Tool

UPS sizing calculator

The supply and the load are enough: the AEC models that carry it appear below, closest size first, with their runtime. Add the build, the battery or the minutes you need, or start from the UPS you are replacing.

1 · Supply
In
Build (optional)
Battery (optional)
Or start from the application: it fills in the filters, change any of them
Advanced filters Runtime, size and weight, N+1, efficiency, wiring, communication, outlets
Redundancy
N+1: modular frames carry the load with one power module out.
Size units
Output connection

From the AEC 2026 catalog. Runtimes are the catalog's tables with new batteries, read at your load; the size and weight are the catalog's. Our engineers confirm every sizing, battery bank included.

APC, Vertiv, Eaton and the other names typed in the model search are trademarks of their owners; AEC is not affiliated with them. An equivalent is found by published ratings only.

How the tool sizes

Your load is turned into kW and kVA with its power factor; amps are read at the supply voltage (× 1.732 on three-phase). The growth margin is added, and the model must carry the result in both kW and kVA, kept at or below 80 % of its rating unless you untick that rule.

Models are ranked by rating, the closest above your need first, one line per size; set-ups of the same size are listed under it. Runtime is read off each model's catalog table at your load. Models on external battery cabinets show the catalog's standard banks, at the full rating, or "runtime sized to order".

With N+1, a modular frame counts one power module less than it holds. AEC lithium and VRLA units are unity power factor (kVA = kW) except LUMINA, at 0.9.

Read the five-step sizing guide · Look up another brand's model

SupplyPowerAEC series
Single-phase 120 V1–3 kVALUMINA, FERRUS, FERRUS RT
Split-phase 120/240 V6–20 kVAFERRUS SP, FERRUS SP RT
Three-phase 208 V10–100 kVAETHERNO, AUREON, RADIANT, RADIANT-IB
Three-phase 480 V30–1,600 kVACIRRO-IB, CIRRO, INFINITE, INFINITE 1.5MW

Want us to check it?

Send the load list and the supply. An engineer replies with the model and the battery bank.