Which AEC UPS is 3-wire and which is 4-wire?
| Series | Supply | Neutral | Battery (DC bus) |
|---|---|---|---|
| ETHERNO, AUREON | 208Y/120 V, 4-wire | Carried through; sized for non-linear loads, up to 1.73 × the phase current on ETHERNO | 240 V |
| RADIANT, RADIANT-IB | 208Y/120 V, 4-wire | Carried through, not switched; main and bypass inputs share one neutral | ±120 V (240 V) with a midpoint |
| CIRRO-IB | 480Y/277 V, 4-wire | Carried through, not switched; rated 1.7 × the output current | ±240 V (480 V), internal |
| CIRRO | 480Y/277 V, 4-wire | Carried through, not switched; neutral-to-ground at the input 5 V or less | 480 V with a center tap, ±240 V |
| INFINITE, INFINITE 1.5MW | 480 V, 3-wire + ground | None at the input or output | 480 V or 600 V, no midpoint |
Every one of these UPS takes three-pole breakers. Where there is a neutral, it is a solid conductor through the UPS, never opened by a breaker inside it.
Does a 480 V UPS need a neutral?
Only if something behind it needs 277 V. In many 480 V buildings the IT loads run at 208Y/120 V from a transformer near them, often inside a power distribution unit (PDU), whose wye secondary creates a new neutral. A UPS upstream of that transformer has no use for a neutral, and a 3-wire UPS fits that layout.
A 4-wire UPS earns its neutral where 277 V loads must ride through: lighting circuits, some HVAC controls, equipment built for 277 V. On AEC's 4-wire UPS the output neutral is the supply's neutral carried through, not switched, and the static bypass connects the output to the input, so the UPS needs a 4-wire supply.
How big must the neutral be?
Larger than the phases, when the loads are power supplies. Single-phase IT loads draw currents rich in the third harmonic, and in a wye system these add in the neutral instead of cancelling. AEC's manuals size for it:
- ETHERNO: the neutral can carry up to 1.73 × the phase current with non-linear loads; size it for that.
- RADIANT, RADIANT-IB: neutral 1.5 to 1.7 × the phase conductor for mainly non-linear loads; the output neutral is rated 170 %. On a 100 kVA RADIANT-IB that is 471 A against 277 A per phase.
- CIRRO-IB: neutral rated 1.7 × the output current: up to 306 A at 150 kVA, against 180 A per phase.
A 3-wire UPS moves the problem to the transformer: the PDU transformer's secondary neutral carries those currents, and the transformer is chosen for non-linear loads. The isolation transformer page explains how to size one after a UPS.
Should the neutral be switched?
Inside an AEC UPS, no: every AC breaker in the RADIANT, RADIANT-IB, CIRRO-IB and CIRRO manuals is three-pole, with the neutral not switched. Upstream, the choice between a 3-pole and a 4-pole transfer switch follows the building's grounding and its ground-fault protection, and belongs to the engineer of record. If a 4-pole switch opens the neutral during a transfer, the UPS loses its neutral reference for that moment; tell AEC how the neutral is switched before commissioning. Two points from the manuals hold either way:
- Main and bypass inputs share the same neutral (RADIANT, RADIANT-IB, CIRRO-IB, and every cabinet of a parallel system).
- The manuals advise against ground-fault (residual-current) breakers on the UPS feeds. Where ground-fault protection is required, the RADIANT manual places it upstream of the common neutral bonding point.
What happens on the battery side?
The DC bus has its own midpoint question. CIRRO runs 40 blocks of 12 V as ±240 V with a center tap, so its external battery breaker has one pole per conductor: +, N and −. CIRRO-IB and RADIANT-IB carry their split battery inside. INFINITE has no midpoint: with lead-acid it takes 30 to 50 blocks across + and −, and with AEC L6 lithium cabinets only +, − and ground are connected, the cabinet's N busbar left unconnected and set to "without midline". Sizing an L6 lithium battery covers the rest of that connection.
Worked example: 277 V lighting and IT on one 480 V UPS
- The loads. 60 kW of IT at 208Y/120 V and 10 kW of 277 V lighting, both to ride through an outage.
- With a 4-wire UPS. A CIRRO-IB with three 30 kVA modules carries 70 kW plus margin. The lighting panel connects to its 480Y/277 V output directly; the IT goes through a PDU transformer to 208Y/120 V. The neutral is run from the supply; inside the UPS it is rated 1.7 × the output current.
- With a 3-wire UPS. An INFINITE feeds the IT through the same PDU, and the lighting through a second transformer with a 480Y/277 V secondary. No neutral is run to the UPS at all.
- The trade. The 4-wire route saves the lighting transformer and its losses; the 3-wire route keeps the neutral, its harmonics and its size out of the 480 V feeders.
What mistakes come up with 3-wire and 4-wire UPS?
- Feeding 277 V loads from a 3-wire UPS. INFINITE has no neutral terminal: 277 V and 120 V loads need a transformer after it.
- Running a 4-wire UPS from a 3-wire supply. The bypass passes the supply's neutral to the output; without one the 277 V loads have no return.
- Sizing the neutral like a phase. With IT loads it can carry 1.7 × the phase current.
- Bonding neutral to ground at the wrong place. Bonding points decide where ground-fault protection can sit; agree them with the engineer of record before the UPS is wired.
- Connecting the L6 midline to an INFINITE. Leave the cabinet's N busbar unconnected.
208 V or 480 V covers the choice of supply, UPS amps from kVA the currents, and the UPS sizing tool lists the models for each.