Applications
Where AEC keeps the power on.
Which AEC range fits each kind of site, and why: modular IST6 UPS up to 1.2 MW per cabinet with L6 lithium for data centres, IST7 and IST7-T from 10 to 200 kVA for plants and hospitals, and IST8, IST3, IST3-J and the All-in-One from 1 to 20 kVA for offices, shops and networks.
Sectors
By kind of site.

Data centres and IT
Data centres and IT
Modular three-phase 400 V UPS for data centres and IT rooms, from 30 kVA modules up to 1.2 MW in one cabinet and 9.6 MW with eight UPS in parallel, with efficiency up to 98.1 % with PLUS modules on IST6 400–1200. LiFePO4 lithium cabinets with hot-swappable modules complete the system.
- Up to 98.1% efficient with PLUS modules (IST6 400–1200)
- Modular, with hot-swappable power modules and N+1 redundancy
- Up to 1.2 MW in one cabinet, up to 8 UPS in parallel
- Lithium cabinets with BMS and hot-swappable modules (L6 Lithium)

Industry and manufacturing
Industry and manufacturing
AEC is the UPS brand of the AEC Group, in power since 1968. Its UPS protect industrial plants. Three-phase 400 V online UPS from 10 to 200 kVA, with a built-in output isolation transformer on IST7-T for harsh grids and loads that need full electrical isolation.
- 380 / 400 / 415 V three-phase
- Output isolation transformer built into every IST7-T
- Battery cabinets IP20 as standard, IP21 to IP44 on request
- Dry contacts and Modbus to the plant's systems

Healthcare and clinics
Healthcare and clinics
Online double-conversion UPS for clinics and medical care: three-phase 400 V with a built-in output isolation transformer (IST7-T), or three-phase units from 60 to 200 kVA. For single-phase 230 V equipment: IST3 towers from 1 to 10 kVA.
- Online double conversion: no transfer when the mains fails
- Built-in output isolation transformer (IST7-T)
- Generator mode: start by dry contact from the ATS (IST7 60–200)
- Maintenance bypass to service without switching off (IST7-T)

Offices, retail and networks
Offices, retail and networks
Compact online UPS for network cabinets, workstations, points of sale and small server racks, in tower or 2U rack, with lithium or VRLA batteries.
- 2U rack or tower, 1 to 3 kVA at 230 V (IST8)
- Lithium-ion battery built into the 2U chassis: up to 8 years of service life and up to 1,000 cycles (IST8)
- SNMP network card in the intelligent slot
- Display set for rack or tower (IST3-J, 1–3 kVA)
The same choices, drawn: the example designs put AEC UPS in a small and a medium office, a hospital and a 2N data centre, each with the UPS room to scale and its single-line diagram.
Middle East
Data centres in the Middle East.
Rated temperatures, batteries in heat, dust and generators.
Tell us about the site
The load, the supply, the minutes and the room: our engineers answer with the system.









