UPS installation clearances: what to check on site

Before an AEC UPS arrives, check the way in, the space around it, the floor, the cable entry and the air. Each range's manual gives its clearances, from 300 mm behind an IST7 10–40 kVA to 800 mm around an IST7 60–200 kVA, and the face worked in service also needs a gangway of at least 700 mm.

In brief

  • Each AEC range has its own clearances; where a manual gives none, this guide says "not published" and AEC confirms it for the project.
  • On the face where the switches and terminals are, HD 60364-7-729 adds a gangway: 700 mm from the cabinet, and room for the door open at 90° or a module pulled out, plus 500 mm.
  • On that face the gangway often asks for more than the manual: 1,200 mm in front of an IST6 30–120 kVA, 700 mm behind an IST7 10–40 kVA.
  • Battery cabinets and lithium cabinets weigh far more per square metre than the UPS: from about 1,580 to 1,990 kg/m² against about 400 to 990 kg/m² for an IST7.
  • Cables come in from below on the IST7 60–200 and the IST6 30–500 as standard, and from the top on the IST6 400–1200.

How much space does each AEC UPS need around it?

The table gathers the clearances the AEC manuals and range pages give, and the face where the switches and terminals are worked. "Not published" means no AEC document gives the figure yet: it is not zero, and AEC sets it for the project.

Clearances of AEC EMEA UPS and battery cabinets (minimum free space, mm)
RangeFrontRearSidesTopWorked from
IST3 1–10 kVAnot published300–500300–500not publishedrear
IST3-J 1–3 kVA, IST8300–500 all round500rear (plugs and sockets)
IST7 10–40 kVAnot published300 (300–500 recommended)300–500not publishedrear
IST7 60–200 kVA800800800 (manual drawing)800front
IST6 30–120 kVA800800not published500front
IST6 200–500 kVA800500not published500front
IST6 400–1200 kVA800500 (400–600 kVA), 800 (800–1200 kVA)not published500 (650 with the top air outlet kit, 400–600 kVA)front
All-in-One 20 kVA800800not published500front
L6 lithium cabinet800800none: cabinets bolt side by side500front
BB5 to BB8 battery cabinets600100100not publishedfront
IST9 racknot published: ask AECrear

The IST7 60–200 kVA range page gives 800 mm in front, behind and above; the drawing in its user manual shows 800 mm at the sides too, so plan for it. The rack units, IST3-J and IST8, stand in a 19-inch rack, where the rack's own air path applies.

What does the operating gangway add?

The manual's clearance is for air and for the unit itself. Where people operate switches or work on terminals, the European rules for operating and maintenance gangways, HD 60364-7-729 (CEI 64-8 section 729 in Italy), ask for more on that face:

  • at least 700 mm between the cabinet and the wall or the cabinet opposite (729.513.2.1 b);
  • doors that open to at least 90°, with 500 mm free past the edge of the open door (729.513.2 and Annex A.1);
  • 500 mm free past a power module or a battery module pulled fully out (Annex A.1);
  • a gangway longer than 10 m reachable from both ends (729.513.2.3).

These are the figures of HD 60364-7-729:2009 as AEC's room fit tool applies them. Check them against the edition in force and the national rules, which also say where they apply.

The free space to plan on a face is the largest of these figures and the manual's own. Taking each door as wide as the cabinet front (two leaves on the BB8), the AEC ranges come out as follows:

Free space on the face worked in service: the largest of the manual's clearance and the gangway rules (mm)
Range, faceManualGangwayDoor at 90° + 500Module out + 500Plan for
IST7 10–40 kVA, rear300700no doorno module700
IST7 60–120 kVA, front800700400 + 500 = 900not published900
IST7 160–200 kVA, front800700600 + 500 = 1,100not published1,100
IST6 30–120 kVA, front800700600 + 500 = 1,100700 + 500 = 1,2001,200
IST6 200–500 kVA, front800700600 + 500 = 1,100650 + 500 = 1,1501,150
IST6 400–1200 kVA, front800700not published760 + 500 = 1,2601,260
L6 cabinet, front800700600 + 500 = 1,100665 + 500 = 1,1651,165
BB6, BB7, front600700800 + 500 = 1,300no module1,300
BB8, front600700700 + 500 = 1,200no module1,200

The IST7 10–40 kVA has its breakers and terminals on the rear panel, so the 300 mm of its manual becomes 700 mm behind it as soon as someone has to work there. A BB6 or BB7 battery cabinet, with its 800 mm door, takes more room in front than the UPS it feeds.

Will it get through the doors and the lift?

Measure every door, corridor, ramp and lift between the truck and the room against the cabinet, with the transport base under it. The sizes to check:

Size and weight of AEC EMEA UPS cabinets (W × D × H)
RangeSize, mmWeight
IST7 10–20 kVA250 × 806 × 88064 kg; 95–137.6 kg as S model with internal batteries
IST7 30–40 kVA300 × 842 × 1250102.5 kg; 249.7 kg as S model
IST7 60–120 kVA400 × 960 × 1193153–167 kg
IST7 160–200 kVA600 × 1000 × 1600294–296 kg
IST6 30–120 kVA600 × 860 × 2000195 kg without modules; 24 kg per power module
IST6 200–300 kVA607 × 860 × 2000224–236 kg without power modules
IST6 400–500 kVA (50 kVA modules)1203 × 864 × 2000459–506 kg without power modules
IST6 400–800 kVA (100 kVA modules)801 × 1000 × 2000345–435 kg without modules
IST6 1000–1200 kVA1201 × 1000 × 2000662 kg without modules
L6 cabinet, full600 × 850 × 2000965 kg (40 Ah), 985 kg (50 Ah), 810 kg (100 Ah)

The IST6 cabinets are 2,000 mm high before any pallet or roller goes under them. The IST6 400–1200 kVA may be tilted by no more than 15° in handling, so a low door cannot be passed by leaning it; it is lifted by forklift from the side, or by two forklifts from the front. The IST7 60–120 kVA rolls on castors to its place and is then anchored; the 160–200 kVA is bolted to the floor.

Can the floor carry it?

Divide the weight by the footprint. For the UPS alone the figures stay moderate; the batteries are what load a floor.

Floor load of AEC EMEA equipment, weight over its own footprint
EquipmentWeightFootprintFloor load
IST7-60153 kg400 × 960 mmabout 400 kg/m²
IST7-200296 kg600 × 1000 mmabout 490 kg/m²
IST7-40 S, internal batteries249.7 kg300 × 842 mmabout 990 kg/m²
All-in-One 20 kVA, 2 to 8 × 50 Ah232–460 kg0.6 m²about 390–770 kg/m²
BB5, 38 × 40 Ahwith batteries460 × 800 mm1,576 kg/m²
BB7, 36 × 100 Ahwith batteries800 × 800 mm1,992 kg/m²
BB8, 64 × 100 Ah2,215 kg1400 × 800 mm1,978 kg/m²
L6 cabinet, 20 × 50 Ah985 kg600 × 850 mmabout 1,930 kg/m²

Compare these with what the floor is rated for, and on a raised floor put the cabinets on a stand made for the load, never on the tiles. The IST7 60–200 kVA and the L6 manuals allow concrete or another non-combustible floor only, and the IST3, IST7 10–40 kVA and IST6 200–500 kVA manuals ask for a level floor, tilted by less than 5°.

Where do the cables come in?

  • IST3 6–10 kVA and IST7 10–40 kVA: rear terminals; on the IST7 10–40 kVA the cables are tied down to the bottom of the rear panel.
  • IST7 60–200 kVA: from below on every model; for the 160 and 200 kVA the manual recommends a cable trench of 210 × 450 × 100 mm.
  • IST6 30–120 kVA: from below as standard, from the top with the top wiring accessory.
  • IST6 200–500 kVA: from below as standard, from the top built to order.
  • IST6 400–1200 kVA: from the top as standard; from below with the side wiring cabinet and a trench of 750 × 300 × 120 mm.
  • BB5: right side, top and bottom. BB6 to BB8: a 100 × 100 mm gland plate in the roof, and an open base.
  • L6: DC cables from the top.

A bottom entry on a plain concrete slab needs a trench, a cored hole, a raised floor or a plinth under the cabinet: decide which before the floor is finished. Cable sizes are in each range's manual, and the battery cabinets page gives the minimum copper cross-section between cabinet and UPS for every UPS power.

Where does the air go?

The IST7 60–200 kVA and the IST6 cabinets take their air in at the front and blow it out at the rear, so keep the rear clearance free: the hot air leaves there. The IST6 200–500 kVA moves from 2,420 m³/h (200 kVA) to 6,050 m³/h (500 kVA) front to rear; the IST6 400–1200 kVA can blow out at the top with its top air outlet kit, standard from 800 kVA. The IST7 runs from −5 to 40 °C and the IST6 200–1200 kVA from 0 to 40 °C; the IST7 10–40 kVA, IST6 and L6 data give 2,000 m as the altitude limit before derating. The batteries in the same room want 20 to 25 °C.

The heat to remove is worked out in our guide to UPS heat output and cooling, and the fresh air a lead-acid battery needs in our guide to battery room ventilation.

Checklist before the UPS is delivered

  1. Door, corridor, ramp and lift widths and heights on the way in, against the cabinet and its transport base.
  2. Lift capacity against the heaviest piece, and the forklift or pallet truck the delivery needs.
  3. Clearances on every face, and the operating gangway on the face worked in service.
  4. Floor load in kg/m² for the UPS and, separately, for each battery cabinet; a non-combustible, level floor.
  5. Cable entry: trench, raised floor or top entry, and the route to the switchboard and to the battery.
  6. Air in at the front, out at the rear or top, and the room's cooling and battery ventilation.
  7. Anchoring: holes, bolts or steel base as the manual gives them.

The room fit tool places an AEC UPS and its battery cabinets in your room and checks every point above: the manuals' clearances, the gangways and door swings, the floor load, the cable entry, the heat and the battery ventilation, each result with its source. To choose the unit first, start from the UPS finder.

Questions

Questions people ask

How much space does a UPS need around it?

800 mm in front, behind and above for an AEC IST7 60–200 kVA; at least 300 mm behind for an IST7 10–40 kVA; 800 mm in front and behind and 500 mm above for an IST6 30–120 kVA. Each range's manual gives its own figures.

What is the operating gangway in front of a UPS?

On the face where switches and terminals are worked, HD 60364-7-729 (CEI 64-8 section 729 in Italy) asks for at least 700 mm, the door open at 90° plus 500 mm, and a pulled-out module plus 500 mm. In front of an IST6 30–120 kVA that makes 1,200 mm.

How much does a UPS battery cabinet load the floor?

About four times as much as the UPS: an AEC BB7 with 36 × 12 V 100 Ah blocks loads the floor at 1,992 kg/m² and a BB8 with 64 × 100 Ah at 1,978 kg/m², against about 490 kg/m² for an IST7-200.

Where do cables enter AEC three-phase UPS, top or bottom?

The IST7 60–200 kVA takes them from below on every model. The IST6 30–120 and 200–500 kVA take them from below as standard, with top entry as an option; the IST6 400–1200 kVA from the top, with bottom entry through a side wiring cabinet.

Can a UPS be installed on a raised floor?

Yes, on a stand built for its weight, not on the floor tiles. The IST7 60–200 kVA and L6 manuals also require concrete or another non-combustible floor.

How far behind an IST7 10–40 kVA must the wall be?

The manual asks for at least 300 mm, 300–500 mm recommended for ventilation. Its breakers and terminals are on the rear panel, so where someone works there, plan the 700 mm operating gangway of HD 60364-7-729.