# LUMINA and FERRUS SP for MARTA's data rooms in Atlanta

56 LUMINA 2 kVA lithium rack UPS and 11 FERRUS SP 10 kVA split-phase UPS, all on the network, for MARTA's data rooms in Atlanta. Both ranges are online double conversion; the FERRUS SP adds an isolation transformer for its 120/240 V split-phase output.

Reviewed by **[Bruno Grosso](https://www.aecups.com/us/about/#bruno-grosso)** and **[Eng. CP Cheng](https://www.aecups.com/us/about/#cp-cheng)**, with an associate project engineer, AEC Engineering

For the data rooms of MARTA, the Metropolitan Atlanta Rapid Transit Authority, AEC supplied two ranges side by side: 56 LUMINA 2 kVA rack UPS with lithium batteries for the network racks, and 11 FERRUS SP 10 kVA split-phase UPS (240 V, VRLA batteries) for the larger loads.

Every UPS carries an SNMP network card. The supply included the PDUs and the management cabling.

**Where**: Atlanta, Georgia

**Sector**: Public transport

**Client**: MARTA (Metropolitan Atlanta Rapid Transit Authority)

**Load**: Data rooms and network equipment

**Equipment**: [11 × AEC FERRUS SP FERSP10000-16X9](https://www.aecups.com/us/products/ferrus-sp/fersp10000-16x9/)
[56 × AEC LUMINA LUM2000RT-2U-LI](https://www.aecups.com/us/products/lumina/lum2000rt-2u-li/)

Equipment

## The UPS of this project, from the catalog.

| Model | Units | Each | Form | Voltage | Battery | Efficiency | In this project |
| --- | --- | --- | --- | --- | --- | --- | --- |
| [AEC FERRUS SP FERSP10000-16X9](https://www.aecups.com/us/products/ferrus-sp/fersp10000-16x9/) | 11 | 10 kVA / 10 kW | Tower | 120/240V, split-phase | Internal VRLA | up to 93% | 110 kVA / 110 kW |
| [AEC LUMINA LUM2000RT-2U-LI](https://www.aecups.com/us/products/lumina/lum2000rt-2u-li/) | 56 | 2 kVA / 1.8 kW | Rack 2U | 120V, single-phase | Internal lithium (LiFePO4) | up to 92.5% | 112 kVA / 100.8 kW |

In all: 67 UPS, 222 kVA / 210.8 kW installed, 4,275 lb net. Unit ratings, form, battery and efficiency as the AEC catalog gives them for each model; the totals add them up.

In this project

## See the UPS in detail.

### FERRUS SP

VRLA

6–20 kVA · 120/240 V

Online double-conversion UPS for split-phase 120/240 V loads from 6 to 20 kVA, in a tower cabinet, with VRLA batteries.

View series

### LUMINA

Lithium

1–3 kVA · 120 V

Online double-conversion UPS for single-phase 120 V loads from 1 to 3 kVA, in a 19-inch rack, with internal LiFePO4 lithium batteries.

View series

More projects: [115 LUMINA UPS for the DeSoto County school servers](https://www.aecups.com/us/projects/lumina-lithium-desoto-county-schools/) [LUMINA and RADIANT-IB UPS at a Dominican resort](https://www.aecups.com/us/projects/lumina-radiant-dominican-resort/) [All projects](https://www.aecups.com/us/projects/)

## A project like this?

Send the load, the supply and the minutes. Our engineers reply with the UPS, the batteries and how we would test it.