Tools

UPS tools: size, compare and try before it ships

The tools AEC engineers use, in the order of a project: size the UPS, specify it, decide on the battery, service it. Most are open to everyone; the full versions are for AEC partners.

7tools8hands-on explorers8live diagramsFreeto size and compare
MainsRectifierAC→DC BatteryDC bus InverterDC→AC Static switchLoad Static bypass
Online double conversion: the load always runs on the inverter; the battery sits on the DC bus.

Quick calculator

Amps, kVA and kW in one line.

Type the rating, pick the supply: the current per phase and the real power, with the waveform of that supply.

At the UPS output, full load. The input current is higher by the losses and the battery charge; breakers and cables follow the manual and local code. See the UPS for this supply · Size it properly

Current per phase—
Real power—
Formula—

Talk to an engineer

Tell us the load, the voltage and the minutes you need. We answer with the model and the batteries that fit.