---
title: "Three-phase UPS (3 phase), 400 V, 10 to 200 kVA | AEC"
url: https://www.aecups.com/en/products/three-phase-ups/
description: "AEC three-phase UPS for 400 V, 10 to 200 kVA: All-in-One with lithium, IST9 3U rack, IST7 10–40 and 60–200, IST7-T 100–200 kVA with isolation transformer."
language: en
---

400 V · 10 to 200 kVA

# Three-phase UPS, 400 V, 10 to 200 kVA

A three-phase UPS keeps 400 V loads running through a mains failure, from server rooms to production lines. AEC offers five online double-conversion ranges from 10 to 200 kVA: All-in-One with lithium built in, the IST9 3U rack unit, IST7 10–40 and 60–200, and IST7-T 100–200 kVA with an output isolation transformer. 3 years' warranty, 5 on the lithium ranges.

## Which range fits your load?

### All-in-One

Lithium

20 kVA

UPS and lithium battery in one cabinet, 20 kVA

Details

### IST9

VRLA

10–40 kVA

Online UPS, rack / tower, 10–40 kVA

Details

### IST7 10–40

VRLA

10–40 kVA

Online UPS, double conversion, 10–40 kVA

Details

### IST7 60–200

VRLA

60–200 kVA

Three-phase online UPS, double conversion, 60–200 kVA

Details

### IST7-T

VRLA

100–200 kVA

Online UPS with isolation transformer, 100–200 kVA

Details

Models

## One model, one page

Every rating has its own page: that model's technical data, ordering codes, batteries and the questions people ask.

**[All-in-One](https://www.aecups.com/en/products/all-in-one/)** 20 kVA [All-in-One 20 kVA](https://www.aecups.com/en/products/all-in-one/all-in-one-20k/)

**[IST9](https://www.aecups.com/en/products/ist9/)** 10–40 kVA [IST9 10 kVA](https://www.aecups.com/en/products/ist9/ist9-10k/) · [IST9 15 kVA](https://www.aecups.com/en/products/ist9/ist9-15k/) · [IST9 20 kVA](https://www.aecups.com/en/products/ist9/ist9-20k/) · [IST9 30 kVA](https://www.aecups.com/en/products/ist9/ist9-30k/) · [IST9 40 kVA](https://www.aecups.com/en/products/ist9/ist9-40k/)

**[IST7 10–40](https://www.aecups.com/en/products/ist7-10-40/)** 10–40 kVA [IST7-10](https://www.aecups.com/en/products/ist7-10-40/ist7-10k/) · [IST7-20](https://www.aecups.com/en/products/ist7-10-40/ist7-20k/) · [IST7-30](https://www.aecups.com/en/products/ist7-10-40/ist7-30k/) · [IST7-40](https://www.aecups.com/en/products/ist7-10-40/ist7-40k/)

**[IST7 60–200](https://www.aecups.com/en/products/ist7-60-200/)** 60–200 kVA [IST7-60](https://www.aecups.com/en/products/ist7-60-200/ist7-60k/) · [IST7-80](https://www.aecups.com/en/products/ist7-60-200/ist7-80k/) · [IST7-100](https://www.aecups.com/en/products/ist7-60-200/ist7-100k/) · [IST7-120](https://www.aecups.com/en/products/ist7-60-200/ist7-120k/) · [IST7-160](https://www.aecups.com/en/products/ist7-60-200/ist7-160k/) · [IST7-200](https://www.aecups.com/en/products/ist7-60-200/ist7-200k/)

**[IST7-T](https://www.aecups.com/en/products/ist7-t/)** 100–200 kVA [IST7T-100](https://www.aecups.com/en/products/ist7-t/ist7t-100k/) · [IST7T-120](https://www.aecups.com/en/products/ist7-t/ist7t-120k/) · [IST7T-200](https://www.aecups.com/en/products/ist7-t/ist7t-200k/)

Comparison

## Three-phase UPS: how do the ranges compare?

| Range | Ratings | Voltage | Description | Batteries |
| --- | --- | --- | --- | --- |
| [All-in-One](https://www.aecups.com/en/products/all-in-one/) | 20 kVA | 220 / 230 / 240 V L-N, 380 / 400 / 415 V L-L (IST9 20 kVA, 3/3 · 3/1) | UPS and lithium battery in one cabinet, 20 kVA | Lithium |
| [IST9](https://www.aecups.com/en/products/ist9/) | 10–40 kVA | 220 / 230 / 240 V L-N · 380 / 400 / 415 V L-L | Online UPS, rack / tower, 10–40 kVA | VRLA |
| [IST7 10–40](https://www.aecups.com/en/products/ist7-10-40/) | 10–40 kVA | L-N 220 / 230 / 240 V · L-L 380 / 400 / 415 V | Online UPS, double conversion, 10–40 kVA | VRLA |
| [IST7 60–200](https://www.aecups.com/en/products/ist7-60-200/) | 60–200 kVA | 220 / 230 / 240 V L-N · 380 / 400 / 415 V L-L | Three-phase online UPS, double conversion, 60–200 kVA | VRLA |
| [IST7-T](https://www.aecups.com/en/products/ist7-t/) | 100–200 kVA | 380 / 400 / 415 V L-L · 220 / 230 / 240 V L-N | Online UPS with isolation transformer, 100–200 kVA | VRLA |

Questions

## Questions people ask

#### Which three-phase AEC UPS should I choose?

The IST9 (10–40 kVA) is a 3U unit for 19-inch racks or towers, the IST7 10–40 kVA a floor-standing UPS with internal or external batteries. The IST7 60–200 kVA covers larger loads; the IST7-T (100–200 kVA) adds a built-in output isolation transformer; the All-in-One (20 kVA) puts UPS and lithium modules in one cabinet.

#### Which three-phase ranges can supply single-phase loads?

The IST9 and the IST7 10–40 kVA work in 3/3 or 3/1 mode, and their 10–20 kVA models also in 1/1. The All-in-One 20 kVA works 3/3 or 3/1 only.

#### How do the three-phase ranges compare on efficiency and power factor?

The IST9 and IST7 10–40 kVA reach 96% in double conversion and 99% in ECO mode, the IST7 60–200 kVA 96.5% and 99%, all with output power factor 1 (kVA = kW). The IST7-T is rated lower in kW than in kVA, for example 200 kVA / 180 kW.

#### Which ranges support parallel and redundant systems?

The IST7 10–40 kVA runs up to 4 units in parallel and the IST7 60–200 kVA up to 8 (1.6 MW), with BSC dual-bus synchronisation. The IST9 supports N+1 with its parallel card, and the IST7-T supports parallel, series hot standby and dual-bus systems.

#### What battery options do the three-phase ranges offer?

The IST9 uses BBJ2 rack cabinets or the approved lithium system. The IST7 10–40 kVA has internal batteries (S models) or BB4–BB8 cabinets; the IST7 60–200 kVA uses BB5–BB8 cabinets or lithium with the BMS card; the IST7-T uses an external battery, lithium supported. The All-in-One has lithium modules built in, up to 200 minutes at 6 kW.

Guides

## Guides: Three-phase UPS

[All guides](https://www.aecups.com/en/blog/)

[**Battery room ventilation to EN IEC 62485-2 for VRLA** The EN IEC 62485-2 air flow for a VRLA battery, term by term, worked out for every AEC BB4–BB8 cabinet, with the size of the openings.](https://www.aecups.com/en/blog/battery-room-ventilation/) [**L6 lithium battery sizing: modules, cabinets, room** How AEC sizes an L6 lithium battery for an IST7 or IST6 UPS: power and energy counts, modules and cabinets for 10 to 30 minutes, floor and clearances.](https://www.aecups.com/en/blog/l6-lithium-battery-sizing/) [**UPS installation clearances: what to check on site** Clearances, operating gangways, door widths, floor load, cable entry and airflow for every AEC EMEA UPS and battery cabinet, before the delivery.](https://www.aecups.com/en/blog/ups-installation-clearances/)

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need: we answer with the model and the batteries that fit.

[Contact us](https://www.aecups.com/en/contacts/#form) [+39 02 9415 8991](tel:+390294158991)
