---
title: "FERRUS SP Online UPS 6–20 kVA 120/240V | AEC"
url: https://www.aecups.com/us/products/ferrus-sp/
description: "FERRUS SP is AEC's online double-conversion UPS for split-phase 120/240 V loads from 6 to 20 kVA, in a tower cabinet, with VRLA batteries."
language: en-US
---

Split-phase 120/240 V UPS

# FERRUS SP online UPS, 6–20 kVA, 120/240 V

VRLA Online double conversion Tower

FERRUS SP is AEC's online double-conversion UPS for split-phase 120/240 V loads from 6 to 20 kVA, in a tower cabinet, with VRLA batteries. An isolation transformer and a manual maintenance bypass are built in; on the 6 and 10 kVA models, BB4US cabinets of 32, 64 or 80 blocks add minutes.

**6–20** kVA

**93%** Efficiency, up to

**1.0** Power factor

**3 yr** Warranty

Datasheet Manuals and catalogs [Contact us](https://www.aecups.com/us/contacts/?interest=UPS%20split-phase&msg=About%20the%20FERRUS%20SP%3A%20%0AQuantity%3A%20#form)

[**Try 3D** X-ray view](https://www.aecups.com/assets/models3d/fersp/v53/)

Drag to turn

In 3D

## Look around the FERRUS SP

Drag it round, swipe on a phone or use the arrow keys. X-ray makes the enclosure see-through, so you can see what sits behind the panels.

[Open full 3D · X-ray](https://www.aecups.com/assets/models3d/fersp/v53/)

Rendered from AEC's 3D model of the FERRUS SP 6–20 kVA. The full 3D view zooms in, opens the unit and names every part.

Efficiency

## How efficient is the FERRUS SP at your load?

The FERRUS SP in normal double-conversion mode, from the 2026 catalog's efficiency curve. Drag along it to see the heat lost and its yearly cost.

**—** %

**Load**: —

**Lost as heat**: —

**Heat to remove**: —

**Energy lost in a year, 24/7**: —

**Its cost in a year at per kWh**: —

The display

## The FERRUS SP display.

The real touchscreen, from the user manual: pick a main page, or touch the screen as on the UPS.

FERRUS SP · the real screen

### Home

Side menu (Home, Data, Set, Control; Engineer logged in), status bar (message, speaker icon, date and time), the power flow — input, bypass, rectifier, inverter, battery and load, green = active, gray = not active — and the input voltage (240 V) and the output voltage of the two legs (120/120 V).

**The ten main pages**

What is what

## Inside the FERRUS SP, part by part.

Each number on the picture is named in the list.

### Rear · 6 and 10 kVA

1. **Intelligent slots** Two slots for option cards, under their covers.
2. **Communication ports** RS-232, USB, EPO and the parallel ports: up to three units in parallel. Keep these cables away from the power cables.
3. **Maintenance bypass switch** UPS / BYPASS: feeds the load straight from the mains while the UPS is serviced.
4. **Input breakers** Three single-pole breakers, 63 A: Byp-L1 for the bypass line, Mains-L1 and I/P-L2 for the rectifier.
5. **Battery connector** BAT+ and BAT−, beside the terminal strip, for the BB4US cabinet.
6. **Terminal cover** Behind it the seven terminals: PE, input L1 and L2, output L1, N1, L2 and N2. Cables enter from below.
7. **Output surge protection** Resettable, above the outlets.
8. **Four twist-lock outlets** 2 × NEMA L5-30R (120 V, 30 A) and 2 × NEMA L6-30R (240 V, 30 A); to use both kinds at once, set output configuration 04.
9. **Transformer fan** The output transformer's fan blows out at the rear: keep 20 in (500 mm) free behind the tower.

### Rear · 20 kVA

1. **Maintenance bypass switch** UPS / BYPASS, standard: feeds the load straight from the mains while the UPS is serviced.
2. **Communication ports** RS-232, USB, EPO and the parallel ports P1 and P2: up to three units in parallel.
3. **Input breaker** Three-pole, 125 A: Byp-L1, Mains-L1 and I/P-L2.
4. **Terminal cover** Behind it two strips: output L1, N1, L2, N2 and PE; input L1, L2, PE and BAT+ / BAT−. Cables enter from below; all loads are hardwired.
5. **Battery breakers BAT1 and BAT2** One two-pole breaker for each internal string of twenty 12 V blocks.
6. **Transformer fans** They blow out at the rear: keep 20 in (500 mm) free behind the tower.

Overview

## Key facts

**Power range**: 6–20 kVA

**Comms**: RS-232, EPO and USB, standard

**Input / Output**: 120/240 V, split-phase

**Battery**: VRLA batteries

**Power factor**: 1.0 (kVA = kW)

**Network card**: SNMP-M (SNMP)

**Warranty**: 3 years on UPS · 2 years on VRLA batteries

**Quality system**: ISO 9001:2015, the group's quality system (SGS)

Models

## Which FERRUS SP fits your load?

3 models for the US market, from the 2026 catalog. Pick the power, open a model for its full datasheet.

[**FERSP6000-16X9** 6 kVA · 6 kW 16 × 9 Ah VRLA **196.2 lb** net weight **Internal** batteries Details and datasheet](https://www.aecups.com/us/products/ferrus-sp/fersp6000-16x9/) [**FERSP10000-16X9** 10 kVA · 10 kW 16 × 9 Ah VRLA **235.9 lb** net weight **Internal** batteries Details and datasheet](https://www.aecups.com/us/products/ferrus-sp/fersp10000-16x9/) [**FERSP20000-40X9** 20 kVA · 20 kW 40 × 9 Ah VRLA **452 lb** net weight **Internal** batteries Details and datasheet](https://www.aecups.com/us/products/ferrus-sp/fersp20000-40x9/)

### External battery cabinets

Each FERRUS SP model above has its own internal batteries. For the 6 and 10 kVA (192 V DC), an external battery cabinet can be added per UPS (BB4US, BB4US-32X9, BB4US-64X9, BB4US-80X9, listed below). The 20 kVA runs a 240 V DC bus, so the BB4US does not fit it: for a longer runtime it comes as **FERSP20000-EXT** (external battery model) or **FERSP20000-EMPTY** (its 40-battery cabinet supplied empty), with a battery bank AEC sizes for the load. [Ask us](https://www.aecups.com/us/contacts/#form) which set-up fits your load.

### Options and parts for FERRUS SP

- **BB4US** Battery Cabinet Tower 192 Vdc, empty 9.8" W × 33.5" D × 28.5" H (250 × 852 × 725 mm) · 110 lb (49.9 kg)
- **BB4US-32X9** Battery Cabinet Tower 192 Vdc, 32x 9 Ah 9.8" W × 33.5" D × 28.5" H (250 × 852 × 725 mm) · 297.2 lb (134.8 kg)
- **BB4US-64X9** Battery Cabinet Tower 192 Vdc, 64x 9 Ah 9.8" W × 33.5" D × 28.5" H (250 × 852 × 725 mm) · 484.4 lb (219.7 kg)
- **BB4US-80X9** Battery Cabinet Tower 192 Vdc, 80x 9 Ah 9.8" W × 33.5" D × 28.5" H (250 × 852 × 725 mm) · 578 lb (262.2 kg)

Datasheet

## FERRUS SP datasheet.

Every model side by side. Filter by power, keep only what differs, print it or take it as CSV.

**FERRUS SP datasheet, 3 models**

| Model | [FERSP6000-16X9](https://www.aecups.com/us/products/ferrus-sp/fersp6000-16x9/) | [FERSP10000-16X9](https://www.aecups.com/us/products/ferrus-sp/fersp10000-16x9/) | [FERSP20000-40X9](https://www.aecups.com/us/products/ferrus-sp/fersp20000-40x9/) |
| --- | --- | --- | --- |
| Power |  |  |  |
| Rated power (kVA) | 6 | 10 | 20 |
| Active power (kW) | 6 | 10 | 20 |
| Output power factor | 1.0 | 1.0 | 1.0 |
| Electrical |  |  |  |
| Input / output | 120/240 V split-phase | 120/240 V split-phase | 120/240 V split-phase |
| Topology | Online Double Conversion | Online Double Conversion | Online Double Conversion |
| Efficiency, up to | 93% | 93% | 93% |
| Battery DC bus | 192 V DC | 192 V DC | 240 V DC |
| Battery and runtime |  |  |  |
| Battery type | VRLA (sealed lead-acid) | VRLA (sealed lead-acid) | VRLA (sealed lead-acid) |
| Battery configuration | Internal | Internal | Internal |
| Runtime at 50 % load | 14.3 min | 7.5 min | 10 min |
| Runtime at 100 % load | 6 min | 3.2 min | 3 min |
| Mechanical |  |  |  |
| Form factor | Tower | Tower | Tower |
| Dimensions W × D × H | 9.9 × 23.6 × 29 in (252 × 599 × 738 mm) | 9.9 × 23.6 × 29 in (252 × 599 × 738 mm) | 15.8 × 28.7 × 38.7 in (401 × 729 × 983 mm) |
| Net weight | 196.2 lb (89 kg) | 235.9 lb (107 kg) | 452 lb (205 kg) |
| Footprint | 1.6 ft² (0.15 m²) | 1.6 ft² (0.15 m²) | 3.1 ft² (0.29 m²) |
| Shipping |  |  |  |
| Cartons | 1 | 1 | — |
| Shipping weight | 224.9 lb | 264.6 lb | — |

From the AEC 2026 catalog. Efficiency is the catalog's “up to” figure; runtimes are AEC's runtime tables with new batteries; weights are the unit alone, without batteries outside it. Figures can change: the order confirmation rules.

Install and run it: [FERRUS SP operating guide](https://www.aecups.com/us/support/guides/ferrus-sp/)

Plan it: [Size it for your load](https://www.aecups.com/us/tools/ups-sizing/) [Battery runtime](https://www.aecups.com/us/tools/battery-runtime/) [Room fit](https://www.aecups.com/us/tools/room-fit/) [FERRUS SP compared with other makers](https://www.aecups.com/us/comparisons/) [Warranty terms](https://www.aecups.com/us/warranty/)

Replacing another brand's UPS? [Type its model number: the AEC match](https://www.aecups.com/us/cross-reference/)

FERRUS SP: quick answers

## Questions people ask

#### What sizes does FERRUS SP come in?

6 to 20 kVA, in 3 models of the 2026 catalog for the US, from the FERSP6000-16X9 (6 kVA) to the FERSP20000-40X9 (20 kVA). The datasheet on this page gives every one.

#### What supply does FERRUS SP need?

120/240 V, split-phase, for every model of the series. Its power factor is 1.0, so each model gives its kVA rating in kW.

#### What batteries does FERRUS SP use?

VRLA batteries. The battery bus runs from 192 V DC to 240 V DC, by model.

#### What warranty does FERRUS SP have?

3 years on UPS; 2 years on VRLA batteries, from start-up. Register the UPS with AEC after start-up.

#### How is FERRUS SP monitored over the network?

With the AEC SNMP-M network card, which reports the UPS status and alarms over SNMP to your monitoring software.

[How much power do 3 FERSP6000-16X9 give in parallel?](https://www.aecups.com/us/faq/ferrus-sp/#q4) [What is the output current of each FERRUS SP model?](https://www.aecups.com/us/faq/ferrus-sp/#q1) [How much heat does each FERRUS SP model give off?](https://www.aecups.com/us/faq/ferrus-sp/#q2) [All 9 questions](https://www.aecups.com/us/faq/ferrus-sp/)

FERRUS SP in the field: [LUMINA and FERRUS SP for MARTA's data rooms in Atlanta](https://www.aecups.com/us/projects/lumina-ferrus-sp-marta-atlanta/) [All projects](https://www.aecups.com/us/projects/)

Also in 120/240V split-phase UPS: [FERRUS SP RT](https://www.aecups.com/us/products/ferrus-sp-rt/) [Compare the range](https://www.aecups.com/us/products/split-phase-ups-120-240v/)

Read next: [UPS amps: output current from kVA at 120, 208 and 480 V](https://www.aecups.com/us/blog/ups-amps-from-kva/) [UPS for hospitals and clinics: 120/240 V, 208 V and 480 V](https://www.aecups.com/us/blog/ups-for-hospitals-and-clinics/) [How to choose a UPS: six questions to one model](https://www.aecups.com/us/blog/choosing-the-right-ups/)

## The FERRUS SP for your project

Send the load, the voltage and the minutes. We reply with the FERRUS SP model that fits, its batteries and the lead time.

[Send your project](https://www.aecups.com/us/contacts/?interest=UPS%20split-phase&msg=About%20the%20FERRUS%20SP%3A%20%0AQuantity%3A%20#form) [+1 786 553 2100](tel:+17865532100)
