---
title: "CIRRO-IB Modular UPS 30–150 kVA 480V 4W | AEC"
url: https://www.aecups.com/us/products/cirro-ib/
description: "CIRRO-IB is AEC's modular online UPS with N+X redundancy for three-phase 480 V, 4-wire loads from 30 to 150 kVA."
language: en-US
---

Three-phase 480 V UPS

# CIRRO-IB modular UPS, 30–150 kVA, 480 V

4-wire · 3P+N VRLA Modular N+X Modular

CIRRO-IB is AEC's modular online UPS with N+X redundancy for three-phase 480 V, 4-wire loads from 30 to 150 kVA, with internal hot-swappable VRLA battery trays. For 30 kVA modular at 480 V, the CIRIB150-1X30 is one 30 kVA power module in the frame; at 208 V it is the RADIANT RAD90-2X15, two 15 kVA modules.

**30–150** kVA

**96%** Efficiency, up to

**1.0** Power factor

**3 yr** Warranty

Datasheet Manuals and catalogs [Contact us](https://www.aecups.com/us/contacts/?interest=UPS%20three-phase&msg=About%20the%20CIRRO-IB%3A%20%0AQuantity%3A%20#form)

[**Try 3D** X-ray view](https://www.aecups.com/assets/models3d/cirib/v57/)

Drag to turn

In 3D

## Look around the CIRRO-IB

Drag it round, swipe on a phone or use the arrow keys. X-ray makes the enclosure see-through, so you can see what sits behind the panels.

[Open full 3D · X-ray](https://www.aecups.com/assets/models3d/cirib/v57/)

Rendered from AEC's 3D model of the CIRRO-IB 30–150 kVA. The full 3D view zooms in, opens the unit and names every part.

Hands on

## Open the CIRRO-IB yourself.

Click the unit: the door opens, then a module comes out. Drag to move it by hand. The 3D shows every part.

[Every part in 3D](https://www.aecups.com/assets/models3d/cirib/v57/)

Efficiency

## How efficient is the CIRRO-IB at your load?

The CIRRO-IB in normal double-conversion mode, from the 2026 catalog's efficiency curve. Drag along it to see the heat lost and its yearly cost.

**—** %

**Load**: —

**Lost as heat**: —

**Heat to remove**: —

**Energy lost in a year, 24/7**: —

**Its cost in a year at per kWh**: —

The display

## The CIRRO-IB display.

The real touchscreen, from the user manual: pick a main page, or touch the screen as on the UPS.

RADIANT · CIRRO · the real screen

### Home

The home page after the welcome window: status bar, output voltage gauges, battery bars, energy flow and warning information, with the main menu on the left.

**The ten main pages**

What is what

## Inside the CIRRO-IB, part by part.

Each number is named in the list under its picture: the front with its door open and the rear, side by side.

### Front, door open

1. **5 power-module slots** 30 kVA modules, hot-swappable; No. 1 at the bottom, No. 5 at the top.
2. **Bypass & monitoring module** Communication panel and fans.
3. **Battery trays, 4 per row × 6 rows = 24** Ten 12 V blocks in each tray.
4. **Touchscreen** On the door, seen here from inside.
5. **Base and anchor bolts** Four anchor bolts and no casters: the cabinet is moved with a pallet truck or a forklift.

### Rear, doors open

1. **Module backplane** The power modules seen from the rear, with their busbars.
2. **Battery breaker** Connects the internal battery trays to the DC bus of the power modules.
3. **Output, maintenance and input breakers** Left to right: output to the load; maintenance bypass, normally OFF, around the whole UPS for service; main input to the rectifiers.
4. **Terminal cover** Behind it the power terminals.
5. **Rear doors** Two: the breakers and the power terminals are reached from the rear.
6. **Touchscreen** 7-inch, on the front door.

Overview

## Key facts

**Power range**: 30–150 kVA

**Technology**: 3-level IGBT; unity power factor (kVA = kW); 40 A settable charger

**Input / Output**: 480/277 V three-phase, 4-wire

**Battery**: internal hot-swappable VRLA, up to 240 × 12V 9Ah (240 pcs)

**Display**: 7-inch color touchscreen

**Comms**: RS-232, EPO and USB, standard

**Power factor**: 1.0 (kVA = kW)

**Network card**: SNMP-M (SNMP)

**Warranty**: 3 years on UPS · 2 years on VRLA batteries

**Quality system**: ISO 9001:2015, the group's quality system (SGS)

Models

## Which CIRRO-IB fits your load?

5 models for the US market, from the 2026 catalog. Pick the power, open a model for its full datasheet.

[**CIRIB150-1X30** 30 kVA · 30 kW 1 × 30 kVA power module, 240 × 12 V 9 Ah VRLA blocks inside **2,191.8 lb** net weight **Internal Tray System** batteries Details and datasheet](https://www.aecups.com/us/products/cirro-ib/cirib150-1x30/) [**CIRIB150-2X30** 60 kVA · 60 kW 2 × 30 kVA power modules, 240 × 12 V 9 Ah VRLA blocks inside **2,243.8 lb** net weight **Internal Tray System** batteries Details and datasheet](https://www.aecups.com/us/products/cirro-ib/cirib150-2x30/) [**CIRIB150-3X30** 90 kVA · 90 kW 3 × 30 kVA power modules, 240 × 12 V 9 Ah VRLA blocks inside **2,295.8 lb** net weight **Internal Tray System** batteries Details and datasheet](https://www.aecups.com/us/products/cirro-ib/cirib150-3x30/) [**CIRIB150-4X30** 120 kVA · 120 kW 4 × 30 kVA power modules, 240 × 12 V 9 Ah VRLA blocks inside **2,347.8 lb** net weight **Internal Tray System** batteries Details and datasheet](https://www.aecups.com/us/products/cirro-ib/cirib150-4x30/) [**CIRIB150-5X30** 150 kVA · 150 kW 5 × 30 kVA power modules, 240 × 12 V 9 Ah VRLA blocks inside **2,399.8 lb** net weight **Internal Tray System** batteries Details and datasheet](https://www.aecups.com/us/products/cirro-ib/cirib150-5x30/)

### Options and parts for CIRRO-IB

- **CIRIB-BATTR-10x9A** Battery Tray incl. 10 × 12 V 9 Ah
- **CIRIB-BATTR-EMPTY** Battery Tray empty
- **CIRIB-FRAME** CIRRO-IB 150 kVA Frame — no power module, no battery trays, 5 module slots 23.6" W × 39.4" D × 78.7" H (600 × 1,000 × 2,000 mm) · 616 lb (279.4 kg)
- **CIRIB-PWR-30** Power Module 30 kVA — CIRRO-IB 17.3" W × 26.7" D × 3.4" H (440 × 678 × 85 mm) · 52 lb (23.6 kg)

Datasheet

## CIRRO-IB datasheet.

Every model side by side. Filter by power, keep only what differs, print it or take it as CSV.

**CIRRO-IB datasheet, 5 models**

| Model | [CIRIB150-1X30](https://www.aecups.com/us/products/cirro-ib/cirib150-1x30/) | [CIRIB150-2X30](https://www.aecups.com/us/products/cirro-ib/cirib150-2x30/) | [CIRIB150-3X30](https://www.aecups.com/us/products/cirro-ib/cirib150-3x30/) | [CIRIB150-4X30](https://www.aecups.com/us/products/cirro-ib/cirib150-4x30/) | [CIRIB150-5X30](https://www.aecups.com/us/products/cirro-ib/cirib150-5x30/) |
| --- | --- | --- | --- | --- | --- |
| Power |  |  |  |  |  |
| Rated power (kVA) | 30 | 60 | 90 | 120 | 150 |
| Active power (kW) | 30 | 60 | 90 | 120 | 150 |
| Output power factor | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 |
| Electrical |  |  |  |  |  |
| Input / output | 480 V three-phase, 4-wire (3P+N) | 480 V three-phase, 4-wire (3P+N) | 480 V three-phase, 4-wire (3P+N) | 480 V three-phase, 4-wire (3P+N) | 480 V three-phase, 4-wire (3P+N) |
| Topology | Online double conversion, modular N+X | Online double conversion, modular N+X | Online double conversion, modular N+X | Online double conversion, modular N+X | Online double conversion, modular N+X |
| Efficiency, up to | 96% | 96% | 96% | 96% | 96% |
| Battery DC bus | 480 V DC | 480 V DC | 480 V DC | 480 V DC | 480 V DC |
| Battery and runtime |  |  |  |  |  |
| Battery type | VRLA (sealed lead-acid) | VRLA (sealed lead-acid) | VRLA (sealed lead-acid) | VRLA (sealed lead-acid) | VRLA (sealed lead-acid) |
| Battery configuration | Internal Tray System | Internal Tray System | Internal Tray System | Internal Tray System | Internal Tray System |
| Runtime at 50 % load | 45 min | 14 min | 10.5 min | 6 min | 6 min |
| Runtime at 100 % load | 14 min | 6 min | 3 min | 2 min | — |
| Mechanical |  |  |  |  |  |
| Form factor | Modular | Modular | Modular | Modular | Modular |
| Dimensions W × D × H | 23.6 × 39.3 × 78.7 in (599 × 998 × 1,999 mm) | 23.6 × 39.3 × 78.7 in (599 × 998 × 1,999 mm) | 23.6 × 39.3 × 78.7 in (599 × 998 × 1,999 mm) | 23.6 × 39.3 × 78.7 in (599 × 998 × 1,999 mm) | 23.6 × 39.3 × 78.7 in (599 × 998 × 1,999 mm) |
| Net weight | 2,191.8 lb (994.2 kg) | 2,243.8 lb (1,017.8 kg) | 2,295.8 lb (1,041.4 kg) | 2,347.8 lb (1,065 kg) | 2,399.8 lb (1,088.6 kg) |
| Footprint | 6.4 ft² (0.60 m²) | 6.4 ft² (0.60 m²) | 6.4 ft² (0.60 m²) | 6.4 ft² (0.60 m²) | 6.4 ft² (0.60 m²) |
| Shipping |  |  |  |  |  |
| Cartons | 26 | 27 | 28 | 29 | 30 |

From the AEC 2026 catalog. Efficiency is the catalog's “up to” figure; runtimes are AEC's runtime tables with new batteries; weights are the unit alone, without batteries outside it. Figures can change: the order confirmation rules.

Install and run it: [CIRRO-IB installation and operation manual](https://www.aecups.com/us/support/guides/cirro-ib-manual/) [RADIANT and CIRRO touch screen guide](https://www.aecups.com/us/support/guides/radiant-cirro/)

Plan it: [Size it for your load](https://www.aecups.com/us/tools/ups-sizing/) [Room fit](https://www.aecups.com/us/tools/room-fit/) [CIRRO-IB compared with other makers](https://www.aecups.com/us/comparisons/ups-480v-30-150-kva-internal-batteries/) [Warranty terms](https://www.aecups.com/us/warranty/)

Replacing another brand's UPS? [Type its model number: the AEC match](https://www.aecups.com/us/cross-reference/)

CIRRO-IB: quick answers

## Questions people ask

#### What sizes does CIRRO-IB come in?

30 to 150 kVA, in 5 models of the 2026 catalog for the US, from the CIRIB150-1X30 (30 kVA) to the CIRIB150-5X30 (150 kVA). The datasheet on this page gives every one.

#### What supply does CIRRO-IB need?

480/277 V three-phase, 4-wire, for every model of the series. Its power factor is 1.0, so each model gives its kVA rating in kW.

#### What batteries does CIRRO-IB use?

Internal hot-swappable VRLA, up to 240 × 12 V 9 Ah blocks. The battery bus is 480 V DC on every model.

#### What warranty does CIRRO-IB have?

3 years on UPS; 2 years on VRLA batteries, from start-up. Register the UPS with AEC after start-up.

#### How is CIRRO-IB monitored over the network?

With the AEC SNMP-M network card, which reports the UPS status and alarms over SNMP to your monitoring software.

[How much power do 3 CIRIB150-1X30 give in parallel?](https://www.aecups.com/us/faq/cirro-ib/#q3) [What is the output current of each CIRRO-IB model?](https://www.aecups.com/us/faq/cirro-ib/#q1) [How much heat does each CIRRO-IB model give off?](https://www.aecups.com/us/faq/cirro-ib/#q2) [All 9 questions](https://www.aecups.com/us/faq/cirro-ib/)

Also in 480V three-phase UPS: [CIRRO](https://www.aecups.com/us/products/cirro/) [INFINITE](https://www.aecups.com/us/products/infinite/) [INFINITE 1.5MW](https://www.aecups.com/us/products/infinite-1-5mw/) [Compare the range](https://www.aecups.com/us/products/three-phase-ups-480v/)

Read next: [480 V UPS, 3-wire or 4-wire: the neutral explained](https://www.aecups.com/us/blog/480v-ups-3-wire-vs-4-wire/) [UPS generator sizing: input, recharge and other loads](https://www.aecups.com/us/blog/ups-generator-sizing/) [208 V or 480 V: choosing a three-phase UPS](https://www.aecups.com/us/blog/208v-vs-480v-ups/)

## The CIRRO-IB for your project

Send the load, the voltage and the minutes. We reply with the CIRRO-IB model that fits, its batteries and the lead time.

[Send your project](https://www.aecups.com/us/contacts/?interest=UPS%20three-phase&msg=About%20the%20CIRRO-IB%3A%20%0AQuantity%3A%20#form) [+1 786 553 2100](tel:+17865532100)
