Guide

How to choose a UPS: six questions to one model

The right UPS is the one that fits the supply, the load and the way the site is run. Six questions, about the voltage, the kW, the minutes, the space, the battery and the monitoring, narrow the AEC range from 1 kVA to 1,600 kVA down to one series and then one model.

AEC service technicians

What are the six questions?

  1. What supply feeds the load? 120 V, 120/240 V, 208 V or 480 V, single- or three-phase. See 208 V or 480 V.
  2. How much power? The load in kW with 20 to 25 % headroom. See UPS sizing.
  3. How many minutes? To a generator, to an orderly shutdown, or through the outage.
  4. Where does it go? A 2U rack unit, a tower beside the rack, or a modular cabinet in a plant room.
  5. Which battery? VRLA for the lowest first cost, lithium for long life, light weight and fewer replacements.
  6. How will it be watched? SNMP network cards, dry contacts and Modbus connect the UPS to your monitoring.

Which series fits which site?

WhereSupplySeries
Network closet, small server rack120 VLUMINA lithium 2U, FERRUS RT
Workstations, point of sale120 VFERRUS tower
Small office or clinic panel120/240 VFERRUS SP, FERRUS SP RT
Server room208 VETHERNO lithium, AUREON VRLA
Growing data room208 VRADIANT, RADIANT-IB modular
Data center, industrial plant480 VCIRRO-IB, CIRRO, INFINITE

How do the six answers lead to one model?

The first two answers pick the series: the supply narrows the table above to one row, and the kW with headroom picks the frame size. The kW arithmetic, with a 15 kW room at 208 V worked through on ETHERNO, is in how to size a UPS, and the UPS sizing tool runs it against every AEC model. The other four answers then choose between the models of that series: the battery, the minutes, the cabinet and the monitoring. The example below takes a site where redundancy decides.

Worked example: 45 kW at 480 V, with redundancy

A plant's control room is fed at 480/277 V and carries 45 kW. It needs 10 minutes on battery, the batteries inside the cabinet, and no single power module that can drop the load.

  1. Series. 480 V with internal batteries points to CIRRO-IB: 30 kVA modules in a 150 kVA frame, up to 240 VRLA blocks of 12 V 9 Ah inside.
  2. Modules. 45 kW on 30 kVA modules needs two (N). With one more for redundancy, three: the CIRIB150-3X30, 90 kVA, each module at 50 %.
  3. Runtime. Its table gives 10.5 minutes at 50 % load, 45 kW. The two-module CIRIB150-2X30 gives the same 10.5 minutes at 75 %, the same 45 kW: the battery is the same, so the minutes follow the kW of the load, not the number of modules.

The answer: the CIRIB150-3X30. If the room later needs more than 10.5 minutes, the internal battery is the limit, and a frame with an external bank, such as CIRRO, takes over.

Tower, rack or modular: what changes on site?

  • Rack. LUMINA and FERRUS RT are 2U and fit the rack they protect. FERRUS RT also stands as a tower.
  • Tower. ETHERNO stands 12.6 in wide and 39.1 in deep, and weighs 297.6 to 485 lb with its lithium modules. It goes beside the racks, on an ordinary floor.
  • Modular with internal batteries. RADIANT-IB and CIRRO-IB are 23.6 × 39.3 in cabinets, 78.7 in high, and weigh about a ton with their batteries (1,998 to 2,399.8 lb). Check the floor rating and the route in: doors, elevators, ramps.
  • Modular with external batteries. RADIANT, CIRRO and INFINITE keep the battery in its own cabinets, so the UPS and the battery can go where the floor and the fire code allow.

How does each series report alarms?

Every AEC UPS has its own display. What each series adds as standard, from the 2026 catalog:

SeriesStandardNetwork card
LUMINA, FERRUS, FERRUS RT, FERRUS SPRS232, USB, EPOSNMP-L (LUMINA), SNMP-M (FERRUS family)
ETHERNO, AUREONModbus, dry contactsSNMP-L
RADIANT, RADIANT-IB, CIRRO-IBRS232, USB, EPOSNMP-M
CIRRORS232, RS485, USB, dry contacts, intelligent slot, EPOSNMP-M
INFINITERS232, RS485/Modbus, dry contacts, EPOSNMP-L, optional
INFINITE 1.5MWRS232, RS485/Modbus RTU, Modbus TCP/IP, BACnet, dry contacts, EPOSNMP-L, optional

The SNMP cards also speak Modbus TCP/IP, and a dry-contact relay card fits every series. See UPS monitoring.

What mistakes make the wrong choice?

  • Choosing by the kVA on an offer sheet instead of the kW of the load.
  • Ordering a 480 V UPS for a room fed at 208 V, or a 3-wire UPS where the loads need a neutral.
  • Specifying minutes at full load that the site will never draw, and paying for batteries it does not need; or the reverse.
  • Forgetting the floor and the route: a ton of cabinet does not climb every stair.
  • Leaving out monitoring, so the first sign of a failed battery is the next outage.

What should you check about service?

Guides by building: offices and small business, hospitals and clinics, data centers.

Check the warranty, who commissions the system and how fast batteries and parts arrive. LUMINA and ETHERNO carry a five-year warranty with the lithium batteries included; the other series three years, and VRLA batteries two. INFINITE and INFINITE 1.5MW go to five years when registered, and their L6 lithium cabinets carry five years with the batteries.

Questions people ask

How do I choose a UPS?

Answer six questions: the supply voltage, the load in kW, the minutes on battery, where it goes (rack, tower or plant room), the battery chemistry, and how it will be monitored. Together they point to one series and one model.

Which UPS is best for a server room?

On a 208 V supply, a three-phase online UPS of 10 to 30 kVA such as the AEC ETHERNO (lithium) or AUREON (VRLA); for growth, a modular RADIANT. Size it so the load is about 80 % of its kW rating.

Does adding a redundant module add runtime?

No. With the same battery, the minutes follow the kW of the load: an AEC CIRRO-IB gives 10.5 minutes at 45 kW with two 30 kVA modules or with three.

What warranty do AEC UPS carry?

Five years with the lithium batteries on LUMINA and ETHERNO; three years on the other series and two on VRLA batteries; INFINITE five years when registered, with five years on its L6 lithium cabinets.

Talk to an engineer

Tell us the load, the voltage and the minutes you need. We answer with the model and the batteries that fit.