Conformal-coated electronics
UPS (uninterruptible power supply)
Equipment that keeps a load powered from a battery when the utility fails, and conditions the power the rest of the time.
Online double conversion
The UPS type in which the rectifier turns AC to DC and the inverter rebuilds AC all the time, so the load never sees the utility and there is no transfer time. Every AEC UPS works this way.
Line-interactive
A UPS that corrects sags and surges with an autotransformer and switches to battery when the utility is lost, with a short transfer.
Offline (standby)
A UPS that leaves the load on the utility and switches to battery and inverter on a failure.
Rectifier
The input stage that converts the utility's AC to DC for the inverter and the battery charger.
Inverter
The output stage that builds the AC sine wave from the DC bus.
Static bypass
An electronic switch that moves the load to the utility automatically if the inverter is overloaded or faulty.
Maintenance bypass
A manual path that keeps the load powered from the utility while technicians service the UPS.
External maintenance bypass
A bypass panel outside the UPS cabinet, so the UPS can be isolated, even removed, while the load stays on the utility.
Automatic transfer switch (ATS)
The switch that moves a building or a panel from the utility to the generator and back.
Static transfer switch (STS)
An electronic switch that moves a single-corded load between two sources in a fraction of a cycle, used with two UPS systems.
PDU (power distribution unit)
The panel, often with a transformer, or the rack strip that distributes UPS power to the loads.
kVA
Apparent power: volts times amps, in thousands.
kW
Real power, the part that does work. kW = kVA × power factor.
Power factor
The ratio of real to apparent power. Most AEC series are rated at 1.0, so kVA equals kW; LUMINA at 0.9.
Input power factor
The power factor the UPS presents to its supply. Near 1, the generator and the cables carry little current beyond the real power: INFINITE 1.5MW is above 0.99.
Efficiency
Output power divided by input power. The rest is lost as heat: INFINITE reaches 97.3 %, INFINITE 1.5MW 97.5 % and CIRRO up to 97 %.
Losses
The input power a UPS does not deliver to the load, all of it heat: load × (1 ÷ efficiency − 1).
BTU/h
British thermal units per hour, the US unit of heat for cooling: watts × 3.412. A ton of cooling is 12,000 BTU/h.
ECO mode
A high-efficiency mode in which the load runs on the bypass and the inverter takes over on a disturbance.
Runtime (autonomy)
How long the battery carries a given load. It falls faster than the load rises.
Transfer time
The break in output when a UPS switches source; zero in online double conversion.
Overload capacity
How much more than its rating a UPS carries, and for how long, before it goes to bypass. INFINITE 1.5MW: 105 % continuously, 110 % for 60 minutes, 125 % for 10, 150 % for 1.
Inrush current
The surge a motor, a transformer or a power supply draws when it is switched on, several times its running current.
Modular UPS
A frame of identical power modules that share the load and can be added or swapped while it runs.
N+1, N+X
Redundancy: one (or X) more module or unit than the load needs, so one can fail without dropping the load.
2N
Two complete UPS systems, each able to carry the whole load, usually on two separate feeds.
Concurrently maintainable
A design in which any part can be taken out for maintenance without shutting the load down.
Single point of failure
One component whose failure drops the load, such as a shared bypass or a single input feed.
Parallel operation
Two or more UPS units sharing one load for more power or redundancy; INFINITE runs up to three 200 kVA frames in parallel (600 kVA), INFINITE 1.5MW up to eight frames.
Hot-swap
Removing and inserting a module or battery while the UPS keeps the load powered.
Power module
The plug-in rectifier, inverter and charger section of a modular UPS: 15 kVA in RADIANT, 20 kVA in RADIANT-IB, 30 kVA in CIRRO-IB, 60 or 100 kVA in CIRRO, 100 kVA in INFINITE, 125 kVA in INFINITE 1.5MW.
Frame
The cabinet of a modular UPS that holds the power modules, the bypass and the controls, rated for the most modules it takes.
Parallel kit
The cables and interface that let two or more UPS units share one load; AEC offers them for ETHERNO, AUREON and CIRRO.
VRLA (AGM)
Valve-regulated lead-acid battery with the electrolyte held in glass mat; sealed and maintenance-free. Design life 10 to 12 years at 25 °C (77 °F).
High-rate battery
A lead-acid block built for the short, heavy discharges of a UPS. AEC's published runtimes are based on high-rate cells; a general-purpose block of the same size gives fewer minutes.
Battery string
Blocks connected in series to reach the DC bus voltage. One failed block can take the whole string out.
Float charge
The constant voltage that holds a charged battery full between outages.
LiFePO4
Lithium iron phosphate, the lithium chemistry used for stationary storage for its thermal stability and long cycle life.
Ah (ampere-hour)
Battery capacity: the current a battery delivers over a given time. AEC's lithium modules are 50 Ah, its VRLA blocks 12 V 9 Ah.
kWh
Stored energy. One AEC 50 Ah lithium module holds 2.88 kWh nominal and is rated 10 kW for 15 minutes; a 20-module L6 cabinet holds 58 kWh.
DC bus
The direct-current link between the rectifier, the battery and the inverter: 240 V DC on ETHERNO, 480 V DC on CIRRO and INFINITE, 600 V DC on INFINITE 1.5MW.
BMS (battery management system)
The electronics that watch a lithium battery's cells, balance them and protect them.
State of charge (SOC)
How full a battery is, in percent; a lithium BMS reports it.
State of health (SOH)
How much of its original capacity a battery has left.
DC/DC converter
In an L6 lithium module, the stage that isolates the module and matches its voltage to the bus, so a fault stays inside the module.
Thermal runaway
A failure in which a cell's heat drives a reaction that makes more heat. LiFePO4 is among the more stable lithium chemistries; lead-acid can do it too, when overcharged in a hot room.
Design life
How long a battery is designed to last under reference conditions, usually 25 °C (77 °F); service life in a real room is often shorter.
End of life (battery)
By the usual definition, the point at which capacity has fallen to 80 % of the rating; IEEE 1188 uses it for replacing VRLA batteries.
Cycle
One discharge and recharge of a battery.
Battery cabinet
An enclosure for external batteries beside the UPS: BB4US for FERRUS SP, the L6 cabinet for lithium.
Battery compensation kit
A kit that compensates the battery string voltage on long cable runs between a three-phase UPS and its external bank.
Cold start
Starting a UPS from its battery with no utility present.
EPO (emergency power off)
An input that shuts the UPS output down from a remote button, as codes may require in IT rooms.
Surge protective device (SPD)
A device that limits transient overvoltage at the UPS input; AEC offers one for its three-phase UPS.
SNMP
The network protocol a UPS card uses to report status and alarms to monitoring software.
Modbus
An industrial protocol that connects a UPS to building management systems.
Modbus TCP/IP
Modbus over Ethernet. AEC's SNMP cards speak it alongside SNMP.
BACnet
The building automation protocol of many US building management systems; INFINITE 1.5MW has it as standard.
Dry contacts
Simple relay outputs that signal UPS states (on battery, low battery, fault) to other equipment.
THDi
Total harmonic distortion of the input current: how much the UPS distorts the supply it draws from.
Generator compatibility
How well a UPS runs on generator power: a wide input frequency window, a high input power factor and a low THDi all help.
Crest factor
The ratio of a load's peak current to its RMS current; IT loads have a high one.
3-level IGBT
An inverter topology that switches through three voltage levels, for lower losses and a cleaner output.
SiC (silicon carbide)
A semiconductor that switches faster with lower losses than silicon; the reason INFINITE reaches 97.3 % efficiency and INFINITE 1.5MW 97.5 %.
Split phase (120/240 V)
The US single-phase service with two 120 V legs and 240 V between them.
208Y/120 V
The US three-phase supply of most commercial buildings.
480Y/277 V
The US three-phase supply of large commercial and industrial buildings.
Wye (4-wire)
A three-phase supply with a neutral, such as 208Y/120 V and 480Y/277 V.
Delta (3-wire)
A three-phase supply without a neutral, such as the 480 V input and output of INFINITE.
Separately derived system
A source with no direct connection to the supply's conductors, such as the output of an isolation transformer; it gets its own neutral-to-ground bond under NEC Article 250.
NEMA 5-15R, 5-20R, L5-30R
US receptacles for 15 A, 20 A and 30 A (locking) 120 V plugs.
Rack unit (U)
1.75 in of height in a 19-inch rack. A 2U UPS such as LUMINA is 3.4 in tall.
UL 9540
The US safety standard for energy storage systems, with UL 9540A as its fire test method.
UL 1778
The US safety standard for uninterruptible power systems.
UL 1973
The US safety standard for stationary batteries, lithium modules included.
NFPA 855
The US standard for installing stationary energy storage. It applies above 20 kWh of lithium-ion in a room, or 70 kWh of lead-acid.
NFPA 70 (NEC)
The National Electrical Code: wiring and overcurrent protection, with emergency systems in Article 700, legally required standby in 701 and health care facilities in 517.
NFPA 110
The US standard for emergency and standby generator systems. Level 1, Type 10 means life-critical loads back on generator power within 10 seconds.
NFPA 99
The Health Care Facilities Code, which sets the essential electrical system of hospitals and clinics.
IEC 62040-3
The international performance standard for UPS, which classes them VFD, VI or VFI; online double conversion is VFI.
IEEE 1188
The US recommended practice for maintaining, testing and replacing VRLA batteries.

Most of these terms are inputs of the tools: the UPS sizing tool takes the load in kW, kVA or amps, the supply, the runtime and N+1; the battery runtime tool reads the minutes of a bank of 12 V VRLA blocks from the block's own discharge table; the room fit tool places a model in the room with its clearances and NEC 110.26 working space.

Missing a term? Ask our engineers, or read what a UPS is and how to size one.

Questions people ask

What is the difference between kVA and kW?

kVA is apparent power (volts × amps); kW is the real power that does work. kW = kVA × power factor. At a power factor of 1.0, as on most AEC series, they are equal.

What does N+1 mean for a UPS?

One more power module or unit than the load needs, so any one can fail or be serviced while the others carry the load.

What does online double conversion mean?

The UPS converts the utility's AC to DC and back to clean AC all the time, so the load is isolated from the utility and there is no transfer time on a failure.

Talk to an engineer