# UPS guides from AEC engineers

25 guides on UPS types, sizing, batteries, US supplies and buildings, explained with real figures from the AEC 2026 catalog and the US user manuals. Start with what a UPS is and how to size one, or match your site to a series on the [applications](https://www.aecups.com/us/applications/) page.

By building and supply

## For the project in front of you.

### UPS for hospitals and clinics: 120/240 V, 208 V and 480 V

9 min read

Where a UPS fits in a US healthcare building: the 10-second generator gap, IT and nurse-call loads, 120 V to 480 V, and the AEC series for each.

### Data center UPS: modular, 480 V and lithium

8 min read

How to choose a data center UPS in the US: 480 V, modular N+X, efficiency in kWh, lithium cabinets and growth to megawatts, with AEC's figures.

### 208 V vs 480 V: choosing a three-phase UPS

7 min read

208Y/120 V or 480Y/277 V: what each supply is for, the current at 100 kVA (about 278 A against 120 A), 3-wire and 4-wire, and the AEC UPS for each.

### How long do UPS batteries last? VRLA and lithium

7 min read

Design life and real life of UPS batteries: VRLA 10 to 12 years on paper and much less in a warm room, LiFePO4 12 to 15 years, and when to replace.

### UPS for offices, retail and small business

9 min read

Protect a small office, a store or a clinic in the US: 120 V and 120/240 V UPS, NEMA receptacles, runtime packs, lithium or VRLA, and what to plug in.

### UPS glossary: the terms in plain English

12 min read

kVA, kW, power factor, double conversion, bypass, N+1, VRLA, LiFePO4, runtime, SNMP, EPO: the UPS terms engineers use, explained in one line each.

### kVA vs kW: what a UPS rating really means

7 min read

kVA, kW and power factor on a UPS nameplate, how to size by kW first, and the AEC ratings: 1.0 power factor on most series, 0.9 on LUMINA.

### How long will a UPS run? Battery runtime explained

8 min read

Why UPS runtime falls faster than load rises, lithium against VRLA on real AEC runtime tables, adding battery modules, and what ages the minutes.

### N+1 redundancy in modular and parallel UPS, explained

7 min read

N, N+1, N+X and 2N in plain words, how one modular UPS frame gives redundancy, and the AEC frames with modules from 15 to 100 kVA.

### UPS heat output: BTU/h, cooling and the cost of losses

7 min read

Work out a UPS's heat in BTU/h from its efficiency, size the cooling, and see the yearly kWh of losses, with a table of AEC models from 1 kVA to 1.5 MW.

### UPS amps: output current from kVA at 120, 208 and 480 V

7 min read

Work out a UPS's full-load current from its kVA and voltage, with tables for 120 V, 120/240 V split phase, 208 V and 480 V three-phase, from 1 kVA to 1.6 MW.

### Rack-mount UPS: depth, weight, lithium vs VRLA

7 min read

What to check before you put a UPS in a 19-inch rack: rack units, depth, weight, runtime, battery packs, with AEC LUMINA lithium and FERRUS RT figures.

### UPS maintenance checklist: monthly, quarterly, yearly

8 min read

What to check on a UPS and its batteries every month, quarter and year, what only a qualified technician should do, and how lithium changes the routine.

### How to read a UPS datasheet, line by line

7 min read

Rated power, power factor, input and output, topology, efficiency, DC bus, battery, runtime, size and weight: what each line of a UPS datasheet tells you.

### Growing a modular UPS: frames, modules and N+1

9 min read

How CIRRO, INFINITE and INFINITE 1.5MW grow module by module, the load where N+1 ends at each step, and which frame to buy on day one.

### Sizing an L6 lithium battery for an INFINITE UPS

7 min read

One 50 Ah L6 module per 10 kW for 15 minutes: modules and cabinets for INFINITE and INFINITE 1.5MW, weights, floor load and the room around them.

### UPS generator sizing: input, recharge and other loads

9 min read

How big a standby generator an AEC online UPS needs: the maximum input of each three-phase series, its input power factor, recharge and the other loads.

### Lithium UPS fire code: NFPA 855, UL 9540A and 20 kWh

8 min read

When a lithium UPS battery falls under NFPA 855 and IFC 1207: the 20 kWh line in nameplate kWh, every AEC lithium UPS against it, the L6 facts.

### ECO mode vs double conversion: what the load gives up

7 min read

What ECO mode does on an online UPS and what the load gives up, with the double-conversion efficiency of every AEC three-phase series, SiC included.

### 480 V UPS, 3-wire or 4-wire: the neutral explained

7 min read

Does a 480 V UPS need a neutral? 3-wire and 4-wire UPS compared: 277 V loads, neutral size, unswitched neutrals and the battery midpoint.

### Modular vs monolithic UPS, 208 V: space, N+1, service

7 min read

Modular or monolithic UPS for 30 to 80 kW at 208 V with N+1: towers in parallel against one modular frame, floor, weight and runtime from AEC's catalog.

The basics

## How a UPS works, and how to pick one.

### What is a UPS? Uninterruptible power supplies explained

10 min read

What an uninterruptible power supply (UPS) is, how it works, the three types (standby, line-interactive, online), where it sits and how to choose one.

### How to size a UPS: five steps to the power you need

10 min read

Size a UPS in five steps: load in watts, kVA and kW, voltage and phase, runtime, and room to grow. With a calculator.

### How to choose a UPS: six questions to one model

7 min read

Six questions that pick the right UPS: supply, power, runtime, form factor, battery and monitoring, with the AEC series that fit each case.

### Lithium UPS: lithium-ion (LiFePO4) vs VRLA, safety, codes and cost

9 min read

Lithium-ion UPS explained: LiFePO4 against VRLA on life, runtime, weight and cost, the US codes (UL 9540A, NFPA 855) and AEC's lithium range.

## Talk to an engineer

Tell us the load, the voltage and the minutes you need. We answer with the model and the batteries that fit.

[Send your project](https://www.aecups.com/us/contacts/#form) [+1 786 553 2100](tel:+17865532100)