FERRUS SP · 120/240V split-phase UPS
FERSP20000-40X9 FERRUS SP 20 kVA, 120/240V split-phase UPS
The AEC FERRUS SP FERSP20000-40X9 is a 20 kVA / 20 kW online double-conversion UPS for 120/240 V split-phase loads, with internal VRLA batteries. Kept at 80 % of its rating, it carries loads up to 16 kW.
Drag to turnThe same on every FERRUS SP:The FERRUS SP display
Load by load
The FERSP20000-40X9 at 25, 50, 75 and 100 % load.
Its 20 kW rating in four steps, worked out from its own catalog figures.
| Load | Output current on each leg | Efficiency | Heat to remove | Heat to remove (BTU/h) |
|---|---|---|---|---|
| 25 % of the FERSP20000-40X9, 5.0 kW | 20.8 A on each leg | 90.8 % efficient | 507 W of heat | 1,730 BTU/h to cool |
| 50 % of the FERSP20000-40X9, 10 kW | 41.7 A on each leg | 92.8 % efficient | 776 W of heat | 2,650 BTU/h to cool |
| 75 % of the FERSP20000-40X9, 15 kW | 62.5 A on each leg | 93.0 % efficient | 1.1 kW of heat | 3,850 BTU/h to cool |
| 100 % of the FERSP20000-40X9, 20 kW | 83.3 A on each leg | 92.8 % efficient | 1.6 kW of heat | 5,290 BTU/h to cool |
Current = kVA × load ÷ volts.
Heat = load × (100 ÷ efficiency − 1); 1 kW is 3,412 BTU/h.
Efficiency
How efficient is the FERSP20000-40X9 at your load?
The FERSP20000-40X9 in normal double-conversion mode, from the 2026 catalog's efficiency curve. Drag along it to see the heat lost and its yearly cost.
- Load
- —
- Lost as heat
- —
- Heat to remove
- —
- Energy lost in a year, 24/7
- —
- Its cost in a year at per kWh
- —
From the 2026 catalog
What is the FERSP20000-40X9?
- Output: 20,000 VA / 20,000 W (unity power factor, kVA = kW).
- Battery: internal VRLA, 40 × 12 V 9 Ah.
The lines every FERRUS SP shares, from technology to warranty, are in the FERRUS SP key facts and in the datasheet below.
Size and floor
How big it is
15.8" W × 28.7" D × 38.7" H (401 × 729 × 983 mm); 452 lb (205 kg) net.
Floor load = net weight ÷ footprint, without batteries outside the cabinet.
Installation
What does the FERRUS SP need in the room?
From the AEC US user manual of the FERRUS SP. Where the manual gives no distance, none is printed here: ask AEC.
- Clearances
- 20 in (500 mm) free on all four sides.
- Wiring
- Hardwired: an electrician connects it to the panel.
- Cable entry
- From below into the rear terminal cover
- Breakers and terminals
- Input breaker, battery breakers BAT1·BAT2 and maintenance bypass switch on the rear panel; terminals 26.9 in (684 mm) above the floor.
- Units in parallel
- Up to 3 of the same model.
- Note
- Fitting or replacing the internal batteries takes both side covers off: keep the sides reachable.
Datasheet
FERSP20000-40X9 datasheet.
The FERSP20000-40X9 in the AEC 2026 catalog, figure by figure. Compare it with every FERRUS SP model.
| Parameter | FERSP20000-40X9 |
|---|---|
| Power | |
| Rated power (kVA) | 20 |
| Active power (kW) | 20 |
| Output power factor | 1.0 |
| Electrical | |
| Input / output | 120/240 V split-phase |
| Topology | Online Double Conversion |
| Efficiency, up to | 93% |
| Battery DC bus | 240 V DC |
| Battery and runtime | |
| Battery type | VRLA (sealed lead-acid) |
| Battery configuration | Internal |
| Runtime at 50 % load | 10 min |
| Runtime at 100 % load | 3 min |
| Mechanical | |
| Form factor | Tower |
| Dimensions W × D × H | 15.8 × 28.7 × 38.7 in (401 × 729 × 983 mm) |
| Net weight | 452 lb (205 kg) |
| Footprint | 3.1 ft² (0.29 m²) |
| Common to every FERRUS SP | |
| Comms | RS-232, EPO and USB, standard |
| Battery, FERSP20000-40X9 | internal VRLA, 40 × 12V 9Ah |
| Network card | SNMP-M (SNMP) |
| Warranty | 3 years on UPS · 2 years on VRLA batteries |
| Quality system | ISO 9001:2015, the group's quality system (SGS) |
From the AEC 2026 catalog. Figures can change: the order confirmation rules.
Downloads
Manuals and catalogs.
The FERRUS SP documents cover every model of the series, this one included. PDF, in English.
Catalogs and datasheets
User manuals
FERRUS SP 6–10 kVA: User manual (US, 2026)User manual · English · PDF · 6.8 MBDownload
FERRUS SP 6–10 kVA: Quick installation guide (US, 2026)User manual · English · PDF · 1.5 MBDownload
FERRUS SP 20 kVA: Quick installation guide (US, 2026)User manual · English · PDF · 1.4 MBDownload
FERRUS SP 20 kVA: User manual (40X9, EMPTY, EXT; US, 2026)User manual · English · PDF · 8.0 MBDownload
Quick answers
FERSP20000-40X9: what people ask
What is the output current of the FERSP20000-40X9?
83.3 A on each line at 240 V at full load: 20 kVA ÷ 240 V. Size the input breaker and the cables of the FERSP20000-40X9 from its installation manual and the local electrical code, not from this figure alone.
How much heat does the FERSP20000-40X9 give off?
About 1.6 kW, 5,290 BTU/h, at full load, where it is 92.8% efficient. Plan the room's cooling for a little more than that: the FERSP20000-40X9 is less efficient at part load and while its battery recharges.
Will the FERSP20000-40X9 fit through a standard door?
Yes: 15.8 in (401 mm) across its narrow side and 38.7 in (983 mm) high, it passes a standard 36 × 80-inch door upright. On the way in, check corridors, elevators and the floor load of the FERSP20000-40X9 (size section above).
The method, for any UPS: runtime explained · amps from kVA · heat output in BTU/h
FERRUS SP
Other FERRUS SP models
By power, the FERSP20000-40X9 is the largest in the FERRUS SP series, which runs from 6 to 20 kVA. One size down is the FERSP10000-16X9 (10 kVA less and 216 lb lighter).
Every FERRUS SP model side by side (3)
| Model | Power | Power against this model | Net weight | Weight against this model | Runtime at 50 % load |
|---|---|---|---|---|---|
| FERSP6000-16X9 | 6 kVA | 14 kVA less | 196 lb | 256 lb lighter | 14.3 min at 50 % load |
| FERSP10000-16X9 | 10 kVA | 10 kVA less | 236 lb | 216 lb lighter | 7.5 min at 50 % load |
| FERSP20000-40X9 | 20 kVA | this page | 452 lb | this page | 10 min at 50 % load |
Install and run it:FERRUS SP operating guide
The FERSP20000-40X9 for your project
Send the load, the voltage and the minutes you need from the FERSP20000-40X9. We reply with the configuration, the batteries and the lead time.