Guide

UPS generator sizing: input, recharge and other loads

Size the standby generator for an AEC online UPS on the UPS's maximum input, recharge included, not on its output rating. AEC's three-phase UPS draw that input through a power-factor-corrected rectifier at 0.99 or more, so a generator close to it, about 1:1, carries the UPS. Other loads come on top: a RADIANT-IB 100 kVA draws at most 125.4 kVA.

A switchgear room

Why did a UPS once need a generator 1.5 to 2 times its size?

Older UPS rectifiers were thyristor bridges, 6- or 12-pulse. They draw current in pulses, rich in harmonics, and that current heats the generator's alternator and distorts its voltage. The oversizing factors come from there. Caterpillar's application guide for engine and generator sizing asks for a standby set of at least 1.6 times the UPS input kW behind a 6-pulse rectifier and 1.4 times behind a 12-pulse one. Cummins' application manual T-030 records that UPS suppliers once asked for two to five times the UPS rating, and adds that it is now more cost effective to require a UPS compatible with the generator than to oversize the generator.

An active rectifier with IGBTs and power-factor correction (PFC) draws a near-sinusoidal current in step with the voltage. The generator sees a load close to resistive, of the size of the UPS input, and the distortion margin those factors were made for is not needed.

What does each AEC UPS draw from a generator?

The AEC US user manuals give the input power factor, the input current distortion (THDi) and the input window of every three-phase series:

SeriesInput power factorInput THDiInput voltage at full loadInput frequency
ETHERNO, AUREON0.99 or more3 % or less, linear load; 5 % or less, non-linear load (full load)90–155 V line to neutral (208/120 V supply)39.5–70.5 Hz
RADIANT0.99below 2.2 % (linear load)167–260 V40–70 Hz
RADIANT-IBabove 0.993 % or less166–261 V40–70 Hz
CIRRO-IBabove 0.993 % or less384–528 V40–70 Hz
CIRRO 360 · 600 to 16000.99 or better3 % or less · 2 % or less (linear load)384–528 V40–70 Hz
INFINITE 80 to 200 kVA0.99 or more at 50 and 100 % load; 0.98 or more at 30 %below 3 % at full load, 5 % at 50 %, 8 % at 30 % (non-linear load)336–552 V39.8–70.2 Hz
INFINITE 1.5MWabove 0.993 % or less408–552 V (336–552 V below full load)40–70 Hz

Every series draws its input through an active, power-factor-corrected rectifier, so the figures in the next table can be taken at about 1:1. The distortion rises at light load, as INFINITE's figures show, and stays a fraction of the about 30 % a 6-pulse thyristor bridge draws. Outside its input window a UPS runs on its battery: the generator must hold its voltage and frequency inside the window while the UPS takes the load, and the manuals ask that it reaches stable voltage and frequency before it feeds the UPS.

How big a generator for each AEC UPS?

The US manuals give the maximum input current of each frame at full load with the battery recharging. In kVA at the nominal voltage it is the generator for the UPS alone at 1:1. The AEC user manuals also print a general rule, a generator of at least 1.5 times the UPS input power, to cover the battery recharge; the last column gives it for comparison.

UPS (full build)OutputInput current, maxGenerator at 1:1 (input kVA at that current)Manual's general rule: 1.5 × input power at full load
ETHERNO 30, AUREON 3030 kW, 208 V100 A36.0 kVA48 kW
RADIANT, 6 modules90 kW, 208 V318 A114.6 kVA144 kW
RADIANT-IB, 5 modules100 kW, 208 V348 A125.4 kVA160 kW
CIRRO-IB, 5 modules150 kW, 480 V225 A187.1 kVA235 kW
INFINITE 200200 kW, 480 V274 A227.8 kVA308 kW
CIRRO 800 frame800 kW, 480 V1,046 A869.6 kVA1,240 kW

The input at maximum current runs 9 to 27 % above the output rating: the UPS's losses plus the recharge. The manuals' 1.5 factor covers the recharge without working it out and leaves a margin on top; where the maximum input current is known, as here, the generator for the UPS can be sized on it. For INFINITE 1.5MW, ask AEC for the maximum input current. The same currents size the feeder breakers: the manuals ask for 125 % of them, rounded up to the next standard rating. UPS amps from kVA shows the arithmetic.

What else does the generator carry?

  • Recharge, if you size from the actual load. The maximum input already holds it. Sized from a smaller load instead, add the charger: 40 A on a 240 V battery for RADIANT and RADIANT-IB, about 9.6 kW; 40 A on 480 V for CIRRO-IB, about 19.2 kW; 80 A on 480 V for CIRRO, about 38.4 kW; 120 A on 480 V for INFINITE, about 57.6 kW. All are settable. An L6 lithium cabinet charges at 0.5 C as set, about 1.4 kW per 50 Ah module, about 29 kW for 20 modules; ETHERNO's 50 Ah lithium modules recharge in less than 2 hours.
  • The building's other loads. Cooling, lighting and pumps at their running kW, and motors at their starting kVA, from their makers. Caterpillar's guide adds the other loads to the UPS input in the same way.
  • The load step. When the transfer switch closes, the UPS comes off its battery and moves onto the generator, often with the cooling. The generator's maker sizes the set for the voltage and frequency dip of that step; Cummins T-030 lists static UPS among loads sensitive to frequency changing faster than 0.5 Hz per second. A UPS whose input leaves its window waits on battery until the generator settles.
  • Site conditions. A generator's rating holds at its maker's reference altitude and temperature; above them the maker derates the set.
  • The final build. A RADIANT frame with two modules today and six later needs the generator, breakers and cables of six.

A generator far larger than its load is no safer: Cummins recommends running a set at no less than 30 % of its nameplate rating.

Which generator settings does the UPS have?

  • RADIANT, RADIANT-IB, CIRRO-IB: a normally-open auxiliary contact of the generator wired to dry-contact input IP3 (GEN CONNECTED). The UPS logs Generator Input and can limit the battery charge while the generator runs. See the RADIANT-IB manual, section 4.8.4.
  • CIRRO: a generator signal on a dry-contact input (Set › Dry Contact), with settings for stable operation on diesel generators.
  • INFINITE: a generator-running contact on an input set as Generator mode. AEC service sets whether the battery charges on the generator, by how much the charge power is reduced, and the generator's rated kVA: if the load exceeds that rating, the battery supplies the difference.

With charging reduced on generator power, more of the generator is left for the other loads, and the battery refills once the utility returns.

Worked example: an 80 kW server room at 208 V

  1. The UPS. A RADIANT-IB with five 20 kVA modules: four carry 80 kW, the fifth is N+1.
  2. The UPS at 1:1. The cabinet's maximum input is 348 A at 208 V, 125.4 kVA, about 124 kW at a power factor of 0.99: full load with recharge, for the full cabinet.
  3. From the actual load. 80 kW ÷ 0.94 (the catalog efficiency at 75 to 80 % load) = 85.1 kW, plus up to 9.6 kW of recharge with the 40 A charger at its full setting: about 95 kW.
  4. The manual's general rule. 1.5 × 85.1 = 128 kW, above both figures.
  5. Everything else. The room's cooling, the emergency lighting and anything else on the same generator are added at their own starting and running figures; the generator's maker checks the load step and the site derating.
  6. The setting. Wire the generator's auxiliary contact to IP3 so the UPS knows when it is on the generator.

How long must the battery last when there is a generator?

Long enough for the generator to start, settle and take the load, with a margin for a failed first start. The transfer itself takes seconds; a margin of minutes covers a generator that does not start at the first attempt, when the battery is the only source. UPS for hospitals and clinics covers the 10-second gap of an emergency generator, and the battery runtime tool gives the minutes of a battery at your load.

What mistakes come up with UPS and generators?

  • Sizing the generator to the UPS rating. A 100 kVA UPS at full load draws more than 100 kVA: 125.4 kVA at maximum current for a RADIANT-IB.
  • Applying 6-pulse factors to a PFC UPS. A factor of 1.6 or 2 pays for harmonics an AEC rectifier does not draw, and leaves the generator running lightly loaded.
  • Forgetting the other loads. The cooling and its motors starting share the same generator.
  • Leaving the generator contact unwired. Without it the UPS does not know it is on the generator and cannot limit its charge there.
  • Testing without load. A generator that starts on its own may still trip when the UPS, the battery recharge and the cooling arrive together; test with the real load.

The UPS sizing tool picks the UPS for your load, and 208 V or 480 V helps choose the supply both will share.

Questions people ask

How big a generator do I need for an AEC UPS?

For the UPS alone, about its maximum input in kVA: a RADIANT-IB 100 kVA draws at most 348 A at 208 V, 125.4 kVA, the input current its US manual gives at full load with the battery recharging. Add the other loads on the generator. The AEC user manuals' general rule, 1.5 times the UPS input power, is a conservative figure that needs no calculation.

Does a UPS need a generator twice its size?

Not with an active PFC rectifier. Factors of 1.4 to 2 come from thyristor rectifiers, 6- or 12-pulse, whose harmonic current heats the alternator. AEC's three-phase UPS draw at an input power factor of 0.99 or more, with input current distortion of 5 % or less at full load.

Why does my UPS stay on battery when the generator is running?

Because the generator's voltage or frequency is outside the UPS input range. The UPS takes the generator only when its input is within range, so the generator must reach stable voltage and frequency first. A UPS that keeps returning to battery points to a generator too small or unstable for the step.

What does a business need for hurricane season?

A UPS and a standby generator together: the UPS carries the load without a break when the utility drops and for the minutes the generator takes to start and take the load, and the generator carries the hours. Size the generator on the UPS's maximum input plus the other loads, and give the battery a margin of minutes for a generator that fails its first start.

Can a UPS reduce battery charging on a generator?

Yes. RADIANT, RADIANT-IB and CIRRO-IB take a generator contact on dry-contact input IP3 and can limit the charge; CIRRO takes a generator signal on a dry-contact input; INFINITE has a generator mode that turns charging off or reduces it by a set ratio.

Talk to an engineer