Tools
Find your UPS
Three choices, the supply (230 V single-phase or 400 V three-phase), the load in kVA and the battery (lithium or VRLA), and the EMEA 2026 catalogue tells you which of its ranges, from 1 kVA to 1.2 MVA, carry the load and which rating to order. The backup time has a tool of its own.
Product finderFind your UPS in three steps.Supply, load and battery: the range and the rating that fit, from the EMEA 2026 catalogue. Enter the load with headroom: AEC advises keeping it within about 80% of the UPS rating (16 kVA of load → 20 kVA).Open the finderClose
5 ranges cover 20 kVA. Closest fit first.
How it works
Three choices, one answer.
- Supply230 V single-phase or 400 V three-phase: the one at the panel.
- LoadIn kVA, with a margin for inrush and growth.
- BatteryLithium or VRLA lead-acid.
- AnswerThe ranges that carry the load and the rating to order.
What do you need to choose a UPS?
Three facts: the supply at the switchboard (230 V single-phase or 400 V three-phase), the load in kVA or watts, with a margin for inrush and growth, and the minutes of backup you need. The UPS sizing guide works through the calculation step by step, with two examples.
Talk to an AEC engineer
Tell us the load, the supply and the backup time you need: we answer with the model and the batteries that fit.




