25 November 2026 · 8 min
3/1 UPS: sizing the input, bypass, neutral and output
A 3/1 UPS takes a 400 V three-phase supply and delivers one 230 V single-phase output. Choose it when the single-phase load is larger than one phase of the supply can feed, or would unbalance it: the rectifier draws the power from all three phases.
The bypass and the output are single-phase and carry the whole load current, so they are sized apart from the input.
In brief
- On the inverter, a 3/1 UPS loads the three phases of the supply equally. On bypass, the whole load sits on one phase and the neutral.
- The AEC IST7 10–40 kVA manual gives, for the 20 kVA model in 3/1: 35.5 A per phase at the input, 106.4 A at the bypass input, 90.9 A at the output.
- The output neutral carries the same current as the output line. It is never reduced.
- Breakers and cables come from the UPS manual and the national wiring rules, not from the kVA alone.
When is a 3/1 UPS the right choice?
Three cases lead to it.
- The load is single-phase and large. 20 kVA on one 230 V phase is 20,000 VA ÷ 230 V = 87 A. Few supply connections give that on a single phase; through a 3/1 UPS the same load arrives at the supply as a three-phase load.
- The single-phase board already exists. A 3/1 UPS feeds it as one circuit. With a 3/3 UPS the loads would have to be split into three groups, each within a third of the rating.
- The loads cannot be balanced. One large single-phase machine, or loads that switch on and off at different times, would load the three output phases of a 3/3 UPS unequally.
A 3/3 UPS is the better choice when any load is three-phase, such as a motor, or when the single-phase loads can be spread evenly over three phases: the output cables are smaller, as the table shows. The guide to three-phase UPS covers phase balancing in 3/3.
| Configuration | AC input | Bypass input | AC output |
|---|---|---|---|
| 3/3 | 35.5 A per phase | As the AC input | 30.3 A per phase |
| 3/1 | 35.5 A per phase | 106.4 A, one phase | 90.9 A, one phase |
| 1/1 | 106.4 A, one phase | 106.4 A, one phase | 90.9 A, one phase |
What does the supply see, on the inverter and on bypass?
In normal operation the load runs from the inverter, and the rectifier takes its power from the three input phases in equal parts. The supply sees a balanced three-phase load whatever is connected to the output.
On bypass this is no longer true. The static bypass, and the maintenance bypass, connect the load straight to the bypass line. In 3/1 that line is single-phase: the whole output current flows on one phase and on the neutral. On the IST7-20 the manual gives 106.4 A at the bypass input against 35.5 A per phase at the rectifier input.
Two consequences follow for the design:
- The bypass supply and its protection are sized for the single-phase bypass current, not for the three-phase input current. That covers the upstream breaker, the cable, and the phase and neutral of the board that feeds it.
- The source must accept that load on one phase. A transformer or a generator that is comfortable with 35.5 A on each phase may not accept 106.4 A on one. Check the permitted single-phase load with the maker of the generator; the guide to UPS and generators covers the rest of that match.
How do you size the input breaker and cable?
Start from the maximum input current in the manual, not from the rating. For 20 kVA the rating alone gives 20,000 VA ÷ (√3 × 400 V) = 28.9 A per phase. The IST7-20 manual gives 35.5 A: the rectifier also supplies the losses of the UPS and the battery charger, and the figure is a maximum.
The manual then sets the breaker at 1.5 to 2 times that current, to allow for battery charging and inrush, without leakage (residual-current) protection:
- Maximum input current: 35.5 A per phase.
- Breaker range: 1.5 × 35.5 A = 53 A to 2 × 35.5 A = 71 A.
- Breaker recommended by the manual: 63 A, three-pole.
- Input cable recommended by the manual: 6 mm², for about 5 m at 25 °C.
The input in 3/1 is the same as in 3/3: same breaker, same phase cables. Above 20 m the manual asks for a larger section, and above 25 mm² for two cables in parallel. The final section always follows the national wiring rules for the laying method and the length.
How do you size the bypass, the output and the neutral?
This is where 3/1 differs. The output current is the rating divided by the output voltage: 20,000 VA ÷ 230 V = 87.0 A. The manual's maximum, 90.9 A, is the same sum at the 220 V output setting: 20,000 VA ÷ 220 V = 90.9 A. Size for the manual's figure.
| Model | Output in 3/3, per phase | Output in 3/1, one phase | Bypass input in 3/1 |
|---|---|---|---|
| IST7-10 | 15.2 A | 45.6 A | 58.6 A |
| IST7-20 | 30.3 A | 90.9 A | 106.4 A |
| IST7-30 | 45.5 A | 136.4 A | 197.1 A |
| IST7-40 | 60.6 A | 181.8 A | 245.0 A |
For the IST7-20 in 3/1 the manual recommends 100 A breakers on the bypass and on the output, 25 mm² for the neutral, the bypass and the output conductors, and 2 × 10 mm² for the protective earth, again for about 5 m at 25 °C. The breakers and sections of the other three sizes are in the table on the 3/1 UPS page.
The neutral. A single-phase circuit has two current-carrying conductors, the line and the neutral, and both carry the same current. In 3/1 the output neutral and the bypass neutral therefore take the full 90.9 A and 106.4 A of the example. The manual gives one section for the neutral, the bypass and the output for this reason. A neutral reduced to half the phase section, as is sometimes done in balanced three-phase distribution, has no place here.
The supply itself must be three-phase with neutral. On the IST9 the input is 3W + N + PE and the output is set to 1W + N + PE for single-phase operation.
How should the output be distributed?
The single-phase board after the UPS takes the whole output on one incomer, so its incomer, busbar and neutral bar are rated for the 3/1 output current. After that, three points keep the system selective.
- Split the load over several final circuits. An inverter supplies a limited fault current. A small final breaker clears a fault quickly; one large breaker for the whole load may not.
- Ask for the inverter's short-circuit current and check it against the largest final breaker. AEC service gives the figure for the model and the configuration.
- Add up the loads in VA and in W. The IST7 and the IST9 have a power factor of 1, so a 20 kVA unit carries 20 kW; the sum of the single-phase loads must stay within it, with the margin the sizing guide explains.
Backfeed protection belongs to the same drawing. EN IEC 62040-1 requires that a UPS cannot feed voltage back into its input when the mains is off. On the IST9 this is done by the distribution module with its backfeed contactor, or by a contactor between the distribution board and the UPS, rated above the operating current of the UPS and labelled for the backfeed risk. In 3/1 that current is the single-phase bypass current.
Which standards apply?
A UPS is specified against the EN IEC 62040 series: part 1 for safety, part 2 for electromagnetic compatibility, part 3 for the way performance is stated and tested. Part 3 classifies an online double-conversion UPS as VFI: its output voltage and frequency are independent of the input.
The installation around it follows the national wiring rules built on IEC 60364, such as CEI 64-8 in Italy and BS 7671 in the United Kingdom. These rules, with the UPS manual, decide the cable sections, the protection and the earthing. The figures in this guide are the manual's reference values; the designer of the installation confirms them for the site.
Common mistakes
- Sizing the bypass line like the input. On the IST7-20 the bypass input is 106.4 A on one phase; the rectifier input is 35.5 A per phase.
- Reducing the neutral. In 3/1 the neutral carries the full output current.
- Forgetting the bypass when choosing the generator. The generator sees a balanced load on the inverter and a single-phase load on bypass.
- Taking the breaker from the kVA. The manual's maximum input current is higher than the rating divided by the voltage, and the breaker is 1.5 to 2 times that.
- Keeping the 3/3 output cables after a change to 3/1. The output current triples: 30.3 A becomes 90.9 A on the IST7-20.
- Changing the mode on a live system. The configuration is set by wiring, connector jumpers and the screen, by qualified personnel, before the bypass breaker is closed.
Which AEC UPS work in 3/1?
Three ranges of the EMEA catalogue, all online double conversion with a 220, 230 or 240 V single-phase output:
- IST9: 10, 15, 20, 30 and 40 kVA in a 19-inch, 3U chassis, rack or tower. The 20 kVA model in 3/1 has a maximum of 35 A at the input and 91 A at the bypass and at the output; the manual recommends a 63 A three-pole input breaker and 125 A single-pole breakers on bypass and output.
- IST7 10–40 kVA: 10, 20, 30 and 40 kVA towers, with the batteries inside on the S models.
- All-in-One: an IST9 20 kVA with its distribution switches and 2 to 8 lithium modules of 50 Ah, or 4 of 100 Ah, in one cabinet, wired at the factory. Its 3/1 currents are those of the IST9 20 kVA.
The three side by side, with sizes and weights: 3/1 UPS, three-phase in and single-phase out. To start from the load and the backup time, use the UPS finder.
Questions
Questions people ask
What does 3/1 mean on a UPS?
Three-phase input, single-phase output. The UPS takes a 400 V three-phase supply with neutral and feeds the load on one 230 V phase. AEC builds 3/1 UPS from 10 to 40 kVA in the IST9 and IST7 10–40 kVA ranges, and in the All-in-One built on the IST9 20 kVA.
Does a 3/1 UPS balance the load on the three-phase supply?
On the inverter, yes: the rectifier draws from the three phases in equal parts. On static or maintenance bypass, no: the load is connected to the single-phase bypass line and sits on one phase and the neutral, so that line is sized for the whole load current.
How large are the output cables of a 20 kVA 3/1 UPS?
On the AEC IST7-20 the maximum output current in 3/1 is 90.9 A. The user manual recommends 25 mm² for the neutral, bypass and output conductors and 100 A breakers, for about 5 m at 25 °C. The national wiring rules decide the final section for the length and the laying method.
Can a 3/1 UPS be changed to 3/3 later?
On the IST9 and the IST7 10–40 kVA, yes. The configuration is set by the wiring, the connector jumpers and the screen. Output cables, breakers and the distribution board change with it, so the work is planned with AEC service and done by qualified personnel.