2 FERRUS SP procedures from the user manual, with the real screen at every step: start the UPS on utility power; read the UPS. Section numbers refer to the manual.

Start and stop

Start the UPS on utility powerBattery breaker, input breaker, about a minute to line mode, then the loads.§6.1.1 (p. 25), §4.2 (p. 17) · 7 steps
  1. Before the first start: the wiring is checked, the loads are switched off, and the battery number set matches the blocks installed (§5.3).

  2. Long-backup models: close the external battery breaker.

  3. Close the input breaker. The cooling fans start and the rectifier begins to start up.

    Home page
  4. About one minute later the UPS transfers to Line mode. If the utility is abnormal it runs in Battery mode without interrupting the output.

    You should see REC and INV green on the panel (§5.1).

    Home page
  5. Check the home page: power flow from the utility through the rectifier and inverter to the load, no alarm. Check the output voltage of the two legs.

    Press: Output voltage L1/L2

    You should see 120/120 V.

    Home page
  6. Switch on the loads one at a time (§4.2.3). Then check the load: open Data.

    Press: Data

    Home page
  7. Open Load.

    Press: Load

    You should see KVA, kW and % of each leg.

    Data, page 1

Daily use

Read the UPSInput, output, load and battery pages.Touchscreen (not in the v1.0 manual, readings as §5.2, p. 22) · 13 steps
  1. From the home page, open Data.

    Press: Data

    You should see Bypass, Input, Output, Load, Battery, Information.

    Home page
  2. Open Input: voltage L1–L2, current, frequency, power factor.

    Press: Input

    Data, page 1
  3. Back to the Data menu.

    Press: Back

    Data — Input
  4. Open Bypass: the bypass voltage and frequency.

    Press: Bypass

    Data, page 1
  5. Back.

    Press: Back

    Data — Bypass
  6. Open Output: voltage and current of L1/L2.

    Press: Output

    You should see 120.0/120.0 V, 60.00 Hz.

    Data, page 1
  7. Back.

    Press: Back

    Data — Output
  8. Open Load: kVA, kW and % per leg.

    Press: Load

    Data, page 1
  9. Back.

    Press: Back

    Data — Load
  10. Open Battery: voltage, capacity, remaining time.

    Press: Battery

    Data, page 1
  11. Back.

    Press: Back

    Data — Battery
  12. Open Information: DC bus, charger and temperatures.

    Press: Information

    Data, page 1
  13. Transformer temp.: the output isolation transformer; the rectifier and inverter IGBT temperatures below it.

    Press: Transformer temp. (°C)

    Data — Information

16 more FERRUS SP procedures, settings, commissioning, parallel systems and service, with the full display simulator, are in the AEC partner portal.

Alarms and buzzer

No.AlarmCause and action
1Battery not connectedCheck that the battery cables are connected correctly, the battery breaker / fuse is closed, and the batteries are not damaged.
2Emergency power off (EPO)Check that the EPO contact is closed correctly, or whether the EPO was operated.
3Inverter under-ratedThe hardware is not configured for the selected rated power.
4Input faultCheck that the utility input voltage and frequency are in range and the input and external breakers are closed. Restore the utility supply, or the output stops when the battery reaches end of discharge.
5Bypass phase sequence reversedCheck whether the bypass input is phase-reversed.
6Bypass abnormalBypass voltage or frequency out of the set range: check the bypass input supply and the bypass input breaker.
7Bypass faultBypass SCR open or shorted: contact AEC service.
8Bypass overloadReduce the load below 95 % of the rating.
9Bypass overload timeoutThe bypass overload lasted too long: the output has been switched off.
10Hourly transfer limit reached5 transfers in 1 hour: check the utility supply and the load.
11Output short circuitFaulty load or output breaker. Find and switch off the faulty load, check the breaker, then clear the fault to restart.
12Battery end of dischargeThe battery is discharged after a utility failure.
13Battery self-test failedCheck for active alarms; check that the battery can supply more than 20 s.
14Rectifier faultDC bus over/undervoltage, short circuit or IGBT open. Clear the fault; if it persists, contact AEC service.
15Inverter faultInverter voltage abnormal or IGBT open. Clear the fault; if it persists, contact AEC service.
16Rectifier over-temperatureHeatsink too hot or sensor disconnected: check fans, ventilation, sensor wiring and room temperature.
17Fan failureOne or more fans faulty or blocked: check each fan.
18OverloadInverter overloaded: remove non-critical loads, or the UPS transfers to bypass.
19Inverter overload timeoutThe UPS has transferred to bypass; if the bypass is also overloaded the output stops. Reduce the load: the UPS returns to the inverter.
20Inverter over-temperatureHeatsink too hot or sensor disconnected: check fans, ventilation, sensor wiring and room temperature.
21Low battery voltageBattery capacity low while on battery.
22Input neutral disconnected3 / 1 model only: the input neutral is missing or not connected.
23Bypass fan failureOne or more fans faulty or blocked: check each fan.
24Manual shutdownInverter switched off or transferred to bypass by hand.
25Battery or charger faultNo charger output: contact AEC service.
26EOD restart inhibitAutomatic restart after end of discharge is inhibited.
27Input overcurrent timeoutInput current above the limit for too long: the UPS goes to battery or bypass. Check the input voltage, the load and whether the source (transformer, generator) is too small; contact AEC service if needed.
31System power supply disabledNo output available.
32Relay open circuitInverter relay open.
33Relay short circuitInverter relay shorted.
34Inverter protectionInverter output voltage out of range or DC bus overvoltage.
35Parallel cable faultOne or more parallel cables disconnected.
36Synchronization signal lostContact AEC service.
37Current-sharing failureContact AEC service.
38Input current imbalanceContact AEC service.
39Maintenance breaker closedThe maintenance bypass switch is on BYPASS: the UPS has transferred to bypass and the inverter cannot start.
40Bypass over synchronizationBypass outside the synchronization range.
41Battery self-test in progressThe battery is being tested.
42Battery maintenance in progressThe battery is being maintained.
43Battery maintenance failedCheck for other alarms and that the battery capacity supports more than 20 s of discharge.
44Manual bypassThe UPS was transferred to bypass by hand.
45Battery reverse connectionBattery polarity reversed: check the battery pack polarity on BAT+ · BAT− with a voltmeter (§4.2.3).
46Scheduled shutdownAutomatic shutdown at the set time.
47BMS communication failureCheck the BMS communication wiring and that the BMS protocol matches the UPS.
48Output transformer over-temperatureCheck the ambient temperature and the load level; contact AEC service.
—Communication Abnormal (status bar)Touchscreen message, not in the v1.0 alarm list: the screen is not receiving data from the UPS controller. Restart the UPS; if it stays, contact AEC service.

Troubleshooting

The screen stays dark, no LEDs
  • No input and no battery, or the UPS is off: check the input breakers and the utility supply.
  • On battery, press COLD START on the rear panel.
The UPS runs on battery with utility present
  • Check the input voltage (176–275 V) and the input breaker; see alarm 4.
The load is on bypass
  • Read the alarm: overload (reduce the load), over-temperature (check vents and fans) or a manual bypass.
  • Return with Control › Function › Manual Transfer to Inverter once the cause is removed.
Short runtime
  • Let the battery recharge on utility power, run a battery test (alarm 13 if it fails); replace old batteries (§7.2).
No network access
  • Check Set › NetWork and the SNMP card (setting category 345, §5.3).
Wrong output voltage (120 V instead of 240 V or the reverse)
  • Check the output jumpers and the rated values (Set, page 2).
One leg overloaded, the other lightly loaded
  • Move 120 V loads to the lighter leg.
Parallel units do not share the load
  • Check the parallel cables (alarm 35) and that each unit has its own ID and the same settings.
"Communication Abnormal" in the status bar
  • The screen is not receiving data from the UPS controller: restart the UPS; if it stays, contact AEC service.

Practice

Follow it on the display.

Short guided tours on the real FERRUS SP display.

Home page

Home page

Start the UPS on utility power

Step 1 of 7

Before the first start

The wiring is checked, the loads are switched off, and the battery number set matches the blocks installed.

Need a technician?

AEC service supports commissioning, maintenance and 24/7 after-sales: tell us the UPS and what it shows.