---
title: "UPS display simulators: ETHERNO, INFINITE, RADIANT | AEC"
url: https://www.aecups.com/us/tools/simulators/
description: "The real screens of AEC UPS displays, to try: ETHERNO, INFINITE, RADIANT and CIRRO, FERRUS SP, L6, LUMINA. States, main pages and guided tours."
language: en-US
---

Display simulators

# UPS display simulators: the screen before the UPS arrives.

The real screens of six AEC UPS displays, from their user manuals. Pick a display, then a UPS state or a main page, or touch the screen as on the UPS. Open to anyone.

## Pick a display

[**SNMP card set-up** the set-up program and the card's web page, step by step *Partner area*](https://www.aecups.com/us/partners/#tools)

UPS state

ETHERNO · the real screen

### Normal

Normal: the rectifier and inverter carry the load and charge the lithium modules.

**Main pages**

UPS state

INFINITE · the real screen

### Normal

Normal: mains, rectifier, inverter, output; the battery charges.

**Main pages**

RADIANT · CIRRO · the real screen

### Home

The home page after the welcome window: status bar, output voltage gauges, battery bars, energy flow and warning information, with the main menu on the left.

**The ten main pages**

FERRUS SP · the real screen

### Home

Side menu (Home, Data, Set, Control; Engineer logged in), status bar (message, speaker icon, date and time), the power flow — input, bypass, rectifier, inverter, battery and load, green = active, gray = not active — and the input voltage (240 V) and the output voltage of the two legs (120/120 V).

**The ten main pages**

L6 lithium cabinet · the real screen

### Home

The cabinets with their color (blue normal, yellow alarm, red protected, gray not connected), the system work mode, status, current, voltage and SOC. Tap a cabinet for its monitoring pages, or Sys. info for the system extremes.

**The ten main pages**

The display reads OUTPUT 120 Vac

### Inverter off and back on

Step 1 of 4

The UPS runs online on mains.

**You see** Mains icon lit, OUTPUT 120 Vac.

## Talk to an engineer

Tell us the load, the voltage and the minutes you need. We answer with the model and the batteries that fit.

[Send your project](https://www.aecups.com/us/contacts/#form) [+1 786 553 2100](tel:+17865532100)
