To read a UPS datasheet, work through it in a fixed order: rating, input, battery, output, efficiency, environment, communication and standards. For each line, ask what the figure means for your load and your site, and look for the conditions in the footnotes. This guide does exactly that with a real AEC datasheet, the IST7 10–40.

In brief

  • A UPS datasheet gives the same blocks in almost every brand: general, input, battery, output, system, environment.
  • Check the rating in both kVA and kW, and the output power factor that links them.
  • Input and battery lines tell you how the UPS behaves with a weak grid, a generator and the battery you plan to fit.
  • Footnotes matter: they hold derating rules, the meaning of model suffixes and the test conditions.
  • "Up to" figures, such as efficiency, apply at one operating point; ask for the value at your load.

What a UPS datasheet tells you, and what it does not

A UPS datasheet is a table of UPS specifications for every model in a range. It tells you what the UPS can do under stated conditions. It does not tell you whether that is enough for your project; that is your job, and it is what sizing is for.

Our running example is the AEC IST7 10–40, an online double conversion UPS in four ratings: IST7-10, IST7-20, IST7-30 and IST7-40. Its data comes in five groups: General, Input, Battery, Output and System, followed by a block of notes. Where a value is the same for all models, the datasheet writes it once across the columns.

It is tempting to download a UPS datasheet PDF and read only the first line. The table below shows what each block tells you and what to check, with the IST7 10–40 value as an example. If some of the terms are new, keep our UPS glossary open next to it.

UPS datasheet sections explained, with IST7 10–40 values
Datasheet lineIST7 10–40 valueWhat it tells youWhat to check
Rated power (kVA / kW)10 / 10 to 40 / 40Apparent and real powerLoad in both kVA and kW, with headroom
Input voltage range176–280 V at 100% load; 80–176 V with linear deratingMains window before the battery is usedYour grid quality and generator
Input PF · THDi≥ 0.99 · ≤ 3% (≤ 5% non-linear)How clean the UPS is to the supplyGenerator and transformer sizing
Battery voltage±96 … ±240 Vdc (10 kVA); ±144 … ±240 Vdc (20–40 kVA)Allowed battery string sizesBlocks per string and any derating
Output voltage distortion≤ 2% / ≤ 4% (10–20 kVA); ≤ 1% / ≤ 4% (30–40 kVA)Waveform quality, linear / non-linear loadSensitive loads
Transfer time inverter ↔ bypass< 1 ms synchronised; < 10 ms not synchronisedBreak during a bypass transferLoad tolerance to short breaks
Inverter overload105–110% 60 min … 155–200% 200 msHow long peaks are carriedInrush and motor starts
System efficiencyUp to 96%; 99% in ECO mode (single UPS)Losses and heatEfficiency at your load
Environment−5 … 40 °C · 0–95% RH · IP20 · < 55 dB · up to 2000 mRoom requirementsCooling, altitude, noise
Display · communicationTouch screen · RS485 · dry contacts · optional cardsHow the UPS reports alarmsBMS, network and shutdown needs

General data: rated power and configuration

The first line is the rated power in kVA and kW. kVA is apparent power and kW is real power; they are linked by the output power factor (PF): kW = kVA × PF. The IST7 10–40 reads "10 / 10" up to "40 / 40", because its output PF is 1. The notes add that PF 0.9 can be set, which lowers the kW rating to 90% of the kVA. The full reasoning is in our guide to kVA vs kW.

Worked example. A server room draws 14 kW and 15 kVA.

  1. Take the IST7-20: 20 kVA / 20 kW at PF 1.
  2. Load in kW: 14 ÷ 20 = 70%. Load in kVA: 15 ÷ 20 = 75%.
  3. Both are below 80%, so at least 25% of the rating is still free for growth and inrush.
  4. If the output were set to PF 0.9, the kW rating would be 20 × 0.9 = 18 kW, and the load would be 14 ÷ 18 ≈ 78%. Still acceptable, but with less margin.

The second general line is the input/output configuration: "3/3 · 3/1 · 1/1" on 10–20 kVA and "3/3 · 3/1" on 30–40 kVA. It tells you how many phases go in and come out. 3/1, three-phase in and single-phase out, is useful when a three-phase supply must feed single-phase loads. The step-by-step method for the whole load list is in our UPS sizing guide.

Input data: voltage window, frequency and THDi

The input block says what the UPS needs from the mains, and how far the mains can drift before the battery takes over.

  • Connection: 3 + N + PE (settable 1 + N + PE on 10–20 kVA). Three phases, neutral and protective earth.
  • Voltage range: 176–280 V at 100% load · 80–176 V with linear derating. The datasheet does not say whether these are phase-to-neutral or line-to-line values, but on a 230/400 V supply they can only be phase-to-neutral: 280 V is well below the 400 V line-to-line voltage. Between 176 and 280 V the UPS runs at full power from the mains. Below 176 V it still uses the mains, at a power that falls linearly down to 80 V. That saves battery cycles on a weak grid.
  • Frequency range: 39.5–70.5 Hz. A wide window helps with generators, whose frequency can swing when a large load starts.
  • Bypass ranges: 50 / 60 Hz ± 10% (self-adapting) · 10 / 15 / 20% (default 20%). The first is the frequency window within which the inverter stays synchronised to the bypass; the second is the bypass voltage tolerance, settable to 10, 15 or 20%. Outside these limits the UPS treats the bypass as unusable.
  • Power factor ≥ 0.99 · THDi ≤ 3% at resistive full load, ≤ 5% at non-linear full load. THDi is the distortion of the input current. Low values mean the UPS draws a near-sinusoidal current and puts little stress on the supply.

What to check: compare the voltage window with your site, especially at the end of long lines. If a generator is involved, the input PF, THDi and frequency window matter a lot; see UPS and generator. The product data also gives a maximum input current for 3/3 operation: 19.5 A (10 kVA), 35.5 A (20 kVA), 65.7 A (30 kVA) and 81.7 A (40 kVA). Use it, not the rated current, when you choose upstream breakers and cables.

Battery data: voltage, cells and charge current

The battery block is the one most often misread. It does not give a backup time; it gives the limits of the battery you may connect.

  • Battery voltage: ±96 … ±240 Vdc on 10 kVA and ±144 … ±240 Vdc on 20–40 kVA. The ± sign means the string is split into two halves around a centre neutral point.
  • Cells (2 V), settable: ±48 … ±120 (10 kVA, default ±48) and ±72 … ±120 (20–40 kVA, default ±96). A lead-acid cell is 2 V, and a 12 V block holds six cells.
  • Charge current: 1–10 A (default 1 A) on 10–20 kVA and 1–20 A (default 2 A) on 30–40 kVA. It is set on the screen at commissioning, together with battery capacity.

The notes add a key rule: on 20–40 kVA, with ±72 … ±90 cells (24–30 blocks), the output is limited to 75% of the rating. Full power needs at least 32 blocks.

Worked example. An IST7-20 with a string of 32 × 12 V blocks.

  1. Cells: 32 blocks × 6 cells = 192 cells, that is ±96 cells around the neutral.
  2. Voltage: ±96 × 2 V = ±192 Vdc, inside the ±144 … ±240 Vdc window.
  3. 32 blocks is the minimum for full power, so the UPS gives 20 kVA.
  4. With only 24 blocks: 144 cells, ±72, ±144 Vdc. It is allowed, but the output drops to 75%: 20 × 0.75 = 15 kVA.

The ordering codes follow the same logic. IST7-10-32X9 is a 10 kVA S model with 32 × 12 V 9 Ah batteries inside; "S" means internal battery. IST7-20-32X40 is an IST7-20 with a BB5 battery cabinet holding 32 × 12 V 40 Ah blocks. To turn capacity into minutes, use our backup time calculator or the guide to UPS backup time.

Output data: waveform, transfer time and overload

The output block says what the load receives.

  • Voltage: L-N 220 / 230 / 240 V · L-L 380 / 400 / 415 V, chosen on the screen.
  • Frequency: tracks the bypass; with the bypass absent or out of range, 50 ± 0.1 Hz or 60 ± 0.1 Hz (default 50).
  • Waveform and PF: sine wave, PF 1 (settable 0.9).
  • Voltage distortion: ≤ 2% resistive / ≤ 4% non-linear on 10–20 kVA, ≤ 1% / ≤ 4% on 30–40 kVA.
  • Transfer time inverter ↔ bypass: < 1 ms synchronised, < 10 ms not synchronised. The mains-to-battery transfer of an online UPS has no break, so it is not listed here.
  • Inverter overload (PF 1): < 105% continuous · 105–110% 60 min · 110–130% 10 min · 130–155% 1 min · 155–200% 200 ms · above 200% immediate.
  • Bypass overload: < 130% continuous · 130–155% 1 min · above 155% 200 ms.

Worked example. An IST7-40 runs at 30 kW. A machine starts and the load jumps to 48 kW for a few minutes.

  1. Overload: 48 ÷ 40 = 120% of rating.
  2. 120% falls in the 110–130% band, so the inverter carries it for up to 10 minutes.
  3. If the peak lasted longer, the UPS would move the load to the bypass, which carries up to 130% continuously, but then the load is no longer conditioned.
  4. Conclusion: acceptable for a short start, but a regular 120% peak means the UPS is too small.

Efficiency and system data

The IST7 10–40 datasheet gives system efficiency "up to 96%" in double conversion and 99% in ECO mode on a single UPS. "Up to" means the best operating point. Efficiency usually falls at low load, so ask for the curve or the values at 25%, 50%, 75% and 100% load.

Worked example. Losses are the power turned into heat: losses = P × (1/η − 1).

  1. IST7-40 at 80% load: 32 kW.
  2. Double conversion, assuming the "up to" 96% applies at this load: 32 × (1/0.96 − 1) ≈ 1.33 kW of heat.
  3. ECO mode at 99%: 32 × (1/0.99 − 1) ≈ 0.32 kW.
  4. If the UPS ran at that load all year (8,760 hours), that is about 11,680 kWh and 2,830 kWh of energy lost.

That heat must also be removed by the room cooling; see UPS heat output and cooling. ECO mode trades some conditioning for efficiency, as explained in UPS efficiency and ECO mode.

The system block also lists parallel: up to 4 units with the optional parallel kit, for redundancy or more power, and DC start: the UPS can start from the battery without mains. The alarm list (battery low voltage, mains abnormal, UPS fault, output overload) tells you what the UPS will report.

Environment and mechanical data

The environment line reads: −5 … 40 °C · 0–95% RH non-condensing · IP20 · noise < 55 dB (25 °C) · up to 2000 m.

  • Temperature. The UPS works from −5 to 40 °C, but the product data recommends 20–25 °C. Batteries age much faster in heat, so plan for the recommended range.
  • Humidity. Up to 95% is accepted only without condensation.
  • IP20. Protected against fingers and objects over 12.5 mm, not against water: an indoor technical room.
  • Altitude. Up to 2000 m at full rating; above that, power is derated according to IEC 62040-3.
  • Dimensions and weight. 250 × 806 × 880 mm for 10–20 kVA and 300 × 842 × 1250 mm for 30–40 kVA. Weight standard / S: 64 / 95 kg (10 kVA), 64 / 137.6 kg (20 kVA), 102.5 / 249.7 kg (30–40 kVA).

The installation notes add a floor gradient below 5° and at least 300 mm free from the rear panel to the wall. Check the weight of the S models against the floor load, and the route from the loading bay to the room.

Communication and standards

The communication line of the IST7 10–40 reads: touch screen · RS485 · dry contacts: EPO, 1 input, 5 outputs · optional cards: SNMP, protocol transfer, dry-contact kit. Behind it are:

  • an RS485 port for a PC or supervisory system;
  • dry contacts: EPO, one input and five relay outputs, rated 277 Vac / 30 Vdc / 10 A;
  • two intelligent slots for optional cards, such as the SNMP card for network monitoring and safe shutdown;
  • a USB port to export the history record and user log.

Check how alarms reach the people who must act on them: a building management system via dry contacts, IT via SNMP, or both. Note that RS485 cannot be used when intelligent slot 2 is in use, so plan the cards together.

For standards, look for three references: IEC/EN 62040-1 (safety), IEC/EN 62040-2 (EMC, with the category, such as C2 or C3) and IEC/EN 62040-3 (performance, often with a classification code such as VFI-SS-111). On the IST7 10–40 data, IEC 62040-3 appears in the altitude derating note. If the standards you need are not on the sheet you have, ask for the declaration of conformity. For emergency lighting, EN 50171 applies instead; see CPSS and EN 50171.

Common mistakes and a datasheet checklist

These are the errors we see most often when people compare UPS specifications.

  • Reading only the kVA. A UPS at PF 0.9 gives fewer kW than its kVA. Check both.
  • Skipping the footnotes. On the IST7 10–40, the 75% rule for 24–30 blocks is in the notes.
  • Taking "up to" efficiency as typical. It applies at one load point.
  • Confusing the input window with the bypass window. They are different limits with different effects.
  • Using rated current for breakers. Use the maximum input and battery currents. On the IST7 10–40 the maximum battery current is 54.8 A (10–20 kVA), 82.2 A (30 kVA) and 109.6 A (40 kVA).
  • Forgetting the room. Temperature, altitude, clearances and floor load can rule out a UPS that is electrically right.

Before you sign off a UPS from its datasheet, tick these points:

  1. Load below about 80% of both the kVA and the kW rating.
  2. Configuration (3/3, 3/1, 1/1) matches the supply and the loads.
  3. Input voltage and frequency windows suit the grid and any generator.
  4. Battery voltage, number of blocks and any derating are confirmed.
  5. Overload table covers inrush and motor starts.
  6. Efficiency known at your real load, and heat removal planned.
  7. Room temperature, humidity and altitude, and the UPS size and weight, checked.
  8. Alarms and shutdown signals routed via dry contacts, RS485 or SNMP.
  9. Standards and EMC category confirmed for the site.

The same method works on every AEC datasheet, from single-phase towers to modular systems; browse the three-phase UPS range or try the UPS finder. For a PDF datasheet or help reading one for your project, contact our technical team. A datasheet does not show the service behind the unit: the warranty, the spare parts and the 24/7 line are on why AEC.

Questions

Questions people ask

How do I read a UPS datasheet?

Go through it in order: rated power, input, battery, output, efficiency, environment, communication and standards. For each line, compare the figure with your load and your site. Always read the footnotes, because they hold derating rules and test conditions.

What are the most important UPS specifications?

Rated power in kVA and kW with the output power factor, the input voltage window, the battery voltage, the overload table and efficiency. Together they tell you whether the UPS can carry the load, cope with the grid and fit your battery. Environment data then tells you whether it fits the room.

Why does a UPS datasheet give both kVA and kW?

kVA is apparent power and kW is real power, linked by the power factor: kW = kVA × PF. A load can exceed one rating while staying within the other. The AEC IST7 10–40 has output PF 1, so its kVA and kW ratings are equal, for example 20 / 20.

Does a UPS datasheet show the backup time?

No, usually not as a single figure, because backup time depends on the battery you fit and the load. The datasheet gives the battery voltage, number of cells and charge current. You then work out runtime from the battery capacity and the load, or ask for a calculation.

What does "up to 96% efficiency" mean on a UPS datasheet?

It is the best value, measured at one operating point. Efficiency is usually lower at light load. Ask for efficiency at 25%, 50%, 75% and 100% load and use the value closest to your real load.

Where can I get a UPS datasheet PDF from AEC?

The technical data for each range is on its product page, for example the IST7 10–40. For a PDF datasheet or catalogue, contact AEC through the contact form. You can also ask for help reading the data for your project.

Talk to an AEC engineer