 to 280 V phase voltage; from 80 to 176 V the output is derated linearly (load 15–100%).
- Input window, low-voltage mode: full load 90–155 V, 70–90 V linear derating (load 75–100%).
- Input frequency 40–70 Hz; bypass synchronisation 50 / 60 Hz ± 10%; bypass voltage ± 20%.
- Battery cold start: the UPS starts from the battery with no mains (hold ON / OFF for 5–10 s). On complete outage it switches off about 1 min after the low-voltage point to protect the battery.

**A battery chosen for the site, an inverter that holds**

| Load | Inverter | Bypass |
| --- | --- | --- |
| 105% | continuous | — |
| < 130% | — | continuous |
| 110% | 60 min | — |
| 130% | 10 min | — |
| 155% | 1 min | 1 min |
| > 155% | — | 200 ms |
| 200% | 200 ms | — |
| > 200% | immediate protection | — |

CONNECTIVITY AND PARALLEL

## Connected, and ready for redundancy

RS232 as standard; SNMP, RS485 + dry contact and lithium protocol cards in the intelligent slot; parallel card for N+1 redundancy.

- Parallel system: units started one by one, then joined; voltage difference within 8 V, circulating current below 3 A.
- A faulty unit leaves the system automatically with an alarm; after the exit procedure it can be serviced or replaced online.
- New units join online and share the current. N+1: total load up to N times one unit.
- EPO and IN.1: by default (NC) IN.1 and EPO must be shorted for the UPS to run; both can be set NC or NO.
- IN.1 open (maintenance bypass detection): the UPS transfers to bypass. EPO open: inverter and bypass output shut down.
- IN.1 can be programmed as external maintenance bypass, transformer over-temperature, charge disable or discharge disable.
- Recommended breakers: 1.5–2 times the max. input current, without leakage protection; DC breaker rated above 250 V DC. Cables per user manual for about 5 m; above 20 m increase the section.

**Connected, and ready for redundancy**

| Model | Mode | AC input (A) | Bypass input (A) | DC input (A) | AC output (A) |
| --- | --- | --- | --- | --- | --- |
| 10 kVA | 3/3 | 32 × 3P | 32 × 3P | 100 × 3P | 32 × 3P |
| 10 kVA | 3/1 | 32 × 3P | 63 × 1P | 100 × 3P | 63 × 1P |
| 10 kVA | 1/1 | 80 × 1P | 63 × 1P | 100 × 3P | 63 × 1P |
| 20 kVA | 3/3 | 63 × 3P | 50 × 3P | 100 × 3P | 50 × 3P |
| 20 kVA | 3/1 | 63 × 3P | 125 × 1P | 100 × 3P | 125 × 1P |
| 20 kVA | 1/1 | 150 × 1P | 125 × 1P | 100 × 3P | 125 × 1P |
| 30 kVA | 3/3 | 100 × 3P | 100 × 3P | 160 × 3P | 100 × 3P |
| 30 kVA | 3/1 | 100 × 3P | 200 × 1P | 160 × 3P | 200 × 1P |
| 40 kVA | 3/3 | 100 × 3P | 100 × 3P | 200 × 3P | 100 × 3P |
| 40 kVA | 3/1 | 100 × 3P | 250 × 1P | 200 × 3P | 250 × 1P |

PLANNING AND ORDERING

## Currents, codes and options

Maximum steady-state phase current (A). Size breakers and cables on these currents; recommended breakers are on the Connectivity page.

- Distribution module: input, bypass, output and maintenance bypass breakers; versions for 10–20 and 30–40 kVA.
- Battery box: mounted below the UPS in the rack; DC battery switch between battery and UPS.
- Parallel kit: parallel card and 2 m cable, CAN communication between units; not hot-swap.
- Dry-contact kit: 3 outputs (mains, battery, inverter or bypass) and 2 inputs (battery temperature, battery breaker or remote on / off).
- Lithium protocol card: RS485 on RJ45 for the approved lithium battery system, plus one RS485 channel for monitoring.
- SNMP card: remote monitoring via web page.

**Currents, codes and options**

| Model | Mode | AC input (A) | Bypass input (A) | DC input (A) | AC output (A) |
| --- | --- | --- | --- | --- | --- |
| 10 kVA | 3/3 | 19 | 15 | 56 | 15 |
| 10 kVA | 3/1 | 19 | 46 | 56 | 46 |
| 10 kVA | 1/1 | 57 | 46 | 56 | 46 |
| 20 kVA | 3/3 | 35 | — | 56 | 30 |
| 20 kVA | 3/1 | 35 | 91 | 56 | 91 |
| 20 kVA | 1/1 | 105 | 91 | 56 | 91 |
| 30 kVA | 3/3 | 59 | 46 | 83 | 46 |
| 30 kVA | 3/1 | 59 | 138 | 83 | 138 |
| 40 kVA | 3/3 | 75 | 61 | 111 | 61 |
| 40 kVA | 3/1 | 75 | 182 | 111 | 182 |

### Ordering codes IST9

| Code | Description |
| --- | --- |
| `IST9-20` | IST9 20 kVA, 1:1 · 3:1 · 3:3, external batteries, with power distribution box and maintenance breaker |
| `IST9-20-\[n\]X9` | As above with 2, 4, 6, 8 or 10 BBJ2 rack battery cabinets: n = 32, 64, 96, 128 or 160 × 12 V 9 Ah |
| `IST9-10-\[n\]X9 · IST9-15-\[n\]X9` | IST9 10 or 15 kVA in the same way: power distribution box, maintenance breaker and 2, 4, 6, 8 or 10 BBJ2 rack battery cabinets (AEC EMEA product data) |
| `IST9-10 · IST9-30 · IST9-40` | Code on request |
| `PAR-IST9` | Parallel board |
| `DRYCNT-IST3/9 · SNMP` | Dry-contact relay board · internal SNMP board |
| `BBJ2` | Rack battery cabinet, max. 16 × 12 V 9 Ah, 3U |

Diagrams

## The IST9, in diagrams

The path of the power, the ratings, the footprints and the losses, drawn from the figures of the EMEA 2026 catalogue.

### How the power flows

Pick an operating mode: the path the power takes to the load lights up.

**Normal.** Double conversion: the rectifier feeds the DC bus, the inverter rebuilds a clean voltage and the load always runs on the inverter. The battery stays on charge. Efficiency up to 96% (high-voltage mode; ECO single UPS).

### The ratings

Every model in the range, in proportion to its power.

1. IST9 10 kVA **10 kVA · 10 kW**
2. IST9 20 kVA **20 kVA · 20 kW**
3. IST9 30 kVA **30 kVA · 30 kW**
4. IST9 40 kVA **40 kVA · 40 kW**

### Losses per 100 kW of load

Worked out as P × (1/η − 1) at the stated maximum efficiency, with the load steady all year. high-voltage mode; ECO single UPS.

1. Double conversion 96% **4.17 kW36,500 kWh/year**
2. ECO 99% **1.01 kW8,850 kWh/year**

### Phase configurations

Input / output: three-phase (3) or single-phase (1). 1/1 on 10–20 kVA only.

**3/3** 3~ → 3~

**3/1** 3~ → 1~

**1/1** 1~ → 1~

Questions

## Questions people ask

#### Can the IST9 supply single-phase loads from a three-phase input?

Yes: every IST9 works in 3/3 or 3/1 mode, and the 10–20 kVA models also in 1/1. The mode is set with connector jumpers on the rear terminals and on the touch screen.

#### What are the IST9 dimensions and weights?

Every IST9 is 438 mm wide and 130 mm (3U) high, for a 19-inch rack or standing as a tower. It measures 438 × 535 × 130 mm and 18.4 kg for 10–20 kVA, 438 × 720 × 130 mm and 34.1 / 34.2 kg for 30–40 kVA. The touch screen turns automatically between landscape and portrait.

#### How efficient is the IST9?

Up to 96% in online double conversion and 99% in ECO mode, with output power factor 1 (kVA = kW). At a 20 kW load running 24/7, AEC's indicative calculation gives about 7,300 kWh lost per year in double conversion against 1,770 kWh in ECO mode.

#### Which batteries does the IST9 use, and how is backup time extended?

The battery string is set on site: in high-voltage mode ±48 to ±120 cells of 2 V (default ±96), that is ±96 to ±240 V DC, lead-acid or the approved lithium system via the protocol card. For the IST9 20 kVA, AEC codes combine the UPS with 2, 4, 6, 8 or 10 BBJ2 rack cabinets, from 32 to 160 × 12 V 9 Ah, always mounted below the UPS.

#### Can IST9 units work in parallel for redundancy?

Yes, with the optional parallel card and port (CAN communication between units) for N+1 redundancy, where the total load stays within N times one unit. A faulty unit leaves the system automatically, and units join or leave online.

#### Which communication options does the IST9 have?

An RS232 port, the EPO and a programmable input (IN.1) are standard. The intelligent slot takes an SNMP card for web monitoring, an RS485 + dry-contact card (3 outputs, 2 inputs) or the protocol card for the approved lithium battery system.

#### What should be planned for the IST9 installation?

The IST9 runs at −5 … 40 °C, up to 2000 m. Size breakers at 1.5–2 times the maximum input current without leakage protection, with a DC breaker rated above 250 V DC and a DC battery switch between battery and UPS; the optional distribution module adds input, bypass, output and maintenance bypass breakers.

[All 20 questions](https://www.aecups.com/en/faq/ist9/)

In the same family: [All-in-One](https://www.aecups.com/en/products/all-in-one/) [IST7 10–40](https://www.aecups.com/en/products/ist7-10-40/) [IST7 60–200](https://www.aecups.com/en/products/ist7-60-200/) [IST7-T](https://www.aecups.com/en/products/ist7-t/) [Three-phase UPS](https://www.aecups.com/en/products/three-phase-ups/)

References

## Where is the IST9 installed?

[All projects](https://www.aecups.com/en/projects/)

[**IST9 and IST3-J rack UPS for a group's server rooms in Germany** Server rooms · Germany](https://www.aecups.com/en/projects/#germany-server-rooms-ist9-ist3j)

Guides

## Guides on the IST9

[All guides](https://www.aecups.com/en/blog/)

[**How to choose a UPS: type, runtime, phases and service** How to choose a UPS once its size is known: online or line-interactive, runtime and shutdown, single- or three-phase, rack or tower, and service.](https://www.aecups.com/en/blog/how-to-choose-a-ups/) [**Single- or three-phase UPS: which does your site need?** Single-phase or three-phase UPS? Where the line falls in kVA and amps, what the supply and the loads decide, a 12 kW worked example and a checklist.](https://www.aecups.com/en/blog/single-vs-three-phase-ups/) [**Three-phase UPS: configurations, sizing and installation** A three-phase UPS protects 400 V loads from about 10 kVA up. 3/3 against 3/1, phase balancing, sizing from measured currents, and installation.](https://www.aecups.com/en/blog/three-phase-ups/)

Read next: [kVA vs kW: power factor and UPS sizing explained](https://www.aecups.com/en/blog/kva-vs-kw/) [UPS efficiency and ECO mode: losses and energy savings](https://www.aecups.com/en/blog/ups-efficiency-eco-mode/) [Industrial UPS: protecting PLCs, motors and processes](https://www.aecups.com/en/blog/ups-for-industry/)

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need for the AEC IST9 10–40 kVA: we answer with the model and the batteries that fit. AEC International sells through distributors in about 80 countries and an agency in every Italian region: ask AEC which one serves your area.

[Contact us](https://www.aecups.com/en/contacts/?interest=Three-phase%20UPS&msg=About%20the%20AEC%20IST9%3A%20%0AQuantity%3A%20#form) [+39 02 9415 8991](tel:+390294158991)