# IST9 20 kVA Three-phase rack UPS 20 kVA, 3U, 400 V

VRLA 20 kVA online rack UPS, 3U, 3/3 · 3/1 · 1/1

The IST9 20 kVA is a 20 kVA / 20 kW online double-conversion UPS in 3U and 18.4 kg, ordered with a power distribution box and maintenance breaker. For data rooms and telecom or finance sites of 10 to 20 kW that want everything, batteries included, in one 19-inch rack.

**20 kVA / 20 kW** Rating

**438 × 535 × 130 mm (3U)** W × D × H

**18.4 kg** Weight

Technical data [Catalogue (PDF)](https://www.aecups.com/docs/AEC_UPS_Catalogue_EMEA_2026.pdf#page=57) [Contact us](https://www.aecups.com/en/contacts/?interest=Three-phase%20UPS&msg=About%20the%20AEC%20IST9%2020%20kVA%20(IST9)%3A%20%0AQuantity%3A%20#form)

[**Try 3D** X-ray view](https://www.aecups.com/assets/models3d/ist9-20/v59/)

Quick answers

## IST9 20 kVA: quick answers

**What it is**: The IST9 20 kVA is a 20 kVA / 20 kW online double-conversion UPS in 3U and 18.4 kg, ordered with a power distribution box and maintenance breaker.

**Who it is for**: For data rooms and telecom or finance sites of 10 to 20 kW that want everything, batteries included, in one 19-inch rack.

**Supply and configuration**: 3W + N + PE (settable 1W + N + PE) · 220 / 230 / 240 V L-N · 380 / 400 / 415 V L-L

**Size and weight**: 438 × 535 × 130 mm (3U) · 18.4 kg

**Ordering code**: IST9-20 · IST9-20-\[n\]X9

IST9

## What sets apart the IST9 20 kVA

The 20 kVA doubles the power of the 10 kVA in the same 438 × 535 × 130 mm chassis. It is the IST9 with a full ordering code in the catalogue: IST9-20 with distribution box and maintenance breaker, and IST9-20-\[n\]X9 with 2, 4, 6, 8 or 10 BBJ2 rack battery cabinets, that is 32 to 160 batteries of 12 V 9 Ah, all in the rack.

The catalogue's operating-cost example uses a 20 kW load: 0.83 kW of losses and 7,300 kWh a year in double conversion at 96%, 0.20 kW and 1,770 kWh in ECO mode at 99%. It still works 1/1, with 105 A at the input on a 150 A 1P breaker.

- **Against the IST9 15 kVA** (one size down): Rated power 20 kVA / 20 kW against 15 kVA / 15 kW; Rated power 10 kVA / 10 kW against not published.
- **Against the IST9 30 kVA** (one size up): Rated power 20 kVA / 20 kW against 30 kVA / 30 kW; Configuration 3/3 · 3/1 · 1/1 against 3/3 · 3/1; Connection 3W + N + PE (settable 1W + N + PE) against 3W + N + PE; Charging current 1–10 A (default 4 A) against 1–20 A (default 15 A); Noise (20–25 °C) ≤ 50 dB half load · ≤ 55 dB 75% and full load against ≤ 55 dB half load · ≤ 58 dB 75% · ≤ 60 dB full load.

Planning data

## IST9 20 kVA: currents, breakers, cables, batteries

The rows and columns of the EMEA 2026 catalogue's and AEC manuals' tables that concern the IST9 20 kVA.

### Connected, and ready for redundancy

**IST9 20 kVA · Connected, and ready for redundancy**

| Model | Mode | AC input (A) | Bypass input (A) | DC input (A) | AC output (A) |
| --- | --- | --- | --- | --- | --- |
| 20 kVA | 3/3 | 63 × 3P | 50 × 3P | 100 × 3P | 50 × 3P |
| 20 kVA | 3/1 | 63 × 3P | 125 × 1P | 100 × 3P | 125 × 1P |
| 20 kVA | 1/1 | 150 × 1P | 125 × 1P | 100 × 3P | 125 × 1P |

### Currents, codes and options

**IST9 20 kVA · Currents, codes and options**

| Model | Mode | AC input (A) | Bypass input (A) | DC input (A) | AC output (A) |
| --- | --- | --- | --- | --- | --- |
| 20 kVA | 3/3 | 35 | — | 56 | 30 |
| 20 kVA | 3/1 | 35 | 91 | 56 | 91 |
| 20 kVA | 1/1 | 105 | 91 | 56 | 91 |

Installation

## Installing the IST9 20 kVA: space, heat, cables

Each figure with its source. Heat is the power lost at the peak efficiency stated.

**IST9 20 kVA · installation**

| Item | Figure | Source |
| --- | --- | --- |
| Cable entry | At the rear | EMEA 2026 catalogue p.64 |
| Heat at full load | 0.83 kW at 20 kW load, 96 % efficiency | EMEA 2026 catalogue p.64; output PF 1 (EMEA 2026 catalogue) |
| Operating temperature | −5 to 40 °C | EMEA 2026 catalogue p.64 |

Size and floor

## How big it is

438 × 535 × 130 mm · 18.4 kg.

**0.23 m²** footprint

**79 kg/m²** floor load

**0.13 m** height

Floor load = weight ÷ footprint (18.4 kg).

Efficiency

## How efficient is the AEC IST9 20 kVA at your load?

IST9 20 kVA, 20 kW at its rating, double conversion, high-voltage mode (typical curve, AEC's method). Heat to remove on this curve: 25%: 0.24 kW (η 95.4%) · 50%: 0.42 kW (η 96%) · 75%: 0.67 kW (η 95.7%) · 100%: 0.96 kW (η 95.4%). At 50% load, 24/7, it loses about 3,650 kWh a year.

**96** % 50% · Typical curve, derived from the datasheet efficiency of 96% (AEC method)

How the curve is drawn and where each figure comes from: [the IST9 range page](https://www.aecups.com/en/products/ist9/#efficiency).

**Load**: —

**Lost as heat**: —

**Energy lost in a year, 24/7**: —

**Its cost in a year at € per kWh**: —

The catalogue's examples use €0.20 per kWh.

#### Where each figure comes from

| Mode | Efficiency | Kind | Models | Source |
| --- | --- | --- | --- | --- |
| Double conversion, high-voltage mode | 25%: 95.4% · 50%: 96% · 75%: 95.7% · 100%: 95.4% | Typical curve, derived from the datasheet efficiency of 96% (AEC method) | all | AEC datasheet: AC/AC efficiency of the IST6-PM100 100 kW power module (the curve's shape) |
| Double conversion, low-voltage mode | 25%: 93.4% · 50%: 94% · 75%: 93.7% · 100%: 93.4% | Typical curve, derived from the datasheet efficiency of 94% (AEC method) | IST9 20 kVA · IST9 10 kVA · IST9 40 kVA | AEC datasheet: AC/AC efficiency of the IST6-PM100 100 kW power module (the curve's shape) |
| ECO | 99% | Datasheet figure, load not stated | all |  |

EMEA 2026 catalogue figures: Double conversion, high-voltage mode up to 96% · Double conversion, low-voltage mode up to 94% · ECO up to 99%.

Drag to turn

In 3D

## Look around the IST9 20 kVA

[Open full 3D · X-ray](https://www.aecups.com/assets/models3d/ist9-20/v59/)

Technical data

## Technical data IST9 20 kVA

Only this model's values, from the EMEA 2026 catalogue table.

**IST9 20 kVA · Technical data**

|  |  |
| --- | --- |
| General |  |
| Rated power (kVA / kW, high-voltage mode) | 20 / 20 |
| Rated power (kVA / kW, low-voltage mode) | 10 / 10 |
| Configuration | 3/3 · 3/1 · 1/1 |
| Input |  |
| Connection | 3W + N + PE (settable 1W + N + PE) |
| Voltage range (phase) | high-voltage mode 176–280 V full load, 80–176 V linear derating · low-voltage mode 90–155 V full load, 70–90 V derating |
| Frequency · power factor · THDi | 40–70 Hz · ≥ 0.99 · ≤ 3% resistive, ≤ 5% non-linear full load |
| Bypass | 50 / 60 Hz ± 10% · voltage ± 20% |
| Battery |  |
| Voltage | high-voltage mode ± 96 … ± 240 V DC (± 48 … ± 120 cells of 2 V, default ± 96) · low-voltage mode ± 96 … ± 120 V (± 48 … ± 60 cells, default ± 60) |
| Charging current | 1–10 A (default 4 A) |
| Output |  |
| Voltage | 220 / 230 / 240 V L-N, 380 / 400 / 415 V L-L (low-voltage mode 110 / 115 / 120 V); 3W + N + PE, settable 1W + N + PE |
| Frequency | tracks the bypass; 50 ± 0.1 or 60 ± 0.1 Hz in battery mode |
| Waveform · distortion · power factor | sine wave · ≤ 2% resistive full load · 1.0 |
| Transfer inverter ↔ bypass | < 1 ms synchronised · < 10 ms not synchronised |
| Inverter overload | ≤ 105% continuous · 105–110% 60 min · 110–130% 10 min · 130–155% 1 min · > 155% 200 ms · > 200% immediate |
| Bypass overload | < 130% continuous · 130–155% 1 min · > 155% 200 ms |
| System |  |
| Efficiency | up to 96% (high-voltage mode) · 94% (low-voltage mode) · 99% ECO |
| Display · cold start | touch screen · battery cold start fitted |
| Communication | RS232 · options: SNMP, RS485 + dry contact, protocol card for the approved lithium system, parallel card |
| Noise (20–25 °C) | ≤ 50 dB half load · ≤ 55 dB 75% and full load |
| Environment | −5 … 40 °C · 0–95% RH non-condensing · ≤ 2000 m |
| Dimensions (W × D × H) | 438 × 535 × 130 mm (3U) |
| Weight | 18.4 kg |

**IST9 20 kVA · Models**

| Item | IST9 20 kVA |
| --- | --- |
| kVA / kW (high-voltage mode) | 20 / 20 |
| kVA / kW (low-voltage mode) | 10 / 10 |
| Configuration | 3/3 · 3/1 · 1/1 |
| W × D × H (mm) | 438 × 535 × 130 |
| Weight | 18.4 kg |

— not stated in the user manual. Specifications are subject to change without notice.

#### **More technical details** ordering codes

Ordering codes

## Ordering codes IST9 20 kVA

**Ordering codes IST9 20 kVA**

| Code | Description |
| --- | --- |
| IST9-20 | IST9 20 kVA, 1:1 · 3:1 · 3:3, external batteries, with power distribution box and maintenance breaker |
| IST9-20-\[n\]X9 | As above with 2, 4, 6, 8 or 10 BBJ2 rack battery cabinets: n = 32, 64, 96, 128 or 160 × 12 V 9 Ah |
| PAR-IST9 | Parallel board |
| DRYCNT-IST3/9 · SNMP | Dry-contact relay board · internal SNMP board |
| BBJ2 | Rack battery cabinet, max. 16 × 12 V 9 Ah, 3U |

Questions

## Questions about the IST9 20 kVA

#### How many batteries can the IST9 20 kVA have?

With BBJ2 rack cabinets (3U, up to 16 × 12 V 9 Ah each): 32, 64, 96, 128 or 160 batteries with 2 to 10 cabinets (codes IST9-20-\[n\]X9). The battery box always goes below the UPS, with a DC battery switch between battery and UPS.

#### What does the IST9 20 kVA deliver in low-voltage mode?

10 kVA / 10 kW: in low-voltage mode (110 / 115 / 120 V phase) the catalogue halves the 20 kVA's rating. In high-voltage mode (220 / 230 / 240 V phase) it gives the full 20 kVA / 20 kW.

#### How long does a 20 kVA UPS like the IST9 20 kVA run?

2 to 24 minutes at full load (20 kW), and 5 to 56 minutes at half load, with the AEC battery options in the table: the battery chosen sets the figure. With 32 × 12 V 9 Ah · 2 × 16 (IST9-20-32X9): 2 minutes at 100% and 5 at 50%. For other loads and batteries use the backup-time tool.

#### How big is the AEC IST9 20 kVA and how much does it weigh?

The AEC IST9 20 kVA measures 438 × 535 × 130 mm (3U); weight: 18.4 kg (EMEA 2026 catalogue).

#### What is the ordering code of the AEC IST9 20 kVA?

In the EMEA 2026 catalogue the AEC IST9 20 kVA is listed as IST9-20, IST9-20-\[n\]X9; AEC gives the full code, batteries included, from the load and the backup time.

Related models

## The same range: IST9

[The whole range](https://www.aecups.com/en/products/ist9/)

[**IST9 10 kVA** 10 kVA](https://www.aecups.com/en/products/ist9/ist9-10k/) [**IST9 15 kVA** 15 kVA · smaller rating](https://www.aecups.com/en/products/ist9/ist9-15k/) **IST9 20 kVA** 20 kVA [**IST9 30 kVA** 30 kVA · larger rating](https://www.aecups.com/en/products/ist9/ist9-30k/) [**IST9 40 kVA** 40 kVA](https://www.aecups.com/en/products/ist9/ist9-40k/)

Batteries and cabinets: [BBJ2](https://www.aecups.com/en/products/battery-cabinets/bbj2/) [OZ Power 12 V 9 Ah](https://www.aecups.com/en/products/oz-power-vrla/oz-12v-9ah/) Accessories: [SNMP card](https://www.aecups.com/en/products/snmp-card/) [Dry contact card](https://www.aecups.com/en/products/dry-contact-card/) [External maintenance bypass](https://www.aecups.com/en/products/maintenance-bypass/)

Shared by the whole range, on the IST9 page: [how the power flows in each mode](https://www.aecups.com/en/products/ist9/#diagrams) · [the catalogue's photos and drawings](https://www.aecups.com/en/products/ist9/#gallery).

Read next: [Three-phase UPS: configurations, sizing and installation](https://www.aecups.com/en/blog/three-phase-ups/) [How to choose a UPS: type, runtime, phases and service](https://www.aecups.com/en/blog/how-to-choose-a-ups/) [Single- or three-phase UPS: which does your site need?](https://www.aecups.com/en/blog/single-vs-three-phase-ups/)

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need for the AEC IST9 20 kVA: we answer with the model and the batteries that fit. AEC International sells through distributors in about 80 countries and an agency in every Italian region: ask AEC which one serves your area.

[Contact us](https://www.aecups.com/en/contacts/?interest=Three-phase%20UPS&msg=About%20the%20AEC%20IST9%2020%20kVA%20(IST9)%3A%20%0AQuantity%3A%20#form) [+39 02 9415 8991](tel:+390294158991)