3/1 · 10 to 40 kVA
3/1 UPS: three-phase in, single-phase out
A 3/1 UPS takes a 400 V three-phase supply and feeds the load on one 230 V phase. It is used where the load is single-phase but too large for a single-phase supply: the input current is shared by three phases, the output stays one circuit. AEC builds it from 10 to 40 kVA, in three ranges.



Comparison
Which of the three for your load?
From each range's data in the EMEA 2026 catalogue. On all three the single-phase output is 220, 230 or 240 V.
| Range | Ratings in 3/1 | Form, size and weight | How 3/1 is set | When to choose it |
|---|---|---|---|---|
| IST9 | 10, 15, 20, 30, 40 kVA | 19-inch rack, 3U: 438 × 535 × 130 mm, 18.4 kg (10–20 kVA); 438 × 720 × 130 mm, 34.1 kg / 34.2 kg (30–40 kVA) | The mode is set with connector jumpers on the rear terminals and on the touchscreen. | When the UPS goes into a rack. |
| IST7 10–40 | 10, 20, 30, 40 kVA | Tower: 250 × 806 × 880 mm, 64 kg (10–20 kVA); 300 × 842 × 1250 mm, 102.5 kg (30–40 kVA) | Wiring, the optional connector jumpers, the screen and, on 30–40 kVA, the mode connector. | When a floor-standing tower is wanted, also with the batteries in the cabinet (S models). |
| All-in-One | 20 kVA | Footprint 600 × 1000 mm (W × D); height 1110 mm on castors, 1000 mm without castors. | As the IST9 20 kVA inside it. | When UPS, switches and lithium battery must arrive as one cabinet: 15 to 60 minutes at 20 kW, by the number of modules. |
IST9
How a unit is changed from 3/3 to 3/1
10–20 kVA work in 3/3, 3/1 or 1/1 mode; 30–40 kVA in 3/3 or 3/1 mode. The mode is set with connector jumpers on the rear terminals and on the touchscreen.
- 3/1 mode: three in, one out (10–40 kVA).
- Connector jumpers, 10–20 kVA: four jumper types (types 1–2 two-pin, 3–4 three-pin) for 3/3, 3/1 or 1/1 mode.
- Connector jumpers, 30–40 kVA: one 3-pin jumper type, used only in 3/1 mode; it short-circuits the three-phase bypass input and the three-phase output terminals.
- Set on the screen: work mode on the System management page. Output 3W + N + PE, settable to 1W + N + PE; input 3W + N + PE (on 10–20 kVA settable to 1W + N + PE).
IST7 10–40
In 3/1 the output carries all the current on one phase
Single-phase bypass and output carry up to three times the phase current: neutral and output cables are larger.
| Model | AC input (A) (3/1) | Bypass input (A) | AC output (A) | Bypass · output breaker | N, bypass, output (mm²) | PE (mm²) |
|---|---|---|---|---|---|---|
| IST7-10 | 19.5 | 58.6 | 45.6 | 80 A 1P · 80 A 1P | 16 | 2 × 10 |
| IST7-20 | 35.5 | 106.4 | 90.9 | 100 A 3P · 100 A 3P | 25 | 2 × 10 |
| IST7-30 | 65.7 | 197.1 | 136.4 | 250 A 1P · 200 A 1P | 2 × 25 | 25 |
| IST7-40 | 81.7 | 245.0 | 181.8 | 300 A 1P · 250 A 1P | 2 × 25 | 25 |
Input breaker and input live cable as 3/3. 1/1 on 10–20 kVA: input 58.6 A (10) and 106.4 A (20), cables 16 and 25 mm².