Can the IST7 10–40 kVA supply single-phase loads?
Yes: every model works in 3/3 or 3/1, and the 10–20 kVA models also in 1/1. The configuration is set through the wiring, connector jumpers and the screen (plus the mode connector on 30–40 kVA).
Answered on IST7 10–40
Can several IST7 10–40 kVA units run in parallel?
Yes, up to 4 units, with the optional parallel kit (built-in card, CAN communication, two redundant RJ45 ports), in redundant or capacity (expand) mode. In N+1 redundancy a faulty unit can leave or rejoin without affecting the load, and units can share battery groups with the same battery amount and parameters.
Answered on IST7 10–40
Can the IST7-10 run from a single-phase supply?
Yes. The IST7-10 is set to 1/1 (single-phase in and out) through the wiring, the connector jumpers and the screen; it also works 3/3 and 3/1. In 1/1 the catalogue gives 58.6 A at the bypass input and 45.6 A at the output.
Answered on IST7-10
IST7 10–40: what is the ordering code of each model?
As the EMEA 2026 catalogue lists them:
| Model | Catalogue code |
|---|---|
| IST7-10 | IST7-10, IST7-10-32X9, IST7-10-150X9 |
| IST7-20 | IST7-20, IST7-20-36X9, IST7-20-32X40 |
| IST7-30 | IST7-30 |
| IST7-40 | IST7-40, IST7-40-34X60 |
AEC gives the full code, batteries included, from the load and the backup time.
Each model's own page, linked in the table, gives its full answer and data.
Can the IST7-30 feed single-phase loads?
Yes, in 3/1: three-phase input, single-phase output. The catalogue gives 197.1 A at the bypass input and 136.4 A at the output in 3/1, with 2 × 25 mm² neutral, bypass and output cables. A single-phase input (1/1) is not available on 30 kVA.
Answered on IST7-30
Backup time and batteries 8 questions
What battery options does the IST7 10–40 kVA have?
Standard models take external batteries only; S models have internal 12 V 9 Ah batteries in the same cabinet size and still accept a BB5 cabinet for longer backup time. External BB5 to BB8 cabinets take 24 to 100 Ah batteries, and AEC chooses the code, cabinet and cables from your load and backup time.
Answered on IST7 10–40
How many batteries does the IST7 10–40 kVA need?
The battery voltage is set on site: the 10 kVA runs at full power from 16 to 40 × 12 V blocks per string; the 20–40 kVA at full power from 32 to 40 blocks, and at 75% of rating with 24–30 blocks. Typical battery life is 3–5 years, depending on temperature and discharges.
Answered on IST7 10–40
How many internal batteries can the IST7-10 hold?
The S model holds 16, 24, 30, 32, 36 or 40 batteries of 12 V 9 Ah (code IST7-10-32X9, for example). For longer backup the S model also takes a BB5 cabinet: IST7-10-150X9 is 30 blocks inside plus 120 in the BB5.
Answered on IST7-10
IST7 10–40: how long does each model run on battery?
Model by model, with the AEC battery options in each model's table (the battery chosen sets the figure):
| Model | Full load | Backup at full load | At half load | For example | Its backup |
|---|---|---|---|---|---|
| IST7-10 | 10 kW | 2 to 400 minutes | 5 to 958 minutes | 16 × 12 V 9 Ah (IST7-10-16X9) | 2 min at 100%, 5 at 50% |
| IST7-20 | 20 kW | 2 to 90 minutes | 6 to 400 minutes | 36 × 12 V 9 Ah (IST7-20-36X9) | 2 min at 100%, 6 at 50% |
| IST7-30 | 30 kW | 4 to 52 minutes | 11 to 224 minutes | 36 × 12 V 24 Ah (IST7-30-36X24) | 4 min at 100%, 15 at 50% |
| IST7-40 | 40 kW | 3 to 35 minutes | 6 to 152 minutes | 36 × 12 V 24 Ah (IST7-40-36X24) | 3 min at 100%, 10 at 50% |
For other loads and batteries use the backup-time tool.
Each model's own page, linked in the table, gives its full answer and data.
Does the IST7-20 deliver full power with 30 batteries?
No. With 24 to 30 blocks of 12 V (±72 to ±90 cells) the IST7-20 output is limited to 75% of its rating. Full power needs 32 to 40 blocks per string.
Answered on IST7-20
Which battery cabinet goes with the IST7-20?
The catalogue pairs it with the BB5 (24 or 40 Ah), BB6 (60 Ah), BB7 (80 or 100 Ah) and BB8 (40 or 60 × 80 / 100 Ah). One example code: IST7-20-32X40, the IST7-20 with a BB5 and 32 × 12 V 40 Ah.
Answered on IST7-20
How many internal batteries does the IST7-30 S hold?
Two strings: 72 or 80 batteries of 12 V 9 Ah in total. With a BB5 added, the code goes to 200 × 9 Ah. External-only versions use 24 Ah (36–40 blocks) or 40, 60, 80 and 100 Ah batteries in BB5 to BB8.
Answered on IST7-30
What battery cabinet suits a 40 kVA IST7?
BB5 to BB8: the catalogue lists BB5 with 36–40 × 24 Ah or 30–38 × 40 Ah and BB6 with 30–36 × 60 Ah. It also lists BB7 with 30–36 × 80 / 100 Ah and BB8 with 40 or 60 × 80 / 100 Ah. For example IST7-40-34X60, a BB6 with 34 × 60 Ah. Strings of 30 blocks limit the output to 75%.
Answered on IST7-40
Installation, size and connections 5 questions
What are the IST7 10–40 kVA dimensions and weights?
The 10–20 kVA cabinet measures 250 × 806 × 880 mm (64 kg standard; 95 / 137.6 kg S), the 30–40 kVA 300 × 842 × 1250 mm (102.5 kg standard, 249.7 kg S). Leave at least 300 mm from the rear panel to the wall and 300–500 mm at the rear and sides for ventilation.
Answered on IST7 10–40
Which breakers does the IST7-10 need?
In 3/3 the catalogue recommends 32 A 3P at input and output and a 100 A 3P battery breaker, with 4 mm² AC cables and 10 mm² battery cables for about 5 m. In 3/1 and 1/1 bypass and output take 80 A 1P breakers.
Answered on IST7-10
IST7 10–40: how big is each model and how much does it weigh?
Width × depth × height and weight, model by model:
| Model | Size | Weight |
|---|---|---|
| IST7-10 | 250 × 806 × 880 mm | 64 / 95 kg |
| IST7-20 | 250 × 806 × 880 mm | 64 / 137.6 kg |
| IST7-30 | 300 × 842 × 1250 mm | 102.5 / 249.7 kg |
| IST7-40 | 300 × 842 × 1250 mm | 102.5 / 249.7 kg |
Size from AEC's CAD drawing, weight from the EMEA 2026 catalogue.
Each model's own page, linked in the table, gives its full answer and data.
What cable section does the IST7-20 need?
In 3/3: 6 mm² for the AC lines and PE and 10 mm² for the battery, for about 5 m at 25 °C, with 63 A 3P input and output breakers. In 3/1 the neutral, bypass and output cables grow to 25 mm².
Answered on IST7-20
Which breakers does the IST7-30 need?
In 3/3: 100 A 3P at input and output and a 125 A 3P battery breaker, with 16 mm² AC cables and 2 × 10 mm² battery cables for about 5 m. The maximum battery current is 82.2 A.
Answered on IST7-30
Communication and monitoring 2 questions
Which communication and monitoring options are available?
Standard: RS485, two intelligent slots, EPO, one programmable input and five programmable relay outputs, and USB export of the records. Options: SNMP card, dry-contact kit, protocol transfer card for lithium battery communication and the parallel kit.
Answered on IST7 10–40
Can four IST7-40 work together?
Yes. With the optional parallel kit (a built-in card with CAN communication and two redundant RJ45 ports) up to four units share the load, in redundant or expand mode. ECO mode is for a single UPS only.
Answered on IST7-40
Efficiency and operation 1 question
How much energy does the IST7-40 lose in a year?
At 80% load (32 kW), 8,760 hours a year, the catalogue gives 1.33 kW of losses and 11,680 kWh a year in double conversion at 96%, and 0.32 kW and 2,830 kWh in ECO mode at 99% (single UPS). Cooling is excluded; the values are indicative.
Answered on IST7-40
Warranty, service and maintenance 1 question
How efficient is the IST7 10–40 kVA, and what is the warranty?
System efficiency reaches 96% in double conversion and 99% in ECO mode (single UPS). The warranty is 3 years, extendable with a maintenance contract.