---
title: "115 LUMINA UPS for the DeSoto County school servers | AEC"
url: https://www.aecups.com/us/projects/lumina-lithium-desoto-county-schools/
description: "115 LUMINA rack UPS with lithium batteries and SNMP network cards protect the servers of the DeSoto County schools."
language: en-US
---

Project · Education

# 115 LUMINA UPS for the DeSoto County school servers

115 LUMINA rack UPS with lithium batteries and SNMP network cards protect the servers of the DeSoto County schools, in Florida. Each is a 2U online double-conversion unit with its LiFePO4 battery inside and a 5-year warranty that includes the battery.

Reviewed by **[Bruno Grosso](https://www.aecups.com/us/about/#bruno-grosso)** and **[Eng. CP Cheng](https://www.aecups.com/us/about/#cp-cheng)**, with an associate project engineer, AEC Engineering

For the school servers of DeSoto County, Florida, AEC supplied 115 LUMINA 2U rack UPS with lithium (LFP) batteries, sized rack by rack: 41 of 1 kVA, 22 of 2 kVA and 52 of 3 kVA.

Every unit carries the SNMP network card, so each UPS can be read and managed over the network.

**Where**: DeSoto County, Florida

**Sector**: Education

**Client**: DeSoto County schools

**Load**: School servers

**Equipment**: [41 × AEC LUMINA LUM1000RT-2U-LI](https://www.aecups.com/us/products/lumina/lum1000rt-2u-li/)
[22 × AEC LUMINA LUM2000RT-2U-LI](https://www.aecups.com/us/products/lumina/lum2000rt-2u-li/)
[52 × AEC LUMINA LUM3000RT-2U-LI](https://www.aecups.com/us/products/lumina/lum3000rt-2u-li/)

Equipment

## The UPS of this project, from the catalog.

| Model | Units | Each | Form | Voltage | Battery | Efficiency | In this project |
| --- | --- | --- | --- | --- | --- | --- | --- |
| [AEC LUMINA LUM1000RT-2U-LI](https://www.aecups.com/us/products/lumina/lum1000rt-2u-li/) | 41 | 1 kVA / 0.9 kW | Rack 2U | 120V, single-phase | Internal lithium (LiFePO4) | up to 91.7% | 41 kVA / 36.9 kW |
| [AEC LUMINA LUM2000RT-2U-LI](https://www.aecups.com/us/products/lumina/lum2000rt-2u-li/) | 22 | 2 kVA / 1.8 kW | Rack 2U | 120V, single-phase | Internal lithium (LiFePO4) | up to 92.5% | 44 kVA / 39.6 kW |
| [AEC LUMINA LUM3000RT-2U-LI](https://www.aecups.com/us/products/lumina/lum3000rt-2u-li/) | 52 | 3 kVA / 2.7 kW | Rack 2U | 120V, single-phase | Internal lithium (LiFePO4) | up to 92.5% | 156 kVA / 140.4 kW |

In all: 115 UPS, 241 kVA / 216.9 kW installed, 230U of rack space, 3,424 lb net. Unit ratings, form, battery and efficiency as the AEC catalog gives them for each model; the totals add them up.

In this project

## See the UPS in detail.

### LUMINA

Lithium

1–3 kVA · 120 V

Online double-conversion UPS for single-phase 120 V loads from 1 to 3 kVA, in a 19-inch rack, with internal LiFePO4 lithium batteries.

View series

More projects: [LUMINA and FERRUS SP for MARTA's data rooms in Atlanta](https://www.aecups.com/us/projects/lumina-ferrus-sp-marta-atlanta/) [LUMINA and RADIANT-IB UPS at a Dominican resort](https://www.aecups.com/us/projects/lumina-radiant-dominican-resort/) [All projects](https://www.aecups.com/us/projects/)

## A project like this?

Send the load, the supply and the minutes. Our engineers reply with the UPS, the batteries and how we would test it.

[Send your project](https://www.aecups.com/us/contacts/#form) [+1 786 553 2100](tel:+17865532100)
