Split-phase 120/240 V UPS

FERRUS SP online UPS, 6–20 kVA, 120/240 V

VRLAOnline double conversionTower

FERRUS SP is AEC's online double-conversion UPS for split-phase 120/240 V loads from 6 to 20 kVA, in a tower cabinet, with VRLA batteries. An isolation transformer and a manual maintenance bypass are built in; on the 6 and 10 kVA models, BB4US cabinets of 32, 64 or 80 blocks add minutes.

6–20kVA
93%Efficiency, up to
1.0Power factor
3 yrWarranty
AEC FERRUS SP, rendered from its 3D modelDrag to turn

In 3D

Look around the FERRUS SP

Drag it round, swipe on a phone or use the arrow keys. X-ray makes the enclosure see-through, so you can see what sits behind the panels.

Rendered from AEC's 3D model of the FERRUS SP 6–20 kVA. The full 3D view zooms in, opens the unit and names every part.

Efficiency

How efficient is the FERRUS SP at your load?

The FERRUS SP in normal double-conversion mode, from the 2026 catalog's efficiency curve. Drag along it to see the heat lost and its yearly cost.

—%

Load
—
Lost as heat
—
Heat to remove
—
Energy lost in a year, 24/7
—
Its cost in a year at per kWh
—

The display

The FERRUS SP display.

The real touchscreen, from the user manual: pick a main page, or touch the screen as on the UPS.

Home

FERRUS SP · the real screen

Home

Side menu (Home, Data, Set, Control; Engineer logged in), status bar (message, speaker icon, date and time), the power flow — input, bypass, rectifier, inverter, battery and load, green = active, gray = not active — and the input voltage (240 V) and the output voltage of the two legs (120/120 V).

The ten main pages

What is what

Inside the FERRUS SP, part by part.

Each number on the picture is named in the list.

Rear · 6 and 10 kVA

AEC FERRUS SP 6 and 10 kVA, rear panel: option slots, communication ports, maintenance bypass switch, input breakers, terminal cover, twist-lock outlets and the transformer fan
  1. Intelligent slotsTwo slots for option cards, under their covers.
  2. Communication portsRS-232, USB, EPO and the parallel ports: up to three units in parallel. Keep these cables away from the power cables.
  3. Maintenance bypass switchUPS / BYPASS: feeds the load straight from the mains while the UPS is serviced.
  4. Input breakersThree single-pole breakers, 63 A: Byp-L1 for the bypass line, Mains-L1 and I/P-L2 for the rectifier.
  5. Battery connectorBAT+ and BAT−, beside the terminal strip, for the BB4US cabinet.
  6. Terminal coverBehind it the seven terminals: PE, input L1 and L2, output L1, N1, L2 and N2. Cables enter from below.
  7. Output surge protectionResettable, above the outlets.
  8. Four twist-lock outlets2 × NEMA L5-30R (120 V, 30 A) and 2 × NEMA L6-30R (240 V, 30 A); to use both kinds at once, set output configuration 04.
  9. Transformer fanThe output transformer's fan blows out at the rear: keep 20 in (500 mm) free behind the tower.

Rear · 20 kVA

AEC FERRUS SP 20 kVA with internal batteries, rear panel: maintenance bypass, communication ports, input breaker, terminal cover, battery breakers and transformer fans
  1. Maintenance bypass switchUPS / BYPASS, standard: feeds the load straight from the mains while the UPS is serviced.
  2. Communication portsRS-232, USB, EPO and the parallel ports P1 and P2: up to three units in parallel.
  3. Input breakerThree-pole, 125 A: Byp-L1, Mains-L1 and I/P-L2.
  4. Terminal coverBehind it two strips: output L1, N1, L2, N2 and PE; input L1, L2, PE and BAT+ / BAT−. Cables enter from below; all loads are hardwired.
  5. Battery breakers BAT1 and BAT2One two-pole breaker for each internal string of twenty 12 V blocks.
  6. Transformer fansThey blow out at the rear: keep 20 in (500 mm) free behind the tower.

Overview

Key facts

Power range
6–20 kVA
Comms
RS-232, EPO and USB, standard
Input / Output
120/240 V, split-phase
Battery
VRLA batteries
Power factor
1.0 (kVA = kW)
Network card
SNMP-M (SNMP)
Warranty
3 years on UPS · 2 years on VRLA batteries
Quality system
ISO 9001:2015, the group's quality system (SGS)

Models

Which FERRUS SP fits your load?

3 models for the US market, from the 2026 catalog. Pick the power, open a model for its full datasheet.

External battery cabinets

Each FERRUS SP model above has its own internal batteries. For the 6 and 10 kVA (192 V DC), an external battery cabinet can be added per UPS (BB4US, BB4US-32X9, BB4US-64X9, BB4US-80X9, listed below). The 20 kVA runs a 240 V DC bus, so the BB4US does not fit it: for a longer runtime it comes as FERSP20000-EXT (external battery model) or FERSP20000-EMPTY (its 40-battery cabinet supplied empty), with a battery bank AEC sizes for the load. Ask us which set-up fits your load.

Options and parts for FERRUS SP

  • BB4USBattery Cabinet Tower 192 Vdc, empty9.8" W × 33.5" D × 28.5" H (250 × 852 × 725 mm) · 110 lb (49.9 kg)
  • BB4US-32X9Battery Cabinet Tower 192 Vdc, 32x 9 Ah9.8" W × 33.5" D × 28.5" H (250 × 852 × 725 mm) · 297.2 lb (134.8 kg)
  • BB4US-64X9Battery Cabinet Tower 192 Vdc, 64x 9 Ah9.8" W × 33.5" D × 28.5" H (250 × 852 × 725 mm) · 484.4 lb (219.7 kg)
  • BB4US-80X9Battery Cabinet Tower 192 Vdc, 80x 9 Ah9.8" W × 33.5" D × 28.5" H (250 × 852 × 725 mm) · 578 lb (262.2 kg)

Datasheet

FERRUS SP datasheet.

Every model side by side. Filter by power, keep only what differs, print it or take it as CSV.

FERRUS SP datasheet, 3 models
ModelFERSP6000-16X9FERSP10000-16X9FERSP20000-40X9
Power
Rated power (kVA)61020
Active power (kW)61020
Output power factor1.01.01.0
Electrical
Input / output120/240 V split-phase120/240 V split-phase120/240 V split-phase
TopologyOnline Double ConversionOnline Double ConversionOnline Double Conversion
Efficiency, up to93%93%93%
Battery DC bus192 V DC192 V DC240 V DC
Battery and runtime
Battery typeVRLA (sealed lead-acid)VRLA (sealed lead-acid)VRLA (sealed lead-acid)
Battery configurationInternalInternalInternal
Runtime at 50 % load14.3 min7.5 min10 min
Runtime at 100 % load6 min3.2 min3 min
Mechanical
Form factorTowerTowerTower
Dimensions W × D × H9.9 × 23.6 × 29 in (252 × 599 × 738 mm)9.9 × 23.6 × 29 in (252 × 599 × 738 mm)15.8 × 28.7 × 38.7 in (401 × 729 × 983 mm)
Net weight196.2 lb (89 kg)235.9 lb (107 kg)452 lb (205 kg)
Footprint1.6 ft² (0.15 m²)1.6 ft² (0.15 m²)3.1 ft² (0.29 m²)
Shipping
Cartons11—
Shipping weight224.9 lb264.6 lb—

From the AEC 2026 catalog. Efficiency is the catalog's “up to” figure; runtimes are AEC's runtime tables with new batteries; weights are the unit alone, without batteries outside it. Figures can change: the order confirmation rules.

FERRUS SP: quick answers

Questions people ask

What sizes does FERRUS SP come in?

6 to 20 kVA, in 3 models of the 2026 catalog for the US, from the FERSP6000-16X9 (6 kVA) to the FERSP20000-40X9 (20 kVA). The datasheet on this page gives every one.

What supply does FERRUS SP need?

120/240 V, split-phase, for every model of the series. Its power factor is 1.0, so each model gives its kVA rating in kW.

What batteries does FERRUS SP use?

VRLA batteries. The battery bus runs from 192 V DC to 240 V DC, by model.

What warranty does FERRUS SP have?

3 years on UPS; 2 years on VRLA batteries, from start-up. Register the UPS with AEC after start-up.

How is FERRUS SP monitored over the network?

With the AEC SNMP-M network card, which reports the UPS status and alarms over SNMP to your monitoring software.

The FERRUS SP for your project

Send the load, the voltage and the minutes. We reply with the FERRUS SP model that fits, its batteries and the lead time.