Three choices, the supply (230 V single-phase or 400 V three-phase), the load in kVA and the battery (lithium or VRLA), and the EMEA 2026 catalogue tells you which of its ranges, from 1 kVA to 1.2 MVA, carry the load and which rating to order. The backup time has a tool of its own.

[Backup time](https://www.aecups.com/en/tools/backup-time/)

#### Product finder Find your UPS in three steps. Supply, load and battery: the range and the rating that fit, from the EMEA 2026 catalogue. Enter the load with headroom: AEC advises keeping it within about 80% of the UPS rating (16 kVA of load → 20 kVA). Open the finder Close

**Your supply**

**Your load 20 kVA**

1 10 100 1,200 kVA

**Battery**

5 ranges cover 20 kVA. Closest fit first.

[IST9](https://www.aecups.com/en/products/ist9/) 10–40 kVA · VRLA [Best fit **20 kVA** Online UPS, rack / tower, 10–40 kVA](https://www.aecups.com/en/products/ist9/#models) [Everything about the range](https://www.aecups.com/en/products/ist9/)

[IST7 10–40](https://www.aecups.com/en/products/ist7-10-40/) 10–40 kVA · VRLA [Best fit **20 kVA** Online UPS, double conversion, 10–40 kVA](https://www.aecups.com/en/products/ist7-10-40/#models) [Everything about the range](https://www.aecups.com/en/products/ist7-10-40/)

[All-in-One](https://www.aecups.com/en/products/all-in-one/) 20 kVA · lithium [Best fit **20 kVA** UPS and lithium battery in one cabinet, 20 kVA](https://www.aecups.com/en/products/all-in-one/#models) [Everything about the range](https://www.aecups.com/en/products/all-in-one/)

[IST6-120](https://www.aecups.com/en/products/ist6-120/) 30–120 kVA · VRLA [Best fit **30 kVA** 30 kVA modules](https://www.aecups.com/en/products/ist6-120/#models) [Everything about the range](https://www.aecups.com/en/products/ist6-120/)

[IST7 60–200](https://www.aecups.com/en/products/ist7-60-200/) 60–200 kVA · VRLA [Best fit **60 kVA** Three-phase online UPS, double conversion, 60–200 kVA](https://www.aecups.com/en/products/ist7-60-200/#models) [Everything about the range](https://www.aecups.com/en/products/ist7-60-200/)

How it works

## Three choices, one answer.

1. **Supply** 230 V single-phase or 400 V three-phase: the one at the panel.
2. **Load** In kVA, with a margin for inrush and growth.
3. **Battery** Lithium or VRLA lead-acid.
4. **Answer** The ranges that carry the load and the rating to order.

**1–1200** kVA, the whole EMEA range

**230 · 400 V** single- and three-phase

**Lithium · VRLA** two battery technologies

**1.0** power factor: kVA = kW

## What do you need to choose a UPS?

Three facts: the supply at the switchboard (230 V single-phase or 400 V three-phase), the load in kVA or watts, with a margin for inrush and growth, and the minutes of backup you need. The [UPS sizing guide](https://www.aecups.com/en/blog/ups-sizing/) works through the calculation step by step, with two examples.

## Talk to an AEC engineer

Tell us the load, the supply and the backup time you need: we answer with the model and the batteries that fit.

[Contact us](https://www.aecups.com/en/contacts/#form) [+39 02 9415 8991](tel:+390294158991)