Data centre UPS: from the edge room to 9.6 MW at 400 V

A data centre UPS carries the IT load from the mains failure until the generator holds it, and keeps doing so with one of its parts out for service. AEC answers by load band: the All-in-One and IST9 for edge rooms, IST6-120 and IST7 for server rooms, IST6 with 50 and 100 kVA modules up to 1.2 MVA per cabinet and 8 UPS in parallel.

By load band

Which AEC architecture fits which room

One load worked in each band with N+1 and every module at 80% or less with one module out (this example's design choice: set your own limit): the cabinet, the modules installed and each module's share in normal running.

Which AEC architecture fits which room
BandAEC rangesLoad workedCabinet and modules, N+1Footprint
Edge and network roomsThe All-in-One 20 kVA with the lithium in the same 600 × 1000 mm cabinet; IST9 and IST7 from 10 to 40 kVA, 400 V three-phase.20 kWone All-in-One 20 kVA, an IST9 20 kVA inside0.6 m²
Server rooms and small data roomsIST6-120, 30 kVA modules (4 + 1 redundancy slot); IST7 60–200, up to 8 units in parallel, 1.6 MW.90 kWIST6-120: 5 × 30 kVA in 5 slots, each at 60%0.52 m²
Data halls and colocationIST6 200–500, 50 kVA modules in cabinets of 200 to 500 kVA.300 kWIST6 200–500, 500 kVA: 9 × 50 kVA in 10 slots, each at 67%1.04 m²
Megawatt blocksIST6 400–1200, 100 kVA modules up to 1.2 MVA per cabinet; up to 8 UPS in parallel, 9.6 MW.3,000 kW4 × IST6 400–1200, 1,000 kVA: 39 × 100 kVA in 40 slots, each at 77%4.8 m²

Footprint: the UPS cabinets only.

Redundancy, counted

One 800 kW load, three ways

The same critical load on the 100 kVA IST6 400–1200 cabinets, each scheme with every module at 80% or less of what it must carry after a failure. The IST6 data give BSC dual bus and multi-bus with 3 buses: the two architectures for 2N and for three systems sharing the load.

One 800 kW load, three ways
SchemeCabinetsModules in allEach module, normal runningCabinets: footprint, weight with modulesSurvives
N+1 in one system1 × IST6 400–1200, 1,200 kVA, 11 modules1173%1.2 m², 1,256 kgone power module out or failed
2N: two systems, each for the whole load2 × IST6 400–1200, 1,000 kVA, 10 modules2040%2.4 m², 2,404 kga whole system, its bypass or its feed out (dual-corded loads)
Three systems on 3 buses, any two carry the load3 × IST6 400–1200, 500 kVA, 5 modules1553%2.4 m², 2,112 kga whole system out; the other two take its share (dual-corded loads or static transfer switches)

Weights: the cabinet without modules plus the 54 kg modules, no batteries. Declared IST6 400–1200 efficiency: 97.2% with General modules, 98.1% with PLUS modules, 99.2% in ECO; the data give no part-load figures, so the table estimates none.

EMEA 2026 data

Every IST6 cabinet, with N+1 and kW per m²

N+1 here is the cabinet with every slot filled and one module held spare. kW per m²: the N+1 power over the cabinet's own footprint; batteries and service space come on top.

Every IST6 cabinet, with N+1 and kW per m²
CabinetModulesN+1, cabinet fullW × DFootprintN+1 kW per m²Weight with modules
IST6-1204 × 30 kVA + 1 redundancy slot120 kW600 × 860 mm0.52 m²233315 kg
IST6 200–500, 200 kVA4 × 50 kVA150 kW607 × 860 mm0.52 m²287380 kg
IST6 200–500, 300 kVA6 × 50 kVA250 kW607 × 860 mm0.52 m²479470 kg
IST6 200–500, 400 kVA8 × 50 kVA350 kW1203 × 864 mm1.04 m²337771 kg
IST6 200–500, 500 kVA10 × 50 kVA450 kW1203 × 864 mm1.04 m²433896 kg
IST6 400–1200, 400 kVA4 × 100 kVA300 kW801 × 1000 mm0.8 m²375561 kg
IST6 400–1200, 500 kVA5 × 100 kVA400 kW801 × 1000 mm0.8 m²499704 kg
IST6 400–1200, 600 kVA6 × 100 kVA500 kW801 × 1000 mm0.8 m²624758 kg
IST6 400–1200, 800 kVA8 × 100 kVA700 kW801 × 1000 mm0.8 m²874867 kg
IST6 400–1200, 1,000 kVA10 × 100 kVA900 kW1201 × 1000 mm1.2 m²7491,202 kg
IST6 400–1200, 1,200 kVA12 × 100 kVA1,100 kW1201 × 1000 mm1.2 m²9161,310 kg

IST6-120: the fifth slot is reserved for a redundant module, so its N+1 is 120 kW. Modules: 30 kVA at 24 kg, 50 kVA at 39 kg (500 × 650 × 130 mm), 100 kVA at 54 kg in 3U; all hot-swappable from the front. IST6 200–500 moves 2,420 m³/h of air (200 kVA) to 6,050 m³/h (500 kVA), front to rear.

Battery

Minutes, weight and the room

Lithium. An L6-50 cabinet holds 58 kWh and gives 14 minutes at its rated 200 kW; it weighs 985 kg on 600 × 850 mm, about 1,931 kg/m² for the structural engineer. It is designed for IST7 and IST6 from 6 to 1,200 kVA, up to 15 cabinets in parallel. Lead-acid. IST6 400–1200 runs on a 480 V DC bus with 40 blocks of 12 V as standard (30 to 50); in the 5 MW project each UPS has four cabinets of 40 × 200 Ah.

400 V

Current and parallel

At 400 V a 1,200 kVA cabinet at full load carries about 1,732 A per phase: size the switchboard and cables for the full cabinet from day one, so added modules need no new cables. Up to 8 UPS in parallel with current imbalance ≤ 5%; IST6-120 and IST7 in parallel with their kit and ring cables.

In service

Data centres AEC has powered

5 MW of IST6 modular UPS for a data centre in Italy: five UPS of 1 MW, each a 1.2 MW frame with 10 modules of 100 kW, so 2 free slots per frame, and four battery cabinets of 40 × 200 Ah. 1.2 MW of IST6 modular UPS for an Italian bank's data centre: four UPS of 300 kW, six 50 kW modules each. A 1.2 MW containerised UPS with lithium batteries for a Swiss private bank: 12 modules of 100 kW and 60 lithium modules of 50 Ah in an IP55 container. Data centres in the Middle East.

Before the order

Check it on your own room

Room fit places the cabinets and batteries on your floor plan · the 3D viewers open the IST6 1,200 kVA in X-ray · UPS finder · backup time · modular UPS · the data centre UPS guide · N+1 redundancy

Questions

Questions people ask

What size UPS does a data centre need?

The IT load in kW at full build-out, the redundancy the design asks for, and the minutes to carry it until the generator holds the load. The UPS rating is then the load divided by the share each system may carry: all of it in N+1, all of it on each side of 2N, half of it in each of three shared systems.

N+1 or 2N?

N+1 covers a power module: one can fail or be serviced and the load stays on the inverter. It does not cover what the modules share: the cabinet's bypass, output and feed. 2N does, with two complete systems feeding dual-corded loads; it takes about twice the modules.

What is multi-bus with 3 buses?

Three UPS systems share the load so that, if one stops, the other two carry its share. For 800 kW: three IST6 400–1200, 500 kVA cabinets with 5 modules each, 15 modules in all against 20 for 2N. The IST6 200–500 and 400–1200 data give BSC dual bus and multi-bus with 3 buses.

How far does an IST6 system go?

One IST6 400–1200 cabinet carries up to 1,200 kVA with 12 modules of 100 kVA; up to 8 UPS in parallel reach 9.6 MW.

Can a data centre UPS run on lithium?

Yes: the L6 cabinets are designed for IST7 and IST6 from 6 to 1,200 kVA. An L6-50 holds 58 kWh and gives 14 minutes at 200 kW, its rated power.