IST3 · Single-phase UPS

IST3-6 Single-phase online UPS 6 kVA, tower, 230 V

VRLA6 kVAonline tower UPS, 230 V

The IST3-6 is a 6 kVA / 6 kW single-phase online double-conversion tower UPS on wheels, with 16 internal 12 V 9 Ah batteries and its own maintenance bypass. For server rooms, laboratories and small plants with a single-phase supply and loads up to about 5 kW.

6 kVA / 6 kWRating
230 × 524 × 553 mmW × D × H
54.5 / 11.0 kgWeight
192 V (16–20 × 12 V settable)Battery

Quick answers

IST3-6: quick answers

What it is
The IST3-6 is a 6 kVA / 6 kW single-phase online double-conversion tower UPS on wheels, with 16 internal 12 V 9 Ah batteries and its own maintenance bypass.
Who it is for
For server rooms, laboratories and small plants with a single-phase supply and loads up to about 5 kW.
Supply and configuration
208 / 220 / 230 / 240 V
Battery and backup
192 V (16–20 × 12 V settable) · 5–20 min full / half load
Size and weight
230 × 524 × 553 mm · 54.5 / 11.0 kg
Ordering code
IST3-6-16X9 · IST3-6-L

IST3

What sets apart the IST3-6

At 6 kVA the IST3 changes construction: input, output and battery connect on a terminal bar, not on sockets, and the standard model carries a maintenance bypass switch, so the battery can be replaced with the load on. The 192 V battery of 16 × 9 Ah gives 4 minutes at full load and 13 at half load in AEC's data (the catalogue prints 5 and 20); the string can be set from 16 to 20 blocks.

The input window is 176–275 V at full load, with linear derating down to 80 V, and the output distortion is below 1% on linear load. Overload is held longer than on the small models: 105–130% for 10 minutes (1 minute above 30 °C). The long backup model is a compact 190 × 429 × 337 mm box of 11.0 kg.

  • Against the IST3-3 (one size down): Power 6000 VA / 6000 W against 3000 VA / 3000 W; Voltage range 176–275 V full load · 80–176 V linear derating against 176–295 V full load · 154–176 V load < 75% · 120–154 V load < 50%; Voltage distortion THD < 1% linear · < 4% non-linear against THD < 3% (linear load); Overload 105–130% 10 min (1 min above 30 °C) · 130–150% 30 s · > 150% 500 ms against 100–130% 1 min · 130–150% 1 s · > 150% 200 ms; Voltage, standard model 192 V (16–20 × 12 V settable) against 72 V.
  • Against the IST3-10 (one size up): Power 6000 VA / 6000 W against 10000 VA / 10000 W; Backup time, standard model 5–20 min full / half load against 1–15 min full / half load; Weight standard / long backup 54.5 / 11.0 kg against 56.2 / 12.5 kg.

Planning data

IST3-6: currents, breakers, cables, batteries

The rows and columns of the EMEA 2026 catalogue's and AEC manuals' tables that concern the IST3-6.

Wall socket or terminal bar

IST3-6 · Wall socket or terminal bar
Model6 kVA
AC input max. (A)36
AC breaker (A)50
DC input max. (A, long backup)39
DC breaker (A)50
AC cable (mm²)6
Battery cable (mm²)6

Installation

Installing the IST3-6: space, cables

Each figure with its source.

IST3-6 · installation
ItemFigureSource
Clearancesrear 300 mm (recommended 500), left 300 mm (recommended 500), right 300 mm (recommended 500); front and top: not givenAEC IST3 user manual p.6 §1.2
Cable entryRear terminal blockAEC IST3 user manual
Operating temperature−5 to 40 °C, best 20–25 °CAEC IST3 user manual p.6 §1.2
Switches and terminalsTerminal block (input, output, battery) under a cover at the rear; mains, bypass and battery breakers and the maintenance bypass switch on the rear panel (standard model).AEC IST3 user manual p.6 §1.2

Size and floor

How big it is

230 × 524 × 553 mm · 54.5 / 11.0 kg.

0.12 m²footprint
91–452 kg/m²floor load
0.55 mheight

Floor load = weight ÷ footprint: 91 kg/m² at the lowest weight given (11 kg), 452 kg/m² at the highest (54.5 kg).

1.75 mFrontSide230524553

Efficiency

How efficient is the AEC IST3-6 at your load?

IST3-6, 6 kW at its rating, online, double conversion (typical curve, AEC's method). Heat to remove on this curve: 50%: 0.19 kW (η 94.05%) · 75%: 0.21 kW (η 95.5%) · 100%: 0.30 kW (η 95.3%). At 50% load, 24/7, it loses about 1,663 kWh a year.

95.5%75% · Typical curve, derived from the datasheet efficiency of 95.5% (AEC method)

How the curve is drawn and where each figure comes from: the IST3 range page. The IST3 pages of the EMEA 2026 catalogue give no efficiency figure. The 1, 2 and 3 kVA curves are the ones AEC measured on the IST3-J of the same rating (AEC technical datasheet IST3-J 1–3 kVA), which AEC states has the same electronics; the 6 and 10 kVA curve has the same shape, moved to their 95.5% figure.

Load
—
Lost as heat
—
Energy lost in a year, 24/7
—
Its cost in a year at € per kWh
—
The catalogue's examples use €0.20 per kWh.
Where each figure comes from
ModeEfficiencyKindModelsSource
Online, double conversion30%: 93.04% · 50%: 94.05% · 75%: 95.5% · 100%: 95.3%Typical curve, derived from the datasheet efficiency of 95.5% (AEC method)IST3-6 · IST3-10AEC technical datasheet IST3-J 1–3 kVA: AC/AC efficiency
ECO98.3%Datasheet figure, load not statedallAEC technical datasheet IST3-J 1–3 kVA: AC/AC efficiency
Online, double conversion30%: 86.14% · 50%: 88.7% · 75%: 90.06% · 100%: 90.83%Measured (AEC datasheet)IST3-1AEC technical datasheet IST3-J 1–3 kVA: AC/AC efficiency
Online, double conversion30%: 89.36% · 50%: 91.23% · 75%: 92.16% · 100%: 92.56%Measured (AEC datasheet)IST3-2AEC technical datasheet IST3-J 1–3 kVA: AC/AC efficiency
Online, double conversion30%: 90.84% · 50%: 91.85% · 75%: 93.3% · 100%: 93.1%Measured (AEC datasheet)IST3-3AEC technical datasheet IST3-J 1–3 kVA: AC/AC efficiency
AEC IST3-6, rendered from its 3D modelDrag to turn

In 3D

Look around the IST3-6

Technical data

Technical data IST3-6

Only this model's values, from the EMEA 2026 catalogue table.

IST3-6 · Technical data
Rating
Power (VA / W)6000 / 6000
Efficiency (AC/AC)up to 95.5% · 98.3% in ECO mode
Input
Voltage range176–275 V full load · 80–176 V linear derating
Frequency · connection50 / 60 Hz ± 10%, self-adapting · single phase, L + N + PE
Output
Voltage220 V ± 2% (default) · 208 / 220 / 230 / 240 V settable from the panel
Frequency · waveform50 / 60 Hz ± 0.2% in battery mode · sine wave
Voltage distortionTHD < 1% linear · < 4% non-linear
Power factor · transfer time1.0 (kVA = kW) · 0 ms mains to battery
Overload105–130% 10 min (1 min above 30 °C) · 130–150% 30 s · > 150% 500 ms
Battery
Voltage, standard model192 V (16–20 × 12 V settable)
Voltage, long backup model192 V
Backup time, standard model5–20 min full / half load
Charge recoverystandard model < 10 h · long backup: depends on the battery pack
General
CommunicationRS232 and USB standard · SNMP card or RS485 and dry-contact card optional · EPO
Protectionsbattery undervoltage, overload, short circuit, over-temperature, input overvoltage
Noise< 55 dB
Environment−5 … 40 °C · 0–95% RH non-condensing · ≤ 1000 m without derating
Dimensions W × D × H, standard230 × 524 × 553 mm
Dimensions W × D × H, long backup190 × 429 × 337 mm
Weight standard / long backup (kg)54.5 / 11.0
IST3-6 · Models
ItemIST3-6
VA / W6000 / 6000
Internal batteries16 × 9 Ah · 192 V
Backup, full / half load5 / 20 min
W × D × H (mm)230 × 524 × 553
kg54.5
Long backup: battery192 V
Long backup: kg11.0

Specifications are subject to change without notice.

More technical detailsordering codes

Ordering codes

Ordering codes IST3-6

Ordering codes IST3-6
CodeDescription
IST3-6-16X9 · IST3-10-16X96 / 10 kVA with 16 internal 12 V 9 Ah batteries
IST3-6-L · IST3-10-LLong backup 6 / 10 kVA, external batteries only
IST3-[kVA]-[n]X9UPS with battery cabinet BB1, BB2 or BB3, n × 12 V 9 Ah in total
DRYCNT-IST3/9 · SNMPDry-contact relay board · internal SNMP board
MBYP-3K · MBYP-6KExternal manual maintenance bypass, rack, max. 3 kVA · max. 10 kVA

Questions

Questions about the IST3-6

How long does the IST3-6 run on its internal batteries?

4 minutes at full load and 13 at half load with 16 × 12 V 9 Ah (192 V), in AEC's data (the catalogue prints 5 and 20). A BB3 tower cabinet adds up to 32 × 12 V 9 Ah, and more than one BB3 can be connected for longer backup.

What does the IST3-6 need on the supply side?

A single-phase L + N + PE supply with a 50 A breaker (36 A maximum input current) and a 6 mm² cable for about 5 m, earth cable of the same section. The long backup model draws up to 39 A from the battery on a 50 A DC breaker.

How long does a 6 kVA UPS like the IST3-6 run?

4 to 47 minutes at full load (6 kW), and 13 to 113 minutes at half load, with the AEC battery options in the table: the battery chosen sets the figure. With 16 × 12 V 9 Ah (IST3-6-16X9): 4 minutes at 100% and 13 at 50%. For other loads and batteries use the backup-time tool.

How big is the AEC IST3-6 and how much does it weigh?

The AEC IST3-6 measures 230 × 524 × 553 mm; weight: 54.5 / 11.0 kg (size from AEC's CAD drawing, weight from the EMEA 2026 catalogue).

What is the ordering code of the AEC IST3-6?

In the EMEA 2026 catalogue the AEC IST3-6 is listed as IST3-6-16X9, IST3-6-L; AEC gives the full code, batteries included, from the load and the backup time.

Talk to an AEC engineer

Tell us the load, the supply and the backup time you need for the AEC IST3-6: we answer with the model and the batteries that fit. AEC International sells through distributors in about 80 countries and an agency in every Italian region: ask AEC which one serves your area.