---
title: "3/1 UPS: three-phase in, single-phase out, 10–40 kVA | AEC"
url: https://www.aecups.com/en/products/three-phase-single-phase-ups/
description: "UPS with a 400 V three-phase input and a 230 V single-phase output (3/1), 10 to 40 kVA: IST9 in a 3U rack, IST7 10–40 tower, All-in-One 20 kVA with lithium."
language: en
---

3/1 · 10 to 40 kVA

# 3/1 UPS: three-phase in, single-phase out

A 3/1 UPS takes a 400 V three-phase supply and feeds the load on one 230 V phase. It is used where the load is single-phase but too large for a single-phase supply: the input current is shared by three phases, the output stays one circuit. AEC builds it from 10 to 40 kVA, in three ranges.

## The three AEC ranges that work in 3/1

### IST9

VRLA

10–40 kVA

Online UPS, rack / tower, 10–40 kVA

Details

### All-in-One

Lithium

20 kVA

UPS and lithium battery in one cabinet, 20 kVA

Details

### IST7 10–40

VRLA

10–40 kVA

Online UPS, double conversion, 10–40 kVA

Details

Comparison

## Which of the three for your load?

From each range's data in the EMEA 2026 catalogue. On all three the single-phase output is 220, 230 or 240 V.

**AEC 3/1 UPS side by side**

| Range | Ratings in 3/1 | Form, size and weight | How 3/1 is set | When to choose it |
| --- | --- | --- | --- | --- |
| [IST9](https://www.aecups.com/en/products/ist9/) | 10, 15, 20, 30, 40 kVA | 19-inch rack, 3U: 438 × 535 × 130 mm, 18.4 kg (10–20 kVA); 438 × 720 × 130 mm, 34.1 kg / 34.2 kg (30–40 kVA) | The mode is set with connector jumpers on the rear terminals and on the touchscreen. | When the UPS goes into a rack. |
| [IST7 10–40](https://www.aecups.com/en/products/ist7-10-40/) | 10, 20, 30, 40 kVA | Tower: 250 × 806 × 880 mm, 64 kg (10–20 kVA); 300 × 842 × 1250 mm, 102.5 kg (30–40 kVA) | Wiring, the optional connector jumpers, the screen and, on 30–40 kVA, the mode connector. | When a floor-standing tower is wanted, also with the batteries in the cabinet (S models). |
| [All-in-One](https://www.aecups.com/en/products/all-in-one/) | 20 kVA | Footprint 600 × 1000 mm (W × D); height 1110 mm on castors, 1000 mm without castors. | As the IST9 20 kVA inside it. | When UPS, switches and lithium battery must arrive as one cabinet: 15 to 60 minutes at 20 kW, by the number of modules. |

IST9

## How a unit is changed from 3/3 to 3/1

10–20 kVA work in 3/3, 3/1 or 1/1 mode; 30–40 kVA in 3/3 or 3/1 mode. The mode is set with connector jumpers on the rear terminals and on the touchscreen.

- 3/1 mode: three in, one out (10–40 kVA).
- Connector jumpers, 10–20 kVA: four jumper types (types 1–2 two-pin, 3–4 three-pin) for 3/3, 3/1 or 1/1 mode.
- Connector jumpers, 30–40 kVA: one 3-pin jumper type, used only in 3/1 mode; it short-circuits the three-phase bypass input and the three-phase output terminals.
- Set on the screen: work mode on the System management page. Output 3W + N + PE, settable to 1W + N + PE; input 3W + N + PE (on 10–20 kVA settable to 1W + N + PE).

IST7 10–40

## In 3/1 the output carries all the current on one phase

Single-phase bypass and output carry up to three times the phase current: neutral and output cables are larger.

**IST7 10–40: Single-phase output · 3/1 and 1/1**

| Model | AC input (A) (3/1) | Bypass input (A) | AC output (A) | Bypass · output breaker | N, bypass, output (mm²) | PE (mm²) |
| --- | --- | --- | --- | --- | --- | --- |
| IST7-10 | 19.5 | 58.6 | 45.6 | 80 A 1P · 80 A 1P | 16 | 2 × 10 |
| IST7-20 | 35.5 | 106.4 | 90.9 | 100 A 3P · 100 A 3P | 25 | 2 × 10 |
| IST7-30 | 65.7 | 197.1 | 136.4 | 250 A 1P · 200 A 1P | 2 × 25 | 25 |
| IST7-40 | 81.7 | 245.0 | 181.8 | 300 A 1P · 250 A 1P | 2 × 25 | 25 |

Input breaker and input live cable as 3/3. 1/1 on 10–20 kVA: input 58.6 A (10) and 106.4 A (20), cables 16 and 25 mm².

Next: [Guide: sizing the input, bypass and neutral in 3/1](https://www.aecups.com/en/blog/three-phase-in-single-phase-out-ups/) [UPS finder: supply, load and battery](https://www.aecups.com/en/tools/ups-finder/) [Three-phase UPS](https://www.aecups.com/en/products/three-phase-ups/) [Single-phase UPS](https://www.aecups.com/en/products/single-phase-ups/)

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need: we answer with the model and the batteries that fit.

[Contact us](https://www.aecups.com/en/contacts/#form) [+39 02 9415 8991](tel:+390294158991)
